ML17339A515

From kanterella
Jump to navigation Jump to search
Forwards LER 79-036/03L-0
Date released: 07/31/2018 Download: ML17339A515


LER 79-036/03L-0:on 791128,during Power Operation,Auxiliary Feedwater Pump a Failed to Start When Tested.Cause Unknown. Surveillance Retesting Should Provide Early Detection Should Inoperability Reoccur
ML17339A516
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/28/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A516 (2)
Forwards LER 79-036/03L-0
ML17339A514
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/28/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A514 (1)