ML17339A098

From kanterella
Jump to navigation Jump to search
Forwards Special Rept for Eddy Current Exam of Steam Generator Tubing During Oct 1987 for St Lucie Unit 2.
ML17339A098
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/24/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17222A563 List:
References
L-88-469, NUDOCS 8811010410
Download: ML17339A098 (3)


Text

At". CELEBRATED DISTRIBUTION DEMONSTRATION SY'TEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8811010410 DOC. DATE: 88/10/24 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Special Rept for Eddy Current Exam of Steam Generator Tubing During Oct 1987 for St Lucie Unit 2." R DISTRIBUTION CODE:, A047D TITLE: OR COPIES RECEIVED: LTR I ENCL Submittal: Inservice Inspection/Testing/Relief from l SIZE:

ASME Code I

NOTES RECIPIENT COPIES RECIPIENT COPIES S ID CODE/NAME PD2-2 LA TOURIGNY,E LTTR ENCL 1

14 0

1 ID CODE/NAME PD2-2 PD LTTR ENCL 5 5 /

A INTERNAL: ACRS 6 6 AEOD/DSP/TPAB 1 1 ARM/DAF/LFMB 1 0 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NU BS TRACT 1 1 OGC/HDS2 1 0 LE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL EG&G ROCKHOLD g H 1 1 LPDR 1 1 NL 007 HEMMING 1 1 NRC PDR 1 1 NSIC 1 1 D

8 A

NOIR 10 ALL "RIDS" P3MIPIENIS:

PLEASE HELP US KO RZ3XJCE HASTE. CXWZACZ THE DOCUMENT COÃ5K)L DESK, ROCN P1-37 (EXT. 20079) KO EIZIMINATE YOUR NAME HUH DISTRIKlTION LISTS K)R DOCUMEÃIS YOU DON~T NEED) D,OTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 23

h I

)I l

~f l'

t

. BOX 14000, JUNO BEACH, FL 33408.0420

+Illy C3 ~~~, g ggT@KR 2 4 1988 L-88-469 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St Lucie Unit 2

~

Docket No. 50-389 Special Report Eddy Current Examination of Steam Generator Tubin - October 198 The attached Special Report is being transmitted pursuant to. the requirements of Technical Specification 4.4.5.5b. and 6.9.2. to provide the results of the steam generator tube inservice inspection completed in October 1987.

Very truly yours, W. . Conwa Senior Vice President - Nuclear WFC/MSD/cm Attachment cc: Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, St. Lucie Plant 881024 8811 010410<CK 05000389 PDR AD pDC 9

an FPL Group company