ML17338B108

From kanterella
Jump to navigation Jump to search
Forwards LER 79-012/03L-0
Date released: 07/31/2018 Download: ML17338B108


LER 79-012/03L-0:on 790806,periodic Test of T & delta-T Not Completed within Required Time Limit Due to Investigation of Unit Trip.Surveillance Completed Following Recovery from Unit Trip
ML17338B109
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/05/1979
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17338B109 (2)
Forwards LER 79-012/03L-0
ML17338B107
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/05/1979
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17338B107 (2)