MONTHYEARML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting ML23191A0662023-07-0707 July 2023 NEI 99-02 Draft Rev. 8 Update for July 2023 ROP Public Meeting ML23160A1512023-06-15015 June 2023 25 - Industry - Industry Perspectives on ASME III and XI Pre-Service Inspection ML23160A1422023-06-15015 June 2023 20 - Industry - Industry Perspective on Performance Monitoring ML23116A1892023-05-31031 May 2023 Industry Observations of NRC Licensing Program (NEI Slides May 2023) ML23136A5912023-05-18018 May 2023 NEI Safety Culture Presentation for May 2023 ROP Public Meeting ML23125A3192023-05-0909 May 2023 NEI Presentation for May 9, 2023, Public Meeting on NEI 22-05, Revision a ML23115A0302023-04-27027 April 2023 NEI Perspective on Performance Monitoring in Use of Probabilistic Fracture Mechanics for Optimizing Inspections of Non-RPV Pressure Vessels, April 27, 2023 ML23088A0822023-03-30030 March 2023 NEI Presentation - March 30, 2023 PRA Configuration Control Public Meeting ML23082A0572023-03-28028 March 2023 Proposal to Establish Alternate Requirements for Components Commensurate with Safety and Risk ML23079A2642023-03-23023 March 2023 General Visual Examination of Containment Surfaces Covered by Insulation - March 23, 2023 Public Meeting Slides from NEI ML23210A0042023-03-15015 March 2023 Destination: Termination, NRC Regulatory Information Conference ML23045A2892023-03-14014 March 2023 RIC 2023 - 03/14/2023 to 03/16/2023 Regulatory Information Conference (Ric).Operational and Safety Benefits of Risk Informed Applications ML23061A0292023-03-0202 March 2023 NEI Presentation - Advanced Reactor Digital I&C Licensing Workshop 1 ML23013A0782023-01-13013 January 2023 PI&R Inspection Discussion for January 2023 ROP Public Meeting ML23041A4342022-12-15015 December 2022 NEI Presentation for December 15, 2022 Industry Spent Fuel Activities Prioritization Meeting ML22291A4442022-10-11011 October 2022 NEI 22-01 License Termination Plan Process Presentation at October 11 2022 Meeting on NUREG-1757 Vol. 2 ML22266A2632022-09-28028 September 2022 Session 2 - Advanced Reactor Developers Perspectives on Codes and Standards ML22250A7122022-09-21021 September 2022 NEI 22-03 Presentation Slides for NRC Public Meeting (Sept. 21, 2022) ML22235A7032022-08-24024 August 2022 NEI Presentation for Aug 26, 2022 Public Meeting - Source Terms and Radiological Consequence Analyses ML22194A0682022-07-18018 July 2022 NEI Presentation for NEI 22-02 Rsi Response ML22174A2822022-06-22022 June 2022 NEI Presentation for Public Meeting with NMMSS Users Community to Discuss Foreign Obligation Reporting Requirements for Low Enriched Uranium ML22172A1352022-06-21021 June 2022 NEI Presentation for Public Meeting Industry Perspectives on Rulemaking for Greater than 5 Percent Enrichment ML22143A8542022-05-20020 May 2022 Nuclear Energy Institue (NEI) Presentation Slides to ACRS Subcommittee on CCF Secy Paper, May 20, 2022 ML22136A1162022-05-11011 May 2022 Presentation 5 - Utilizing the Nuclear Energy Institute (NEI) 07-07 Industry Groundwater Protection Initiative as a Foundation for Addressing Subsurface Site Assessments ML22088A0342022-03-29029 March 2022 Public Meeting Presentation by NEI Regarding Part 53 Rulemaking: Selected Topics ML22077A4012022-03-23023 March 2022 NEI INL Presentation March 23, 2022, NRC Workshop Isv Hfe Issue ML22070B1212022-03-16016 March 2022 Industry Perspective on IEEE Std -1819 ML22140A3612022-03-10010 March 2022 mccullumr- hv-th29 ML22060A0022022-03-0101 March 2022 Dt Public Meeting - NEI Slides ML22042A0092022-02-11011 February 2022 NEI Presentation Slides for February 15, 2022, Public Meeting on Common-Cause-Failure (CCF) Policy ML22031A2612022-01-31031 January 2022 NEI Feb 2022 PRA Configuration Control Inspection Workshop ML22027A3922022-01-27027 January 2022 NEI 50.59 Risk Insights Presentation ML21350A2122021-12-17017 December 2021 Slide Presentation: ACRS Future Plant Designs Subcommittee Meeting, 10 CFR Part 53, Licensing and Regulation of Advanced Nuclear Reactors - Presentation by Nuclear Energy Institute and Us Nuclear Industry Council ML21335A2602021-12-0202 December 2021 ROP Public Meeting Gtg PI 12022021 ML21334A3562021-11-29029 November 2021 Fire Protection-ROP Public Meeting-120221 ML21223A1002021-08-11011 August 2021 NEI Slides for Public Meeting on Reg Guide 1.9, Rev.5 - Revised 8-11 ML21221A2962021-08-11011 August 2021 NEI Slide Presentation on Regulatory Guide 1.9, Revision 5 for Public Meeting August 11, 2021 ML21187A0572021-07-0707 July 2021 July 7 Public Mtg Slides for Pre-application of NEI 16-03 & EPRI i-LAMP ML21173A0562021-06-22022 June 2021 NEI Presentation - Adversary Timeline Methodology (Final- 6.24.21) - Updated ML21173A2862021-06-21021 June 2021 NEI 20-07 Systematic Approach to CCF NRC 2024-01-09
[Table view] |
Text
Mark Richter Additive Manufacturing for Reactor Materials and Additive Manufacturing for Reactor Materials & Components:
Components-NRC Meeting Rockville, MD Industry Perspective November 28, 2017
Overview
- Industry Challenges and Current Landscape
- Additive Manufacturing and Nuclear Energy
- This Moveis anForward explanation of the main idea
Early Plant Shutdowns This is an explanation of the main idea
NEED TO PRESERVE PLANTS AT RISK Profile of fleet in 2020s shaped by ability for marginal plants to remain viable 120,000 100,000 80,000 60,000 40,000 20,000 Operating SLR Concern Declared Announced
NEED TO PRESERVE PLANTS AT RISK Profile of fleet in 2020s shaped by ability for marginal plants to remain viable 120,000 100,000 80,000 60,000 40,000 20,000 Operating SLR Concern Declared Announced
SCALE OF NEW BUILD With SLR, 20% market share requires adding ~90 GW 140,000 120,000 100,000 80,000 60,000 40,000 20,000 Operating SLR Concern Declared Announced Lg LWR SMR Advanced
NATIONAL NUCLEAR ENERGY STRATEGY CREATE THE NUCLEAR IMPERATIVE PRESERVE SUSTAIN INNOVATE THRIVE Appropriately value Create sustainability Innovate, Compete globally nuclear generation via improved commercialize, regulatory framework and deploy and reduced burden new nuclear 7
NATIONAL IMPERATIVES 8
Additive Manufacturing Strengths
- Build 3D objects by layering materials-plastics, metals, living tissues-endless potential
- Integrates sophisticated technologies
- Compliments materials removal processes in manufacturing to achieve final shape and dimensions
Create Sustainability NOW
- Preserve reliability and support long term operation
- Sustain the viability of the operating fleet
- Re-create non-OEM parts or OEM parts where design drawings are unavailable, e.g. pump impeller
- Improve part performance by removing design limitations
- Reduce manufacturing lead times and costs
- Additive manufacturing has established a decade long track record serving secondary side and BOP component needs
Innovate, Commercialize and Deploy New Nuclear
- Demonstrate cost-benefit and establish regulatory acceptance with current applications through ASME and other codes and standards
- Strong collaboration between U.S. industry, national labs and universities
- Opportunities in new plant components, new products, and fuel components
- Production of 316 SS and Inconel demonstration parts
- Low risk fuel components in a reactor by 2018
Moving Forward
- High equipment costs versus potential industry savings
- Lack of process standardization
- Process development ongoing
- Final products are near-net-shape
- This Finishing is an steps required to meet dimensional and explanation of surface finish requirements the main idea
Industry Challenge Develop innovative approaches to refine the manufacturing process and minimize investment and production costs, work collaboratively with regulatory and consensus standards bodies to achieve acceptance for broad use. Efficiency gained today supports a platform for future new nuclear deployment.