Summary of 781218 Meeting to Discuss NRC Review of Steam Generator Replacement Program:Additional Info Required Prior to Issuance of Eia
ML17338A462
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/09/1979
From: Grotenhuis M
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7901220272
Download: ML17338A462 (7)


Text

DOCKET NO.:

LICENSEE:

FACILITY:

SUBJECT:

50-250/251

~ orida Power and Light Company (FPL)

Turkey Point Unit Nos.

3 and 4 SUtlARY OF MEETING HELD ON DECEMBER'18, 1978, TO DISCUSS THE NRC REVIElt OF THE STEIN GENERATOR REPLACEMENT PROGRAM Back round On September 20, 1977 FPL submitted a report entit1ed "Steam Generator Repair 'Report" for NRC revi'iv.

l<i'ave been reviewing this report and hhe supplements through revision 5 dated August 4, 1978.

On December 8, 1978 FPL requested a meeting with the staff to discuss the program of the review.

The requested meeting was held on December 18, 1978.

Attendees are listed in Attachment 1.

Meetin Summar The meeting was opened by Mr. Grotenhuis, who stated the purpose of the meeting, to discuss the status of the NRC review.

The review status by NRC reviewing branches was given as folloils:

RS review completed EB PSB RSL EP review completed review will be complete by January 8, 1979 Additional information needed (letter December 15, 1978.Schwencer to Uhrig)

'additional information needed (letter December 1,

1978 Schwencer to Uhrig) environmental review not completed, pending decision on Surry (lead case) regarding impact appraisal vs impact statement D. Hhittier responded by indicating that th.e response to the December 1978 1etter was in the mai1 and that FPL was sti11'considering the d tai1s of the method of storage of the used steam generators before responding to the EEB request.

VS&.R3axl>

orricr~

OURHAMmpm'ATK~

~

~II~ ~ ~ >

OP

> ~

~

~

~ ~ ~ ~ ~I ~ ~ ~ ~ ~ I

~ ~

l r

~

~ ~ 1 ~ ~

~

~

~ ~

HRC PORN 51S (976) NRCM, 0240 4 o se oovmmHMOHT rmlHTIHo orrlcmI I ~ 1 ~

aes T ~ s

Meeting Summary for Florida Power and Light Company I

2

0. Pearson responded by indicating his concenn for the environmental decision and expressed his desire that FPL views be heard before final staff decision is made.

The subject of the environmental decision was discussed at some length during which time FPL indicated, its reasons why it could not agree that an environmental impact statement (EIS) would be required.

The staff discussed some of the concerns that made the decision difficult.

The meeting way concluded by the staff indicating that the decision regarding the Surry environmental review would be need~omM--

meet VEPCO's schedule requirements and that, since the two reviews were nearly identical, the Turkey Point environmental review would follow closely behind.

The staff also agreed that is was quite likely that

VEPCO, and FPL, would be provided hn Qpportunity to present additional pertinent information for consideration before a final

'staff decision on the need for an environmental impact appraisal or environmental impact statement.

Attachment -

1 cc:

See next page M. Grotenhuis, Project Manager Operating Reactors Branch 01 Division of Operating Reactors e

ORPI CC~

DURNAIICW DATC~

DOR:OR PM HGrotenhu s:p

~

~ 0 12/g4/.? g..........

.P.$. '

"f2/y 8" QELO................

SGol dberg '

jj"jj78"""

~

~

SEC PORht 518 (976) NRCM"02)0 Q V,l, OOVCRNMCNT TRINTINO ORRICCI I ~ Tl NI 7 ~ T

~p8 RECy

~C+,

Wp

+a*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 9, 1979 DOCKET NO.:

50-250/251 LICENSEE:

Florida Power and Light Company (FPL)

FACILITY:

SUBJECT:

Turkey Point Unit Nos, 3 and 4

SUMMARY

OF MEETING HELD ON DECEMBER 18, 1978, TO DISCUSS THE NRC REVIEW OF THE STEAM GENERATOR REPLACEMENT PROGRAM Back round On September 20, 1977 FPL submitted a report entitled "Steam Generator Repair Report" for NRC review.

We have been reviewing this report and the supplements through revision 5 dated August 4, 1978.

On December 8, 1978 FPL requested a meeting with the staff to discuss the progress of the review.

The requested meeting was held on December 18,

1978, Attendees are listed in Attachment l.

Meetin Summar The meeting was opened by Mr. Grotenhuis, who stated the purpose of the

meeting, to discuss the status of the NRC review.

The review status by NRC reviewing branches was given as follows:

RS review completed EB PSB EEB RSL review completed h

review will be complete by January 8, 1979 Additional information needed (letter December 15, 1978 Schwencer to Uhrig) additional information needed (letter December 1,

1978 Schwencer to Uhrig)

EP environmental'eview not completed, awaiting decision on Surry regarding impact appraisal vs impact statement for guidance D, Whittier responded by indicating that the response to the December 1,

1978 letter was in the mail and that FPL was still considering the details of the method of storage of the used steam generators before responding to the EEB request,

Meeting Summary for Florida Power and Light Company January 9, 1979

0. Pearson responded by indicating his concern for the environmental decision and expressed his desire that FPL views be heard before final staff decision is made.

The subject of the environmental decision was discussed at some length during which time FPL indicated its reasons why it could not agree that an environmental impact statement (EIS) would be required.

The staff discussed some of the concerns that made the decision difficult.

The meeting was concluded by the staff indicating that the decision regarding the Surry environmental review would be needed soon to meet VEPCO's schedule requirements and that, since the two reviews were nearly identical, the Turkey Point environmental review would likely follow closely behind.

The staff also agreed that is was quite likely that

VEPCO, and FPL, would be provided an opportunity to present additional pertinent information for consideration before a final staff decision on the need for an environmental impact appraisal or environmental impact statement.

~~c M. Grotenhuis, Project Manager Operating Reactors Branch kl Oivision of Operating Reactors Attachment -

1 cc:

See next page

Meeting Summary for 3-Florida Power and Light Company January 9, 1979 Docket File NRC PDR Local PDR ORBl Reading NRR Reading H. Denton E.

Case V. Stello D. Eisenhut B. Grimes D. Davis D. Ziemann P.

Check G. Lainas A. Schwencer R. Reid T. Ippolito V. Noonan J.. McGough Project Manager OELD OISE(3)

ACRS (16)

C. Parrish NRC Participants TERA J.

R.

Buchanan Licensee J. Scinto M. Cutchin

0 Attachment l LIST OF ATTENDEES NAME M. Grotenhuis G,

D. Whittier J.

A. DeMastry Orin Pearson Harold F. Reis Michael A. Bauser Al Schwencer Voss A. Moore Steve Goldberg Guy Cunningham Lake Barrett D. Neighbors R. Cleveland J.

Minns ORGANIZATION CC~:

R I

FPL FPL FPL LNRA&T (FPL)

LNRA&T FPL)

NRC'DOR:ORB¹1 NRC:DSE NRC:ELD NRC:ELD NRC:EEB NRC:DOR:ORB¹1 NRC:DSE:EP NRC:DSE:RAB

NRC fORM TQZ Il IN V.S. NUCLt AR Rt GULATO1Y COMMISSION TACK NUMSK1 g t

I I

TECHNICALASSIGNMENT CONTROL FORM 34/ OPAL NlW ASS IONMKNT NCW INSORMATION D 0 1 tOUIIItP C NTRICS SECTION I. REOUEST DATA I'REPAREO BY, lAO)

MO, DAY YR DATE PREPAflEDO /g gg IAZ) NRR CONTROL NUMBER SI (AGI REOUEST =ONT ACT 0 (AX)REOVESTE R'S INITIALS IABI REOVESTING ORGANIZATIONO OR&i IAJIAKIREOVKSTING REMARKS (Loon Io IZO cnolocfr<<l (AM) REOUESTING MO.

OAT YR.

CARGET DATE + ~

'7f Inly OSQSRIC NUNSSR IAWISHLSSTONI FACILITYNAME ISI SYSTEMS CONTROL DATA IBA) DOCKET(El F'ACIL IT Y NAME(Sf (AM) AUTHORITY Ki'C lBA) DOCKET(S)

(2)

VENDOR'S NAME (5)

(6)

REPORT IDENTIFICATIONSYMBOI.

IOA) PROPRIETARY (P)

(AR) INITIATION OATS LICCNSCC (AT)Rt 1 oONSK OATC MO.

OAY YR.

ta x> 18 (AVI,LICCNSING MO OAY ACTION COMPI CTC MO PAY YR tz'w> 1S (ASI ADDITIONALINFORMATION REDDEST DATE MO.

DAY YR.

(Ay) +IISNO,PCC CSASSO

~

O II

-lv O

v IEA) NON PROPRIE'TARY VERSION (NP)

(F AINON.PROPRIETARY REPORT ECTIONK RI;V(EWDATA PREPARED BY:

MO.

OAY YR.

fu.~

PREPARED

/Q IAclA lvlTYc(IOK IEnINon R"IPI soNIT RNlted PII f for EPTIionnont Rouhd ol ~ c"loiAnlnIuss Reulod" IJHK 4 swoon Noedo cowes KIval onocns s SRCMPTIons IISI (SII PLANT SURVKILLANCK ISSU IMP<

LTR.

TO LICK II CC CONTRACT MGMT.

NOIoRK*CTOR RK V, ISKI IL)I RKG.GUIOCS ~ STP. RKV, INOUSTRY COOKS S STP.

(721 LIC.AM(NO.S TS OPKROTOR LICKNSING IS)I leONOIOUTINK RKSPONSK Nfl SYSTKM.CVAL,PROGRAM.

1431 GKNKRICIA,S,C,PI Isfl Rttt ARCH ACTIVITIf5 ISSI CORRKSPONPKNCK AKAIIN I171 ATIVt (SNKI

~OST OL HtARING (25)

IS(I TOPICAL RCPORT RKV.

OTHK1 GKNK11C

("X"CPPfoPf(off column/

ASSIGNED ORGANIZATION IKSI AOOR OR F 1 0102 ORBS OSISS AOOT CKS RS APSO RSPS RSLS APK MTCS SCS AORS AS CP ~

AOPS CSS OSSA APKT CSS CCS AOK~

CPSl CPCS AOSA AAS CTS ~

R*S ADST GSS HMS AIG PS US OP M APL1 LWRI LWRS LWRS LWRS AOSP LMS S APOA PIN ISC ~

OI.~

OAS REVIEWER'S SURNAME (CA) REVIEWER'S (NITIALS4 (CBI ESTI ~

MATEO HOURS ICC) ESTIMATED (CD) ACTUAL COMPLET)ON DATE BRANCH COORDINATING LEAD RESPONSE LC RCVICWCR (PII (5

MO., DAY YR.

MO.

DAY YR.

RESPOND INDIVIDUALLY APO ~ CRTINCNT COMMKNTS 'TO

~ ACR OP FORM COPIES TOI

1. RCOUCSTKR 2, MPAIMANAGCMCNTS INS ORMATIONSCICNCC BRANCH SICVIKWINGBRANCH C FORM IS1 (2 TSI