TURKEY POINT UNIT NO.
3 STEAM GENERATOR INSPECTION PROGRAM PLANNED FOR JANUARY 1979 l.
Eddy Current testing of U-bends is planned as follows:
a)
Steam Generator B, rows 2-5, columns 1-92; unplugged tubes will be tested at 100 KHZ using beaded flex 0.540 probe.
b)
Any tube(s) which give indication at 100 KHZ will be reprobed using 400 KHZ.
2.
Hot leg tube gauging will be conducted on all three steam generators utilizing three different sized eddy current probes
(.540 in 610 in.,
and -650 in. diameters).
The unshaded areas on the attached tube map identify, the tubes to be probed.
3.
Cold leg tube gauging will be conducted on all three steam generators utilizing two different sized eddy current probes
(.540 i'. and
.610 in.).
The dashed line on the attached tube map indicates the extent of the cold leg gauging.
4.
Wrapper to shell annulus measurements will be made on Steam Generator B.
5.
Handhole inspections using TV and/or photographs will be used to inspect the flow slots and determine the extent of hourglassing on the Nl tube support plates in Steam Generators A, B, and C.
6.
A Reg.
Guide 1.83 inspection will be performed.
7.
Preventive plugging based upon the inspection results.
V812180 l~ l
( ~
A 0
J SFRIES 44
/
~
. ~ ~
~
~
r
/
ql 0'}I3>m%8 ! I11751'b7l NDCSL'SQ59Q 5S 535l~R4')4S4541 3937353331 292725232i Sl7 15 l3 ll 9 "/ 5 3 l
~ p OOQL9 N 1L 70 OLLLC
~r Sg Sgr~ (
C 33L 3
lGXL 2
<e le << ia lO 8 so
.COLUMNS 2
0 00 K
~
~
J
~
~ /-
0
~
~
OQ NOZZLE~
42 Q0 39 30 36 3A 32 3l 30 28 29 26 25.
24 22 20 Ie" l7 IG l5 II I2
'l 2
RONfS
,e'
~
~ ".
I
".7-u R.K;6 p" PDJVF g
t
~ /
~
t
~ ~