ML17335A516

From kanterella
Jump to navigation Jump to search
Forwards LER 99-002-00 Re Failure to Perform TS Surveillance Test for Pressurizer Porvs.Commitment Made by Util Listed
Date released: 05/31/2018 Download: ML17335A516


LER 99-002-00:on 990112,determined That RCS Pressurizer PORVs Had Not Been Tested,Per Ts.Caused by Inadequate Scheduling Controls Allowing Personnel Error.Surveillance Procedure Was Completed & Updated LER Will Be Submitted
ML17335A517
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/11/1999
From: Kosloff D
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17335A517 (5)
Forwards LER 99-002-00 Re Failure to Perform TS Surveillance Test for Pressurizer Porvs.Commitment Made by Util Listed
ML17335A515
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/11/1999
From: Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A515 (3)