MONTHYEARML20083F1492020-07-0606 July 2020 Summary of Meeting to Discuss Digital Instrumentation and Control, Integrated Action Plan, Modernization Plan #3, Acceptance of Digital Equipment, Nuclear Energy Institute 17-06 ML20069A7452020-05-14014 May 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss WCAP-16097, Revision 5, Common Q Platform Topical Report ML19273A8942020-01-15015 January 2020 November 6, 2019, Summary of Meeting to Discuss Nuclear Energy Institute 17-06 ML19247C0532019-09-24024 September 2019 Summary of Meeting Between the NRC Staff and NEI to Discuss Revised Guidance Documents: Inspection Manual Chapter (IMC) 0326 and NEI 18-03 ML19226A1102019-09-0909 September 2019 Summary of August 21, 2019, Meeting to Discuss the Nuclear Procurement Issues Corporation Process and the Plans for Nuclear Energy Institute 17-06 ML19151A7552019-06-17017 June 2019 Summary of Meeting to Discuss Nuclear Energy Institute'S Perspective of American Society of Mechanical Engineers Code Compliance and Operability Determinations ML19064B4042019-03-13013 March 2019 Summary of Meeting Between the NRC Staff and the Nuclear Energy Institute Regarding Nei'S Perspective of ASME Code Compliance and Operability Determinations ML18302A0032019-01-15015 January 2019 Summary of Meeting to Discuss Operability Determination/Corrective Action Program Interface Definitions ML18305A7552019-01-15015 January 2019 Summary of Closed Teleconference on PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance. ML18267A0042018-10-0303 October 2018 Summary of Meeting to Discuss Digital Instrumentation and Control Integrated Action Plan, Modernization Plan #3 ML18204A0222018-10-0101 October 2018 August 30, 2018, Summary of Meeting to Discuss the Nuclear Energy Institute Introduction of Entry Criteria for Operability Determinations ML18232A1082018-09-26026 September 2018 Summary of 08/30/2018, Meeting to Discuss the Draft Safety Evaluation for PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML18179A3622018-07-16016 July 2018 June 28, 2018, Operability Meeting Summary ML18155A0042018-07-0909 July 2018 Summary of May 24, 2018, Meeting to Discuss Digital Instrumentation and Control Common Cause Failure ML18142A2502018-06-0707 June 2018 Summary of Meeting with Nuclear Energy Institute and Industry to Discuss Anchor Darling Fate Valve Draft Temporary Instruction ML18136A5052018-05-30030 May 2018 Summary of Conference Call to Discuss the Use of Strategic Alliance for FLEX Emergency Response Resources to Support Exigent Situations ML18082A0292018-04-23023 April 2018 March 29, 2018, Summary of Meeting to Discuss the Roadmap for Proposed Industry-Wide Monitoring Program and RAI Response Templates ML18009A6382018-04-0909 April 2018 Summary of Biweekly Conference Calls to Discuss Fleet-Wide Response to Draft Requests for Additional Information Related to Generic Letter 2016-01 ML18065A0402018-03-26026 March 2018 February 14, 2018, Summary of Meeting with the Nuclear Encergy Institute and Industry to Discuss Anchor Darling Gate Valve Part 21 Issues ML17335A4232018-01-22022 January 2018 Summary for 12/13/2017 NEI 16-16 Meeting ML17331A4852017-12-22022 December 2017 Summary of 11/30/2017 Meeting on NEI 96-07, App D, Section 4.3.6 2020-07-06
[Table view] Category:Memoranda
MONTHYEARML20083F1492020-07-0606 July 2020 Summary of Meeting to Discuss Digital Instrumentation and Control, Integrated Action Plan, Modernization Plan #3, Acceptance of Digital Equipment, Nuclear Energy Institute 17-06 ML20069A7452020-05-14014 May 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss WCAP-16097, Revision 5, Common Q Platform Topical Report ML19273A8942020-01-15015 January 2020 November 6, 2019, Summary of Meeting to Discuss Nuclear Energy Institute 17-06 ML19247C0532019-09-24024 September 2019 Summary of Meeting Between the NRC Staff and NEI to Discuss Revised Guidance Documents: Inspection Manual Chapter (IMC) 0326 and NEI 18-03 ML19226A1102019-09-0909 September 2019 Summary of August 21, 2019, Meeting to Discuss the Nuclear Procurement Issues Corporation Process and the Plans for Nuclear Energy Institute 17-06 ML19151A7552019-06-17017 June 2019 Summary of Meeting to Discuss Nuclear Energy Institute'S Perspective of American Society of Mechanical Engineers Code Compliance and Operability Determinations ML19064B4042019-03-13013 March 2019 Summary of Meeting Between the NRC Staff and the Nuclear Energy Institute Regarding Nei'S Perspective of ASME Code Compliance and Operability Determinations ML18305A7552019-01-15015 January 2019 Summary of Closed Teleconference on PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance. ML18302A0032019-01-15015 January 2019 Summary of Meeting to Discuss Operability Determination/Corrective Action Program Interface Definitions ML18267A0042018-10-0303 October 2018 Summary of Meeting to Discuss Digital Instrumentation and Control Integrated Action Plan, Modernization Plan #3 ML18204A0222018-10-0101 October 2018 August 30, 2018, Summary of Meeting to Discuss the Nuclear Energy Institute Introduction of Entry Criteria for Operability Determinations ML18232A1082018-09-26026 September 2018 Summary of 08/30/2018, Meeting to Discuss the Draft Safety Evaluation for PWROG-15060, Pump Suction Gas Accumulation Operability Criteria Guidance (CAC No. MF8075; EPID L-2016-TOP-0006) ML18213A2852018-08-13013 August 2018 Aug. 1, 2018 Summary of Closed Meeting with Doosan Hf Controls to Discuss the Revision of Amendment 4 to the Doosan Hf Controls-6000 Safety System ML18179A3622018-07-16016 July 2018 June 28, 2018, Operability Meeting Summary ML18155A0042018-07-0909 July 2018 Summary of May 24, 2018, Meeting to Discuss Digital Instrumentation and Control Common Cause Failure ML18082A0292018-04-23023 April 2018 March 29, 2018, Summary of Meeting to Discuss the Roadmap for Proposed Industry-Wide Monitoring Program and RAI Response Templates ML18065A0402018-03-26026 March 2018 February 14, 2018, Summary of Meeting with the Nuclear Encergy Institute and Industry to Discuss Anchor Darling Gate Valve Part 21 Issues ML17335A4232018-01-22022 January 2018 Summary for 12/13/2017 NEI 16-16 Meeting 2020-07-06
[Table view] |
Text
K. Hsueh UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 22, 2018 MEMORANDUM TO: Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation FROM: Joseph J. Holonich, Senior Project Manager /RA/
Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF DECEMBER 13, 2017, MEETING TO DISCUSS STAFF COMMENTS ON NEI 16-16 [DRAFT 2]
On December 13, 2017, U.S. Nuclear Regulatory Commission (NRC) staff met with representatives from the Nuclear Energy Institute (NEI). The purpose of the meeting was to discuss staff comments on NEI 16-16 [Draft 2], Guidance for Addressing Digital Common Cause Failure. All information related to the meeting and discussed in this summary can be found in the Agencywide Documents Access and Management System (ADAMS) package accession number ML17331B029.
The NRC staff opened the meeting by presenting information related to the work on NEI 16-16.
In its opening comments, NEI stated that it was pleased with the progress being made on the development and review of NEI 16-16.
During the NEI presentation, there was a detailed discussion of the NEI figure depicting the meaning of sufficiently low when determining software common cause failure (CCF) likelihood.
In the discussions, NEI explained that NEI 16-16 was intended for use by design engineers.
The approach for a design engineer would be to determine if all the applicable preventive measures (P Measures) have been or can be applied for a source of CCF.
If all the P Measures can be and are applied to a source of CCF, then a CCF will not be a concern. If not all of the P measures are applied, then the design engineer would have the option to reduce the likelihood by applying likelihood reduction measures for a CCF in their entirety. NEI stressed that ultimately NEI 16-16 was intended for determining if a system was susceptible to a CCF. Some discussion was held on the definition of CCF and the NRC agreed to review the notes added by NEI to the agreed upon definition.
CONTACT: Joseph J. Holonich, NRR/DLP/PLPB 301-415-7297
D. Morey NEI stated that it would remove the use of best-estimate techniques in NEI 16-16 when a CCF is not sufficiently low because NEI subject matter experts in The Code of Federal Regulations, Title 10, Section 50.59, Changes, tests, and experiments, (10 CFR 50.59) indicated that using best estimates were not appropriate for answering 10 CFR 50.59 questions. In addition, NEI also explained that the intent was to focus NEI 16-16 on providing only technical engineering design guidance and not be coupled to 10 CFR 50.59 licensing criteria.
NEI intends to have NEI 96-07, Appendix D, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications, to only be licensing focused, and not coupled with technical methods. Later during the presentation, NEI stated that NEI 16-16 provides useful technical basis for addressing 10 CFR 50.59 Questions 5 and 6, but it cannot be used for answering 10 CFR 50.59 Questions 1 and 2.
NEI agreed to take an action to develop industry input on the suggested regulatory basis for NEI 16-16, and NEI will be ready to discuss this with NRC staff in January 2018.
NEI also provided feedback on the staff comments on NEI 16-16. Although this was not discussed in detail in the meeting, NRC staff agreed to review the information provided. A copy of the document is provided in the ADAMS package for the meeting.
NRC staff provided a brief summary and schedule of the Modernization Plan (MP)-1C activities.
NEI asked if they would be able to review and provide comments on the Commission Paper.
NRC staff explained that the SECY is an internal NRC document that is not released for public comment, unless the Commission decides to do so. NRC staff noted that all public interactions, discussions, and recommendations relevant to NEI 16-16 are informing the Commission Paper.
Following the technical discussions, the path forward was discussed. As a result of those discussions it was agreed that NEI would develop a list of future meetings across all the work activities for the first quarter of Calendar Year 2018. A conference call would be held to discuss the meetings and establish dates the week of January 8, 2018.
In closing, NEI stated that it saw a common understanding being developed between NEI and the NRC Staff.
Actions from the meetings included:
- 1) NRC staff will look at the NEI definition of CCF.
- 2) NEI will provide a suggested regulatory anchor for NEI 16-16.
- 3) NEI will develop a list of meetings for the first quarter of Calendar Year 2018 and a conference call will be held the week of January 8, 2018, to schedule the meetings.
- 4) NRC staff will evaluate the feedback provided by NEI on the NRC staff comments on NEI 16-16.
Docket No. 99902028
Pkg. (ML17331B029); (ML17335A423);
- via e-mail NRC-001 OFFICE DLP/PLPB/PM* DLP/PLPB/PM DLP/PLPB/PM NAME JHolonich DMorey JHolonich DATE 1/17/2018 1/22/2018 1/22/2018