ML17335A376

From kanterella
Jump to navigation Jump to search
Forwards LER 98-046-00, Auxiliary Feedwater Sys Unable to Meet Design Flow Requirements During Special Test, Per 10CFR50.73.Commitments Made by Util,Listed
Date released: 05/31/2018 Download: ML17335A376


LER 98-046-00:on 981103,determined That Afs Was Unable to Meet Design Flow Requirements During Special Test.Caused by Failure to Consider All Aspects of Sys Operation in Design of Suction Basket Strainers.Sys Will Be Redesigned
ML17335A377
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/03/1998
From: Gebbie J
INDIANA MICHIGAN POWER CO.
To:
References
Download: ML17335A377 (6)
Forwards LER 98-046-00, Auxiliary Feedwater Sys Unable to Meet Design Flow Requirements During Special Test, Per 10CFR50.73.Commitments Made by Util,Listed
ML17335A375
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/03/1998
From: Sampson J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A375 (3)