Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] |
Text
'CATEGORY 1
~
REGULATORY INFORMATION DISTRIBUTIO 'YSTEM (RIDS)
ACCESSION NBR:9811120202 DOC.DATE: 98/11/04 NOTARIZED: YES FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 DOCKET I AUTH. NAME '. AUTHOR AFFILIATION POWERS,R.P. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Provides supplemental info requested by memebers of NRC staff during 981031 telcon,provide limiting date of Jan 31, 2001 for surveillance extension 6 replace proposed footnote requested in ltr AEP:NRC:1295 with new license condition. A DISTRIBUTION CODE: AOOID TITLE: OR Submittal: General Distribution COPIES RECEIVED:LTR I ENCL J. SIZE: .15 T E
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD3-3 LA 1 PD3-3 PD 1 1 STANG,J. 1 1 INTERNAL: 1 1 NRR/DE/ECGB/A 1 1 SZZR~0'RR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1' NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 OGC/HDS3 1 0 EXTERNAL: NOAC NRC PDR 1 1 D
'N NOTE TO ALE NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 12
Indiana Michigan Power Company 500 Circle Orive Buchanan, Ml 491071395 INOIANA MlCHIGAN POWM November 4, 1998 AEP: NRC: 1295A Docket No. 50-315 U..S. Nuclear Regulatory Commission ATTN: Document Control Desk, Mail Stop 0-Pl-17 Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 1 STEAM GENERATOR SURVEILLANCE EXTENSION FOR UNIT 1 SUPPLEMENTAL INFORMATION Gentlemen:
The purpose of this letter is to (1) provide supplemental information requested by members of your staff during an October 9, 1998, phone discussion; (2) provide a limiting date of January 31, 2001, for the surveillance extension; and (3) replace the proposed footnote requested in letter ABP:NRC:1295 with a new license condition.
The supplemental information requested by your staff is included in attachment 1. The description of proposed changes is contained in attachment 2. The proposed, revised Facility Operating License page is contained in attachment 3. The existing Facility Operating License . page, which is marked to reflect the proposed changes, is contained in attachment 4.
These proposed changes have been reviewed and approved by the plant nuclear safety review committee and the nuclear safety and design review committee.
It is requested that your approval of this November 30, 1998.
change be provided by &g(
In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to the Michigan Public Service Commission and the Michigan Department of Public Health.
98iii20202 98ii04 PDR ADOCV. OSOOOsiS P PDR
U. S. Nuclear Regulatory Commission AEP:NRC:1295A Page 2 This letter is being submitted pursuant to 10 CFR 50.54 (f) and, as such, an oath statement is enclosed.
Sincerely, RE P. Powers Vice President SWORN TO D SU SCR D BEFj)RE ME DAY OF 4C 1998 Notary blic VALERlE L BLWELL 5',Commission Expi )Wry Pubhc, Berlin Gaunt', N Wl p .BOI
,"/j'mc Attachments c J. A. Abramson, w/attachments J. L. Caldwell, w/attachments MDEQ DW 6 RPD, w/attachments NRC Resident Inspector, w/attachments J. R. Sampson, w/attachments
Ill lggggg 1,, '~If t
J ir V
J rt l,
P p 1
~ 4
U. S. Nuclear Regulatory Commission AEP:NRC:1295A Page 3 bcc: T. P. Beilman, w/attachments E. R. Eckstein/D. F. Powell/D. R. Hafer/K. R. Baker J. J. Euto B. J. Hickle G. Honma FOLIO, w/attachments J. B. Kingseed/G. P. Arent/M. J. Gumns J. A. Kobyra/ST P. Hodge/J. R. Jensen/P. W. Monk/
D. H. Malin J. F. Stang, Jr., NRC Washington, DC, w/attachments
ATTACHMENT 1 TO AEP:NRC:1295A SUPPLEMENTAL INFORMATEON to AEP:NRC:1295A Page 1 In r The following information is in response to verbal NRC inquiries made during an October 9, 1998, phone discussion concerning Cook Nuclear Plant submittal ABP:NRC:1295. This supplement will document the technical issues discussed below and resolves other administrative items concerning the subject submittal.
Discuss the steam generator lay-up chemistry history from Pebruary 1998 through the present. The technical report contained within letter AEP:NRC:1295 evaluated steam generator lay-up chemistry through February 1998.
The unit 1 steam generator chemistry is being maintained with wet lay-up chemicals covering the tubes and a nitrogen blanket above the tube bundle. This practice has been used throughout the shutdown period, which commenced in September 1997 and will continue until unit restart, with the exception of brief'eriods when the chemicals are replenished due to decomposition or when system maintenance needs require a short drain down period.
At the beginning of the shutdown period, ethanolamine and carbohydrazide were used for wet lay-up, followed by a period of ethanolamine, carbohydrazide, and hydrazine to address lower steam generator pHs. Since May of 1998, the steam generators have been in wet lay-up using ethanolamine and hydrazine.
These wet lay-up conditions meet the conditions for steam generator lay-up outlined in the EPRI secondary chemistry guidelines. Sampling for low level contaminants including sodium, chloride, and sulfate is performed three times per week, which is more conservative than the weekly frequency specified in the noted BPRI guideline. These samples indicate that the chemistry has remained stable throughout the shutdown period with contaminant levels below allowable limits's concluded in the evaluation contained in letter ABP:NRC:1295, the extended time period in wet lay-up should not result in structural degradation of the steam generators regardless of the length of the shutdown period. Therefore, we concluded the proposed surveillance extension of January 31, 2001, would not adversely affect the condition of the steam generators.
JL'iscuss from a historical perspective, the chemical excursions that have occurred within the past 2-3 years (i.e., cycles 13, 14, and 15).
to ABP:NRC:1295A Page 2
)
JL2 During cycles 13 and 14, unit 1 secondary system chemistry was maintained within EPRI recommended limits. No excursions were experienced that required entry into action level 2 or 3 chemistry, which would in turn lead to a unit power reduction or shutdown.
During the cycle 15 unit 1 startup, prior to exceeding 30 percent power, the unit experienced an action level 3 excursion. This event was documented in plant condition report 95-1760.
Corrective actions resulting from the event included shutting down the unit to mode 5, draining, refilling, and soaking the steam generators three times over a ten-day period. A review of the condition report confirmed no licensee event report was required as a result of this events No other action level chemistry excursions were experienced during subsequent unit startup and power operation throughout the remainder of cycle 15 or during the first four months of cycle 16 operation.
Describe the Cook Nuclear Plant leak rate monitoring program.
The Cook Nuclear Plant program follows the BPRI revision 1 guidelines for primary-to-secondary leak rate monitoring. Our plant relies on air ejector off-gas monitoring and grab sample monitoring for xenon gas in the air ejector. The continuous monitoring by operations personnel of the off-gas activity allows identification of rapidly propagating steam generator leaks.
Additional procedure methodology allows for monitoring tritium in steam generator water as an alternate indication of primary-to-secondary leakage. This grab sample technique can be used to confirm leakage in individual steam generators or as a confirmation of air ejector off-gas leak rate indication.
JL Describe the corrective actions program implemented following a chemical excursion.
Cook Nuclear Plant has incorporated corrective action sections into its chemistry procedures. These sections, which are included in the steam generator procedure, condensate and feedwater procedure, and the steam generator wet lay-up procedure, outline EPRI action levels and responses, provide specific guidance for expected off-normal chemistry conditions, and provide guidelines for returning parameters to within the goal and limit values. II
ATTACHMENT 2 TO AEP:NRC:1295A DESCRIPTION OF PROPOSED CHANGES to ABP:NRC:1295A Page 1 D ri i n f Pr o ed h n The purpose of the proposed amendment is to modify the in-service inspection frequency, on a cycle 16 specific basis, from a calendar-based interval to an end-of-cycle interval.
This submittal requests an extension for the steam generator surveillance that must be performed during unit shutdown. Our evaluation concluded that it is not practical to perform the surveillance now, nor is it warranted to perform the surveillance before the end of the current cycle. We propose to add the following license condition, applicable to technical specification (T/S) 4.4.5.3:
2.C(8) The steam generator tube inspection surveillance requirements of technical specification 4.4.5.3 have been extended until the start of cycle 17, not to exceed January 31, 2001. In the event the steam generators are replaced at that time, the retired steam generators are exempted from further surveillance under technical specification 4.4.5.3.
B i R Due to the ongoing shutdown of unit 1, the steam generators have experienced approximately 130 effective full power days of operation since the last T/S surveillance. At this time, total accumulated cycle runtime before the 1999 T/S required surveillance date can not be predicted, due to unit startup uncertainties'owever, the steam generators will not experience operating time and conditions approaching a normal 18-month fuel cycle before the surveillance is required. The majority of elapsed calendar time between the last and upcoming 1999 T/S surveillance has been accumulated with the steam generators out of service and maintained under lay-up conditions.
A no significant hazards evaluation has been performed pursuant to 10 CPR 50.92. This evaluation is included as attachment 1 to ABP:NRC:1295, submitted on August 28, 1998. The bases and conclusions presented in that evaluation are not changed as a result of this submittal.
ATTACHMENT 3 TO AEP:NRC: 1295A PROPOSED REVISED FACILITY OPERATING LICENSE PAGES
Docket No. 315 Page 4 of 6 Amendment 2.C(4) Indiana Michigan Power Company shall implement and maintain, in effect, all No. 31, 194, provisions of the approved Fire Protection Program as described in the Updated 208 Final Safety Analysis Report for the facility and as approved in the SERs dated December 12, 1977, July 31, 1979, January 30, 1981, February 7, 1983, November 22, 1983, December 23, 1983, March 16, 1984, August 27, 1985, June 30, 1986, January 28, 1987, May 26, 1987, June 16, 1988, June 17, 1988, June 7, 1989, February 1, 1990, February 9, 1990, March 26, 1990, April 26, 1990, March 31, 1993, April 8, 1993, December 14, 1994, January 24, 1995, April 19, 1995, June 8, 1995, and March 11, 1996, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
2.C(5)
Amendment The licensee is authorized to store D. C. Cook Unit 1 and Unit 2 fuel assemblies, No. 118, 136, new or irradiated up to a total of 3613 fuel assemblies in the shared spent fuel pool 169 at the Donald C. Cook Nuclear Plant subject to the following conditions:
Fuel stored in the spent fuel pool shall not have nominal enrichment greater than 4.95% Uranium-235 2.C(6) Deleted by Amendment 80.
Amendment 2.C(7) The provisions of Specification 3/4.9.7 are not applicable for loads being moved over No. 169 the pool for the duration of the spent fuel pool reracking project. Control of toads moving over the spent fuel pool during the spent fuel pool reracking project shall comply with the criteria of NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants." Administrative controls shall be in place to prevent any load not rigged in compliance with the criteria of NUREG-0612 from passing over the spent fuel pool with the crane interlocks, required by T/S 3/4.9.7, disengaged.
Amendment 2.C(8) The surveillance requirements of Technical Specification 4.4.5.3 have been No. extended until the start of cycle 17, not to exceed January 31, 2001. In the event the steam generators are replaced prior to the start of cycle 17, the retired steam generators are exempted from further surveillance under T/S 4.4.5.3.
- 2.D The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and Amendment safeguards contingency plans including amendments made pursuant to provisions No. 122 of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Donald C. Cook Nuclear Plant Security Plan," with revisions submitted through July 21, 1988; "Donald C. Cook Nuclear Plant Training and Qualification Plan," with revisions submitted through December 19, 1986; and Donald C. Cook Nuclear Plant Safeguards Contingency Plan," with revisions submitted through June 10, 1988. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
ATTACHMENT 4 TO AEP:NRC:1295A EXISTING FACILITY OPERATING LICENSE PAGES MARKED TO INDICATE PROPOSED CHANGES
'PQ
-j,l
Docket, No. 315 Page 4 of 6 Amendment 2. C (4) indiana Michigan Power Company shall implement ana maintain, No. 31, 194, ~
effect, all provisions of the approved Fire Protection Program as 208 described in the Updated Final Safety Analysis Report for the facility and as approved in the SERs dated December 12, 1977, July 31, 1979, January 30, 1981, February 7, 1983, November 22, 1983, December 23, 1983, March 16, 1984, August 27, 1985, June 30, 1986, V f I January 28, 1987, May 26, 1987, June 16, 1988, June 17, 1988, June 7, 1989, February 1, 1990, February 9, 1990, March 26, 1990, April I ES 10 133I 26, 1990, March 31, 1993, April 8, 1993, December 14, 1994, i'ASTROL(.cD January 24, 1995, April 19, 1995, June 8, 1995, and March 11, Co 1996, subject to the following provision:
GGCUi'r)FilT The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(5) S nt Fue Pool tora Amendment The licensee is authorized to store D. C. Cook, Unit 1 and Unit 2 No. 118, 136, 169 fuel assemblies, new or irradiated up to a total of 3613 fuel assemblies in the shared spent fuel pool at the Donald C. Cook Nuclear Plant subject to the following conditions:
Fuel stored in the spent fuel pool shall not have a nominal enrichment greater than 4.95% Uranium-235.
(6) Deleted by Amendment 80.
Amendment (7) The provisions of Specification 3/4.9.7 are not applicable for No. 169 loads being moved over the pool for the duration of the spent fuel pool reracking project. Control of loads moving over the spent fuel pool during the spent fuel pool reracking project shall comply with the criteria of NUREG-0612 "Controls of Heavy Loads at Nuclear Power Plants." Administrative controls shall be in place to prevent any load not rigged in compliance with the criteria of NUREG-0612 from passing over the spent fuel pool with the crane interlocks, required by T/S 3/4.9.7, disengaged.
~2.D Ph Pr io The licensee shall fully implement and maintain in ef fect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Donald Amendment C. Cook Nuclear Plant Security Plan," with revisions submitted No. 122 through July 21, 1988; "Donald C. Cook Nuclear Plant Training and Qualification Plan," with re0isions submitted through December 18, 1986; and "Donald C. Cook Nuclear Plant Safeguards Contingency Plan," with revisions submitted through June 10, 1988. Changes made in accordance with 10 CFR 73. 55 shall be implemented in accordance with the schedule set forth therein.
INSERT A 2.C(8) The steam generator tube inspection surveillance requirements of technical specification 4.4.5.3 have been extended until the start of cycle 17, not to exceed January 31, 2001. In the event the steam generators are replaced at that time, the retired steam generators are exempted from further surveillance under technical specification 4.4.5.3.