ML17335A256

From kanterella
Jump to navigation Jump to search
Submits Summary of 980825 Meeting with Plant Re Progress Toward Resolving Issues Necessary for Plant Startup Conducted.Meeting Attendees & Handout Encl
ML17335A256
Person / Time
Site: Cook  
Issue date: 09/30/1998
From: Burgess B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 9810070016
Download: ML17335A256 (6)


Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9810070016 DOC.DATE: 98/09/30 NOTARIZED: NO DOCKET I'ACIL:50-315 Donald C.

Cook Nuclear Po~er Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit. 2, Indiana M

05000316 AUTH.NAME

'AUTHOR AFFILIATION BURGESS,B.L.

Region 3 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION POWERS,R.P.

American Electric Power Co., Inc.

SUBJECT:

Submits summary of 980825 meeting with plant re progress toward resolving issues necessary for plant startup conducted. Meeting attendees 8 handout encl.

DISTRIBUTION CODE: IE45D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Summary of Significant Meeting with Licensee (Part 50)

NOTES:

E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: DEDRO NRR/DRPM/PERB RES/DET/EIB EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME STANG, J F

E CENTER CC/ROE RGN3 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

<1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

i UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION III 801 WARRENVILLEROAD LISLE, ILLINOIS605324351

'September 30, 1998 I

QIJ/

p Mr. R. P. Powers Senior Vice President Nucfear Generation Group American Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395

SUBJECT:

SUMMARY

OF THE AUGUST 25, 1998, PUBLIC MEETING TO DISCUSS D. C. COOK RESTART ACTIVITIES

Dear Mr. Powers:

This letter refers to a meeting held between the NRC and Donald C. Cook plant staff to discuss your progress toward resolving those issues necessary for plant startup conducted on August 25, 1998. This meeting was open to public observation.

The meeting opened with remarks from Mr. John Grobe and Mr. John Sampson, followed by a presentation of the restart readiness measures.

Your staff indicated that the restart readiness measures willprovide for improved ownership and accountability among the site personnel assigned responsibility for specific restart items.

ln addition, improved ownership and accountability from the restart readiness measures is monitored by utilization of work-down curves, performance indicators, and monitoring adherence to the restart schedule.

The restart readiness measures are intended to provide assurance that the activities planned for restart are accomplished in accordance with the plan.

The NRC requested that periodically, a complete set of performance indicators and work-down schedules be sent to Region III. The NRC also indicated that an inspection willbe conducted in the near future to validate the performance indicators established to monitor perfonTIance in the areas contained in the startup plan.

Other topics discussed during the meeting included the status of items included in the corrective action program, the restart schedule, ice condenser repair status, the safety system functional inspection of the auxiliary feedwater system, the status of licensing submittals, and a summary of the items contained in the NRC 0350 checklist.

Enclosure 1 is a list of meeting attendees. contains the handout provided to the NRC during the meeting.

98i00700ib 980930 PDR ADQCK 05000315 P

PDR

R. Powers In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures willbe placed in the NRC Public Document Room.

Sincerely, Docket Nos.:.50-315; 50-316 License Nos.: DPR-58; DPR-74

/s/Bruce L. Burgess Bruce L. Burgess, Chief Reactor Projects Branch 6

Enclosures:

1. Meeting Attendees
2. Meeting Handout cc w/encls:

J. Sampson, Site Vice President R. Eckstein, Chief Nuclear Engineer D. Cooper, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division Ml Department of State Police D. Lochbaum, Union of Concerned Scientists DOCUMENT NAME G 1LCOOKi0825MTG.SUM To receive a co o/thin docuntan Indicate In the hox Wn Co w/o attach/enct E" ~ Co w/attach/anct N ~ No OFFICE NAME DATE Rl B

ss/ml 9

/98 OFFICIALRECORD COPY

R. Powers Distribution:

RRB1 (E-Mail)

Project Mgr., NRR w/encls J. Caldwell, Rill w/encls C. Pederson, Rillw/encls B. Clayton, Rillw/encls SRI DC Cook w/encls DRP w/encls TSS w/encls DRS (2) w/encls Rill PRR w/encls PUBLIC IE-01 w/encls Docket File w/encls GREENS IEO (E-Mail)

DOCDESK (E-Mail)

J<

~

i,