ML17335A242

From kanterella
Jump to navigation Jump to search
Forwards Minutes of 870911 Meeting of Donald C Cook Nuclear Plant Performance Review Panel
ML17335A242
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/24/1998
From: Nolan M
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9809250269
Download: ML17335A242 (8)


Text

/

September 24, 1998

, 'i%1EMORANDUMTO:

Donald C. Cook Nuclear Plant Performance Review Panel Original signed by:

FROM:

M. Christopher Nolan, Project Manager Project Directorate III-3.

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

SUBJECT:

MINUTES OF INTERNALMEETING OF THE DONALDC. COOK NUCLEAR PLANT PERFORMANCE REVIEW PANEL The Donald C. Cook Nuclear Plant Performance Review Panel charter was announced on April 17, 1998.

One of the action items of this charter was to conduct internal meetings approximately twice per month. These internal meetings are used to discuss significant technical and performance issues, NRC regulatory approach, and inspection resources and I

priorities. Attached for your information are the minutes from the internal meeting of the panel held on September 11, 1998.

Docket Nos. 50-315, 50-316

Attachment:

As stated DISTRIBUTION Docket Files PUBLIC E. Adensam C. Nolan E. Schweibinz B. Fuller J. Maynen T. Hiltz PDIII-3 r/f DOCUMENT NAME:G:>DCCOOK>091198.mm To receive a copy of this document, indicate in the dox: "C" ~ Copy without enclo r s "E" ~ Copy with enclosures "N" = No copy NAME CNolan EBarnhi 11 Q~

OFFICE PM: PDI II-3 E

LA:PDI II-3 E

PM:PDI I E

BC:Branch6 JStang BBurgess'5

-nt AD: PDI II-3 E

RBellamy ~

DATE 09/z~/98 094%98 09/ZA 8 OFFICIAL RECORD COPY 09/s&98 09/~/98 9809250269 980924 PDR ADOCK 05000$ %5 P

PDR smRK CK~gfR mv

'I L

, MEMORANDUMTO:

Donald C. Cook Nuclear Plant Performance Review Panel Original signed by:

FROM:

M. Christopher Nolan, Project Manager Project Directorate III-3.

Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

SUBJECT:

MINUTES OF'INTERNALMEETING OF THE DONALDC. COOK NUCLEAR PLANT PERFORMANCE REVIEW PANEL The Donald C. Cook Nuclear Plant Performance Review Panel charter was announced on April 17, 1998.

One of the action items of this charter was to conduct internal meetings approximately twice per month. These internal meetings are used to discuss significant technical and performance issues, NRC regulatory approach, and inspection resources and priorities. Attached for your information are the minutes from the internal meeting of the panel held on September 11, 1998.

Docket Nos. 50-315, 50-316

Attachment:

As stated DS RBU ON'ocket Files PUBLIC Adensam C. Nolan E. Schweibinz B. Fuller J. Maynen T. Hiltz PDIII-3 r/f DOCUMENT NAME:G:>DCCOOK<091198.mm To receive a copy of this document, indicate in the box: "C" ~ Copy without enclo r s "E" ~ Copy with enclosures "N" ~ No copy OFFICE PM:PDIII-3 E

CNolan ~

LA:PDIII-3 E

EBarnhill F PM:PDI I JStang BC:Branch6 BBurgess'5

-Ilt AD:PDIII-3 E

RBellamy ~

DATE 09/2c /98 094%98 09/M 8 OFFICIAL RECORD COPY 09/1&98 09/ >/98

~8 RE00

~P C>

nO

>>>0 qO

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20R~001 September 24, 1998 MEMORANDUMTO:

Donald C. Cook Nuclear Plant Performance Review Panel FROM:

M. Christopher Nolan, Project Manag r

Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

SUBJECT:

MINUTES OF INTERNALMEETING OF THE DONALDC. COOK NUCLEAR PLANT PERFORMANCE REVIEW PANEL The Donald C. Cook Nuclear Plant Performance Review Panel charter was announced on April 17, 1998. One of the action items of this charter was to conduct internal meetings approximately twice per month. These internal meetings are used to discuss significant technical and performance issues, NRC regulatory approach, and inspection resources and priorities. Attached for your information are the minutes from the internal meeting of the panel held on September 11, 1998.

Docket Nos. 50-315, 50-316

Attachment:

As stated

C

MINUTES: 'nternal Inspection MC 0350 Restart Panel Meeting on D. C. Cook Nuclear Plant DATE:

TIME:

September 11, 1998 2:00-4:00 p.m.

ATTENDEES:

J. Grobe E. Schweibinz R. Bellamy B. Burgess B. Bartlett J. Stang M. Holmberg J. Maynen C. Nolan iscussion To ics:

1) Agenda-Discussed agenda topics for the Inspection MC 0350 Restart Panel meeting to be held at D. C. Cook Nuclear Plant on September 17, 1998, at 10:30 a.m. This meeting will be held between members of the NRC Restart Panel and members of the licensee management team.

This meeting will be open for public observation and questions following the meeting.

Questions from the public willnot be accepted during the conduct of the meeting.

2) SSFI Oversight -

The licensee will conduct an internal system functional inspection (SSFI) of the auxiliary feedwater (AFW) system..The inspection is scheduled to kickoffon September 21, 1998. The licensee will present its inspection plan to Region-III on September 15, 1998. This meeting willbe open for public'observation and questions following the meeting.

Questions from the public willnot be accepted during the conduct of the meeting.

The appropriate NRC oversight of this inspection and the use of this inspection as an input into the validation of the licensee's assessment activities were discussed.

3) Validation Plan -

The NRC discussed the inspection activities that would be required to validate the effectiveness of the licensee's improvement activities prior to restart.

4) Schedule-The NRC discussed appropriate methods in which to link planned inspection activities to the licensee's restart schedule to ensure effective oversight of the restart process while minimizing the impact to licensee's restart activities., Jack Grobe stated that he will request that the licensee provide a schedule suitable for placement on the docket.

4 4