ML17335A224

From kanterella
Jump to navigation Jump to search
Confirms Plans to Conduct Meeting with Aep & DC Cook Plant Mgt to Discuss Staff Plans for Safety Sys Functional Insp of AFW Sys.Meeting Scheduled on 980915 & Will Be Held at Region III Ofc,Lisle,Il
ML17335A224
Person / Time
Site: Cook  
Issue date: 09/10/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers R
AMERICAN ELECTRIC POWER CO., INC.
References
NUDOCS 9809160335
Download: ML17335A224 (2)


Text

September 10, 1998 Mr. R. P. Powers Senior Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395

Dear Mr. Powers:

This letter corifirms our plans to conduct a meeting with American Electric Power and D. C. Cook Plant management to discuss your staff's plans for the Safety System Functional Inspection (SSFI) of the Auxiliary Feedwater System.

The meeting is scheduled for 2:00 p.m.

(CDT) on Tuesday September 15, 1998, and willbe held at the Region III Office, Lisle, Illinois.

The meeting willbe open to public observation.

Sincerely,

/s/ J. A. Grobe John A. Grobe, Director Division of Reactor Safety Docket Nos.: 50-315; 50-316 License Nos.: DPR-58; DPR-74 cc:

J. Sampson, Site Vice President R. Eckstein, Chief Nuclear Engineer D. Cooper, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division Ml Department of State Police D. Lochbaum, Union of Concerned Scientists

~.~r.'

DOCUMENT NAME: G:<COOKttDCC09158.MTG To receive e co ofthle docunten Indicate In the box W e w/o ettecNend V' vvtettecNend'tt

~ No co OFFICE Rill Rill Rill Grobe NAME Bur Sc

'nh OFFICIALRECORD COPY 9809i60335 9809iO PDR ADQCK OS0003i5 PDR DATE 09/

/9 09/

798 09/ 0/

R. Powers Distribution:

RRB1 (E-Mail)

J. Caldwell, Rill C. Pederson, Rill B. Clayton, Rill SRI DC Cook DRP TSS DRS (2)

Rill PRR PUBLIC IE=CPl Docket File GREENS