ML17335A137

From kanterella
Jump to navigation Jump to search
Forwards LER 98-019-02,which Provides Plant Test Data Gathered to Determine Error Associated W/Electric H Recombiner Temp Measurement Circuits.Changes to LER Are Marked W/Sidebar
Date released: 05/31/2018 Download: ML17335A137


LER 98-019-02:on 980320,determined That Electric Hydrogen Recombiner TS Surveillance Requirement 4.6.4.2.b.1 Was Not Met.Caused by Design Deficiency Due to Inadequate Design Change Mgt.Revised Procedures
ML17335A138
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1998
From: Carruth R
AMERICAN ELECTRIC POWER CO., INC.
To:
References
Download: ML17335A138 (6)
Forwards LER 98-019-02,which Provides Plant Test Data Gathered to Determine Error Associated W/Electric H Recombiner Temp Measurement Circuits.Changes to LER Are Marked W/Sidebar
ML17335A136
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1998
From: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A136 (2)