February 5, 1998 Mr. E. E. Fitzpatrick Executive Vice President Nuclear Generation Group American, Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395

Dear Mr. Fitzpatrick:

In a telephone conversation on February 3, 1998, between Mr. P. Carteaux and Mr. R. Bailey, arrangements were made for the administration of retake licensing examinations at the D. C.

Cook Nuclear Plant the week of May 11, 1998.

In addition, the NRC willmake an examination validation visit to your facilitythe week of May 11, 1998.

As agreed during the telephone conversation, your staff willprepare the examinations based on the guidelines in Interim Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."

The NRC regional office willdiscuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it willbe necessary for your staff to furnish the examination outlines by March 13, 1998. The operating examinations and the supporting reference materials identified in Attachment 2 of ES-201 willbe due by April 10, 1998. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested operating examinations it willbe necessary for your staff to make the simulation facilityavailable on the dates noted above.

In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that willbe in effect while the operating examinations are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (ifany) (OMB approval number 3150-0090) at least 30 days before the first examination date.

Ifthe applications are not received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

I A P'3'(

'P802i20097 980205 PDR ADQCK 05000315 V

PDR IIIIIIIIIIIIIIIIIIIIIIIII.IIIIIIIIIIII

E. E. Fitzpatrick February 5, 1998 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).

These information collections were approved by the Office of Management and Budget, approval number 3150-01 01, which expires on April 30, 2000.

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1ONRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter.

Mr. P. Carteaux has been advised of the policies and guidelines referenced in this letter. Ifyou have any questions regarding the NRC's examination procedures and guidelines, please contact D. McNeil at 630-829-9737, or me at 630-829-9705.

Sincerely, Original Signed by I1elvyn Leach Melvyn N. Leach, Chief Operator Licensing Branch Docket Nos. 50-315; 50-316 cc:

John Sampson, Site Vice President A. A. Blind, Vice President Nuclear Engineering Douglas Cooper, Plant Manager Richard Whale, Michigan Public Service Commission Michigan Department of Environmental Quality D. C. Loope, Training Department DOCUMENT NAME:G:iDRSiDCC02058.DRS To receives c ot this document, Indkats In the box 't, ~

wro stlschfend E'

with sttschlend'It' tto copy OFFICE Rill:DRS 4

Rill:DRS NAME RBailey DATE 02/

/98 MLeach Mn(

02/

/98 OFFICIAL RECORD COPY

E. E. Fitzpatrick February 5, I998 Qh1ribuihn:

Docket File PUBLIC IE-42 OC/LFDCB R. M. Gallo, NRR/HOLB J. B. Hickman, LPM, NRR DRS RIII PRR SRI, D. C. Cook B. L. Burgess, DRP