ML17334B570

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-315/OL-96-01 During Wk of 960108.No Violations Noted.Exam & Answer Key Encl
ML17334B570
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/29/1996
From: Burdick T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO.
Shared Package
ML17334B571 List:
References
NUDOCS 9602060055
Download: ML17334B570 (3)


Text

Januarv 29, 1996 Mr. E.

E. Fitzpatrick Senior Vice President Nuclear Generation Indiana Michigan Power Company 1 Riverside Plaza

Columbus, OH 43216

SUBJECT:

EXAMINATION REPORT

Dear Mr. Fitzpatrick:

During the week of January 8,

1996, Mr. C. Osterholtz of this office administered an initial license examination to an employee of your company who had applied for a license to operate the D.

C.

Cook Nuclear Plant.

At the conclusion of the examination, preliminary findings were discussed with those members of your staff identified in the enclosed report.

The applicant received a senior reactor operator (SRO) instant examination.

The applicant failed the written portion of the examination.

The applicant passed all other portions of the examination.

Your staff generated the examination materials for NRC review and administered the written examination in accordance with the NRC initial examination pilot program.

As a result of NRC examination

reviews, items for improvement and areas of the examination which did not meet NUREG-1021 guidelines were identified, and are presented in Section 3.0 of the enclosed report.

The NRC examiner required examination changes to meet NUREG 1021 guidelines, and to make the overall examination comparable to recently administered NRC operator license examinations at other facilities.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

9602060055 960129 PDR ADOCK 05000315 6

PDR

E.

E. Fitzpatrick Januarv 29, 1996 Should you have any questions concerning this examination, please contact

's at (708) 829-9707.

Sincerely,

/s/ T. M. Burdick Thomas M. Burdick, Chief Operator Licensing Branch Docket No. 50-315 Docket No. 50-316

Enclosures:

l. Examination Report No. 50-315/OL-96-01 (DRS)
2. Simulator Fidelity Report 3.

Post Examination Written Examination Comments and Results

4. Examination

& Answer Key (SRO) cc w/encls 1, 2, 3

& 4:

D.

C.

Loope, Training Manager Distribution:

Docket File w/encls 1,

2

& 3 PUBLIC IE-42 w/encls 1, 2, 3

& 4 RIII PRR w/encls 1,

2

& 3 OC/LFDCB w/encls 1,

2

& 3-RMB/Fees, RIII w/o encls

LPM, NRR w/encls 1,

2

& 3 DRS w/encls 1,

2

& 3 A. B. Beach, RIII w/encls 1,

2

& 3 IPAS w/encls 1,

2

& 3

SRI, D.

C.

Cook w/encls 1,

2

& 3 DRP w/encls 1,

2

& 3 cc w/encls 1,

2

& 3:

A. A. Blind, Site Vice President John

Sampson, Plant Manager James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health DOCUMENT NAME:

G'DRSiDCC96-01.0L To receive e copy of this document, indicate In the box: "C" ~ Copy without ettechment/enclosure E" ~ Copy with ettechment/enclosure "N" ~ No copy OFFICE NAME DATE RIII COsterholtz j 01/

/96 RIII TBurdick 01/

/96 OFFICIAL RECORD COPY

)

l'