September 23, 1987 Docket Nos.
50-315 and 50-316 Mr. John Dolan, Yice President Indiana and Michigan Electric Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Dolan:
DISTRIBUTION:
NRC PDR Local PDR PDI II-3 r/f DWigginton GHolahan PKreutzer OGC-Bethesda EJordan JParlow ACRS (10)
By letter dated April 10, 1986, the Indiana and Michigan Electric Company advised the Commission of agreement with the conclusions in WCAP-11092, "Investigations on Undervoltage Trip Attachments for Cause of Misoperation at D. C.
Cook Unit 2 on 10/29/85."
Our contractor, Franklin Research
- Center, has completed its review of the report and we agree with their findings.
We do not believe that the WCAP-11092 has adequately addressed the issues on the breaker failure but we do believe that the matter should no longer be directed through the Indiana and Michigan Electric Company.
We will pursue the matter directly with the vendor.
We appreciate the IMEC assistance in this matter and commend you for the management attention and devotion to safety.
If you have any further questions in this matter, please let us know.
A non-proprietary copy of the Franklin Research Center technical evaluation report is enclosed for your information.
Sincerely,
Enclosure:
As stated cc:
See attached list David L. Wigginton, Acting Director Project Directorate III-3 Division of Reactor Projects Office Of Nuclear Reactor Regulation Office:
LA/PDIII-3 PM/PDIII-3
/D 6P Surname:
PK er D igginton/tg G
ahan Date:
07 g/87 0 /i /87
/
7
a
~r C'
3 I
II vl
'll
))i
'Kp
~
4
Mr. John Dolan Indiana and Michigan Electric Company Donald C.
Cook Nuclear Plant CC:
Mr. M. P. Alexich Vice President Nuclear Operations American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgeman, Michigan 49106 W. G. Smith, Jr., Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366 Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Region Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 J. Feinstein American Electric Power Service Corporation 1 Riverside Plaza Co lumbus, Ohio 43216