ML17334B028

From kanterella
Jump to navigation Jump to search
Forwards Vol 1 of Dcrdr - Summary Rept, Vol 2 of Dcrdr - App & Vol 3,Books 1 & 2 of Dcrdr - Clo/Hed Descriptions & Assessments, Per 840928 Ltr & NRC 850712 Modified Confirming Order
ML17334B028
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/30/1986
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17334B029 List:
References
AEP:NRC:0773V, AEP:NRC:773V, NUDOCS 8701070345
Download: ML17334B028 (447)


Text

REGULATORY GRADATION DISTRIBUTION SY N (RIDS)

ACCESSION NBR 8701070345 DOC. DATE: 86/12/30 NOTARXZED: NO DOCKET 0 FAC IL: 50-315 Donald C. Cook Nuclear Pomer Planti Unit i. Indiana 0 05000315 50-316 Donald C. Cook Nuclear Power Plant Unit 2 Ind,iana 5, 05000316 AUTH. NANE AUTHOR AFFILIATION ALEXICH,N: P. Indiana Zc Michigan Electric Co.

RECIP. NANE RECXPIENT AFFILIATION DENTON> H; R. Office of Nuclear Reactor Regulation. Director (post 851125

SUBJECT:

Forwards Vol 1 of "DCRDR Summary Rept> " Vol 2 of "DCRDR App" 5 Vol 3>Books 1 5 2 of "DCRDR CLO/HED Descriptions 0 Assessments " per 840928 ltr 5 NRC 850712 modified confirming order.

wF g &p7V .

CODE:

TITLE: OR/Licensing A003D COPIES RECEIVED: LTR ( ENCL + SIZE:~~

Submittal: Supp l 1 to NUREQ-0737(Qeneric Ltr 82-33)

D+lv'XSTRIBUTION NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID-CODE/NAl'tE LTTR ENCL ID CODE/NANE LTTR ENCL PMR-A ADTS PWR-A EB 1 PMR-A EICSB PWR-A FOB PMR-A PD4 LA 1 PMR-A PD4 PD 7 WIQQXNQTON D 1 1+ PWR-A PSB 1 PMR-A RSB 1 4 INTERNAL: ADN/LFNB 1 IE/DEPER/EPB NRR BMR ADTS , 1 NRR PAULSONi M NRR PMR-9 ADTS 1 NRR/DSRO ENRIT NRR/DSRO/EXB 1 NRR/DSRO/RSIB REQ FILES RGN3 EXTERNAL: LPDR NSI C 2 2+ NRC PDR 1 1+

D I 'Sl ~

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL

C

~~ )' 4 ij'.

I WU~W 'r .a "k'4 kj p v

tr Ijl

")I +

jl Ij I kk k "~Sg

.,P.C>F)<kj i ",W3 i ~

"k r'f "l kk Ik lF" ~'

jj 1'j,rr','g $ f jj r'kj'" kN

<" r "

QcQ g jlgkk ~k g=+ "'"err J r

'l ~ $

K ri kk'Q rk rl iQ kj 'Ld "k r t'3 r, ~

h

" 'lj "."I F~ ) kkii ',

jk',.ll, jj~~ > '-k k I'I

'k r I, 'I Q gi: lip,

'I kk Ir, lk Ik a t

INDIANA 8 MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 December 30, 1986 AEP:NRC:0773V Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 DETAILED CONTROL ROOM DESIGN REVIEW

SUMMARY

REPORT Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

The purpose of this letter is to transmit the D. C. Cook Nuclear Plant Units 1 and 2 Detailed Control Room Design Review (DCRDR) Summary Report which includes our corrective action plan and a proposed schedule for implementation. This report is submitted in accordance with our letter AEP:NRC:0773I, dated September 28, 1984, and the subsequent U.S. Nuclear Regulatory Commission Modified Confirming Order dated July 12, 1985.

In our September 28, 1984 letter we also committed to providing semi-annual DCRDR status reports until submittal of this Summary Report. In the final semi-annual status report, dated September 30, 1986, we indicated that work was'ontinuing on control room enhancements. We believe the enhancements we have already implemented, and those we intend to implement during 1987, are noteworthy--particularly in light of the considerable effort required in applying the NUREG-0700 guidelines to the all-vertical main control panels and the unique annunciator system at the Cook Plant. Volume 1, Section 6.0, pages 6-1 thxough 6-3 of the attached summary report provide descriptions, and Table 6.1 provides the updated status of these enhancement tasks. There are thirty-one tasks listed in Table 6.1; twelve are completed; seven are well under way and planned for completion in the first quarter of 1987; four are planned for completion during the next refueling outage for each unit; and the remaining eight long-term tasks are planned for completion by the end of 1987.

The corrective action plan does not include the Safety Parameter Display System (SPDS). The SPDS was implemented on March 31 of this year. The SPDS was reviewed but we did not have time to complete an assessment and determine corrective actions, if necessary, for inclusion in this report. As verbally requested, the SPDS has been reviewed and the preliminary evaluation of the documented departures from guidelines has been included in the summary report (refer to volume 1, page 7-2). The SPDS assessment and corrective action planning activities are planned for late 1987. On>

8701070345 861230 I PDR ADOCK 05000315 f

~~ 'DR

J N

/

Mr. Harold R. Denton AEP:NRC:0773V The overall corrective action plan, outlined in the attached DCRDR Summary Report, augments and enhances the inherent advantages of our U-shaped/vertical board control room design. Substantial control room operator input and feedback was incorporated into the various corrective action designs. We believe the overall implementation schedule shown in Table 6.1 and Table 6.2 corrects the highest-priority human factor problems in the most expedited manner practical within the constraints of our current outage schedules and other ongoing work.

Please note that major modifications requiring unit outages are scheduled to begin in approximately April 1987. In this light, we respectfully request that you conduct your review taking into account the time schedule outlined in NUREG-0737, Supplement 1. A timely review will enable us to resolve issues that may arise, prior to starting our major modification program.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, M. P. lexich Vice President cc: John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman(w/ attachment)

J. G. Keppler - Region III(w/ attachment)

p7-o/0 M~ M CLOIHEDII 7. I Cr Aer'on + &. 7 . I. 7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH ME LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY J.

t+

Cl Cl CS Cl

~ ~

CLOWED¹ 7.i- 1 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS, PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION IK, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0I OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM'OW FULL NO LOW -

NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED.

EXPLANATION OR JUSTIFICATION 'I M P MSCs Vi'u~K (u uIm

~ 5 SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~M

~Egad

Cl S

'LOIHEDN 7 f ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Lo Category I High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

4 S

Cl

CLOIHEDN 7, EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY CI FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED I." PARTIALLYAPPROVED Q NO ACTION D OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM': LOW FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANAT OR JUSTIFICATIO c'

+7 SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE ~EEk

CLO/KEDN T, f -Q

(-7.47~ ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) . IG MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIU Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; 'corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

<4p E

Cl

CLOIHEDN 7, EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS .=

PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION N APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION .0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES SOLVED RESOLVED EXPLANATION OR JUSTIFICATION

\ i 0 S .C s is~.

9'IGNOFF H.F. CONSULTANT (ESSEX)

.AEPSC PROGRAM LEAD ENGINEER DATE ~/~

DATE .llOl(

Q CLO/HEDN 7, t- 0' ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) Hl G H ME D IUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Ol Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category'II - Low priority; corrective action is recommended.

~

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

V A

CLOtHED¹ 7,i EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION jE. APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ', LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPL'ANATION OR JUSTIFICATION I M 0-WSW Vc'~caSa Cc uIw S, ~ 5 SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~M

CLOIHEDN 7 ) 5 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIU 'OW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I ~

High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

CATEGORY 'SSESSMENT

1 CLO/MED¹ 7 1I EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY Cl FURTHER REVIEW BY G FURTHER REVIEW BY DISPOSITION Q, APPROVED CI PARTIALLY APPROVED 0 NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H. MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE EXPLANATION OR JUSTIFICATION

'\

S,' r, QgC.g.

RESOLVED a

'~ji.g~iobe, s 5

e0 C

leg SIGNOFF H.F. CONSULTANT (ESSEX) DATE id~i AEPSC PROGRAM LEAD ENGINEER DATE /~@~

CLOIHED¹ 7, I (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDI. LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action fs recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATE GORY

I CLOIHED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION jg, APPROVED 0 PARTIALLYAPPROVED Q NO ACTION I: OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YE POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM'( LOW FULL NO LOW NP'ODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED RESOLVED EXPLANATION OR JUSTIFICATION JLV SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE glL83~

CLO/HEDN 7, t 7

~- l.l ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM 0 Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered. '

ASSESSMENT CATEGORY

i CLOtHED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS.

PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED El NO ACTION ~

wOTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO (YVES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM . LOW FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXP LANA R JUSTIFICATION SIGNOFF H.F. CONSULTANT (ESSEX) DATE i AEPSC PROGRAM LEAD ENGINEER ~ DATE g~~

CLOIHEDII7, f

(,.a.x.s k(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) Hl G H MEDIU LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

(

8

CLOIHEDN 7 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE C3 FURTHER REVIEW BY CI FURTHER REVIEW BY CI fURTHER REVIEW, BY DISPOSITION 0 APPROVED PARTIALLYAPPROVED CI NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) H IG H MEDIUM OW CONSEQUENCE OF ERROR (COE) H IG H MEDIUM 0 NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOL EXPLANATION OR JUSTIFICATION Q t i c Ce 'u - 5 hM i cIu ala c~< 4 ax~

r'iv I'I I 1

+~A'AC(a 9 w CC I C,) c 015aQ I 'T aWuu'~~ ua a g4uwnsu$ a+aQn pg~tuag n4Qg cogoYaAibv i<5 a~ua SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LC~~

CLOIHEDff 7. t -g

~a$ ~tc)~ ~ 6 7, c2 ~ /g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I'- High priority; corrective action should be taken.

Category II - 'edium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

4 E

jf V jP ~

8 9

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY D FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED ~ PARTIALLYAPPROVED I ~

NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~v POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW.

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM'. LOW FULL NO LOW NO MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXPLANATIONiO JUSTIFICATION h'i4 i'IG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

~3

i Cl

CLOtHEDff 7. I -'i0 Cr 'if~rton P g. 7. ~. /. Q ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

~

~

g

CLOIHEDN l. l l EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING, DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~ES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES EXPLANA RESOLVE RESOLVED OR JUSTIFICATION ~m ~ >~ A.V SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~~6

CLOIHEDN 7, 0 i

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIU LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category Il- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

'I ~

4 0

CLOIHEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g.APPROVED 0 PARTIALLY APPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~ES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW II FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES R SOLVED RESOLVED EXPLANA N OR JUSTIFICATI N SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~EL U>

'EPSC PROGRAM LEAD ENGINEER DATE ~i~~

CLOiHEO>> 7, I ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIU LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I '-- High priority; corrective action should be taken.

Category ll- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

/4 CLOIHEO>>

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO s POTENTIAL F.OR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL ,

PFE AND COMPLIANCE OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED OR JUSTIFICATION I

RESOLV,ED'XPLANATION Km ~ <WVI~ 4 Q.

SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~hQ Q5 AEPSC PROGRAM LEAD ENGINEER DATE ~~M

S S

i

CLOIHEDII 7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIU LOW CONSEQUENCE OF ERROR (COE) H) G H MEDIUM LO Consequence Ol Error High Medium Low High Potential For Error Medium Low Category I- High, priority; corrective action should be taken.

Category II - Medium priority; corrective action Is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

=4 S

CLOWEDa f. t- l3.

EVALUATIONAND DISPOSITION RECORD ACTIONS 'SSESSMENT/REVIEW PENDING DATE CI FURTHER REVIEW BY 0 ~ FURTHER REVIEW BY Q FURTHER REVIEW BY DISPOSITION P. APPROVED 0 PARTIALLYAPPROVED D NO ACTION Ci OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW

~ 44 ~ ~

FULL LOW NP MODIFY RECOMMENDATION COMPL'IANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION <~ CWV I Lw 4 s?

SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~bQ( Q5 AEPSC PROG RAM LEAD ENGINEER DATE /MM~

CLOIHEDN 7 )

Ct ik~ic>rt+: Q. 7.g. Q ASSESSMENT RECORD POTENTIAL FOR ERROR {PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR {COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - ~ Medium priority; corrective action is highly recommended.

Category ill <<Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

't 1

o 8

S o

Ij

CLO/HEDN t t

~

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 4.OW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION ~ WA V I L44 '4 SIG NOFF H.F. CONSULTANT (ESSEX) DATE i Q( Q5 AEPSC PROGRAM LEAD ENGINEER DATE // Z~Q

Cl S

S Cl o-

CLOIHEDff 7.1 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIU LOW CONSEQUENCE OF ERROR (COE) HIGH ME D IVIVI LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action Is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY ZL e

4 S

o

CLOIHEDN t t

~

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW LOW NP MODIFY FULL RECOMMENDATION'R COMP LIANC E PFE AND LOW COE JUSTIFY AND DOCUMENT YES YES SOLVED RESOLVED EXPLANATION OR JUSTIFICATION ~ <A.V) ~L u SIG NOFF H.F. CONSULTANT (ESSEX) DATE A EPSC P ROG RAM LEAD ENGINEER DATE ~KZD

CLO/HEDII 7 I

. ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIU LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category ll- Medium priority; corrective action is highly recommended.

Category ill - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 S

0

CLOIHED¹ 7.i-i(,

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION JE. APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES, NO POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW MEDIUM "LOW

'IGH CONSEQUENCE OF ERROR (COE)

FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES'ESOLVED RESOLVED EXPLANATION OR JUSTIFICATION TM P -MS& Pco cuSS (c uIcc

~ 5

\

i'a P

Ic .a~

c ~ho w~ ~~( a~, his 4 (4 cohoc Z4k a SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAIVI LEAD ENGINEER DATE DATE

~~

~gZ6

CLOIHEDN 7, I 17 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H ED IU LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUIVI LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective ection should be taken.

Category II- Medium priority; corrective action is highly recommended'.

Category III - Low priority; corrective ection is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

t k rv C

0 8

CLOIH EON 7, )

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE I

C3 FURTHER REVIEW BY 0 FURTHER REVIEW BY CI FURTHER REVIEW BY DISPOSITION D APPROVED g PARTIALLY APPROVED 0 NO ACTION Ei OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR, ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM(

FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EXPLANATION QR JUSTIFICATION C

ESO

- c A i~ ask&

wa Co 44( 4 r >n iC v tA

-s SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~9

~ AEPSC PROGRAM LEAD ENGINEER DATE /~i~~

CLOIHEDN 7 ~

ASSESSMENT RECORD POTENTIAI FOR ERROR (PFE) HIG H EDIU LOW CONSEQUENCE OF ERROR (COE) HI G H ME D I UM LO Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

Cl lil

CLOWEO>> 7, (

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOVI COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATIO %0 I6'ii 0 'L'As P a ~ ~

a a SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE gJ/gg

i Q

CLOIHEDff 7 Mi%cc low 4-: Q.7. 3. l ~ (y)

ASSESSMENT RECORD POTFNTIAL FOR ERROR (PFE) H IG H M ED I U M LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

Cl CLO/HED¹ 7 is EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED I: NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YE POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW 1

CONSEQUENCE OF ERROR (COE) HIG H MEDIUM', LOW FULL LOW . NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATION ~ S UL 4 v C, Co SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

CLOIHEDN 7. f gQ Cr:4er'one >.7./.8 $ (i)

& 7. l 8 < gd ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR {COE) Hl G H MEDIUM LOW Consequence Of Error High Medium 'ow High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

k 1

CLOIHED¹ l o L EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

@ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES No . QYY)

POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM'; LOW FULL LOW NO MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOL RESOLVED EXPLANATION OR JUSTIFICATION + C%~S SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~05 AEPSC PROGRAM LEAD ENGINEER DATE MLS M

0 e

CLOIHEDff 7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) Hl G H MEDIUM W I

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 0 Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

J 4

CLOIHEDII Q f

~ -+(

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION APPROVED ': PARTIALLY APPROVED 6 NO ACTION ~ OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH- MEDIUM% LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXPLANATION OR JUSTIFICATION c4.

cR SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~~

CLO/HEDN 7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H ED IU LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Ol Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective ection is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOWEO>> 7,i- >

EVALUATIONAND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION j5, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 'OW NO LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 9-WSW Vc'~~a (a utw

~ 5 Q 4',4 ic'0 Q gw (.4& Hm CeC~<

y~~~Q~4gt( X~ VPg~ P~VW~in~~ gCXW ~ Q <TlhS ~

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~~~

CLOtHEDII 7 c ~'&e <~4 C.7.s.w c ASSESSMENT RECORD POTENTIAI FOR ERROR (PFE) H IG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH EDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEO>> 7.i- +Q EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION JE, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFEAND OR COE JUSTIFY AND DOCUMENT

'OW YES YES RESOLVED RESOLVED EXPLANATION OR JIJSTIFIOATION I hr 0 -MS& Vc~casa (n uIm

~ 5 SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~~

CLO/HEDff 7. )

Cr:ice"ioM g. 7. 3. 3 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action Is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII 7,(- cLLI.

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE Q FURTHER REVIEW BY D FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION jE, APPROVED C3 PARTIALLYAPPROVED D NO ACTION D OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ., LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES, RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M P-MS& Vcc ~a (c uIm

~ 5 c QvA~ cV~ ~

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~gg~

CLOIHEDII g. t ~5 Cc ice,rid@+ (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 'LOW Consequence OI Error High Medium Low High Potential For Error Medium Low

~0 ~

Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category Ill - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

~,

0 0

CLOJHEO¹ 7,i-~.

EVALUATIONAND D!SPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY D FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION JE, APPROVED 0 PARTIALLYAPPROVED D NO ACTION C3 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 'OW FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 0-MS& Vc'~CaSS (u utw

~ 5 a

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~~

0 CLO/HEDN (

c.~'4~o~+C .7.(. 5d Cs)

ASSESSMENT RECORD POTENTlAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HlGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOlHED>> 7.(- 4 4 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION JK APPROVED, 0 PARTIALLY APPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 'OW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 0 MS& Pc'~~a (n atm

~ 5 SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~~~

CLO/HEDN 7 I +7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H EDIU LOW CONSEQUENCE OF ERROR (COE) HI G H MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSIVIENT CATEGORY

'f 0

CLOIHEDN 7,i >7 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE C3 FURTHER REVIEW BY D FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED D NO ACTION I:I OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM, LOW FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 0 MS& Vc'u~a (~ utm

~ 5 VI SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~RE~

(

CLOIHEDff g

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) IG MEDIUM LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I ~~

High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESS IVI ENT CATEG 0 R Y

CLOIHEDN 7,i-+g.

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION JK. APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM '- LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M P MS& Vcc ~a (~ utm

~ 5 SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

g~~

CLOIHEDff'7.1-QQ (

4.1.3.5 0 r.i)

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 0 Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 e

CLOIHEDN 7. l EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY CI FURTHER REVIEW BY LJ FURTHER REVIEW BY DISPOSITION R APPROVED 2 PARTIALLY APPROVED <

NO ACTION 'THER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR

, LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATION%'n -~4sek~~k w e,5'EQ LS %Nb 4 O,i'a Qs a

<<VISa,r OC u 64%

SIG NOFF H.F. CONSULTANT (ESSEX) DATE Q

~~4

~4K AEPSC PROGRAM LEAD ENGINEER DATE

CLOfHEDII '7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 0 II Consequence Of Error High Medium Low Migh Potential For Error Medium Low Category I ~ . Migh priority; corrective action should be taken.

Category II Medium priority; corrective action ls highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOJHEDS 7,)-Q <

EVALUATIONAND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION jE, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) . HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 0-MS& VCc CASa (C utCC

~ 5

+W c~m u, s SIG NOFF H.F; CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~U&

CLOIHEDN 7 (

l- riper' 0- (o. 7 IP ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) H IG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH EDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

t C

CLO/HEDN 7, ( -Q ]

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION JE, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 'LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I M 0-WSW Vc~~a Cc uIm

~ 5

'f<<h~ %W X4 SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

'~~

Lll.~k

CLO/HEDff Q c < %e c i'- n ~,', g. I. Q. $

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY J

CLOIHED>> .i EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE CI FURTHER REVIEW BY CI FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

'PPROVED Q PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~ES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW (

FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLAN OR JUSTIFICATIO (z: bu- Fa< 4 J L Q~ i Lm 'LV Wi SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC P ROG RAM LEAD ENGINEER DATE DATE

~t)

~Q~

CLOI HE Off cia~~~ g.g g,y.a ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY J

CLO/HEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM CON(~t=.QUENCE OF ERROR (COE) HIGH MEDIU.M 0 NO LOW NP MODIFY RECOMMENDATION FULL PFE AND COMPLIANCE OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION c 0

( o%~m SIG NOFF H.F. CONSULTANT (ESSEX) DA'TE ~+

AEPSC PROGRAM LEAD ENGINEER DATE ~// Z4F

CLO/HEDN EXPLANATION OR JUSTIFICATION (~THUD)

~Q'I 34k w X~ ~ Q,9,0 q~M s<'w mc4

~~ ++Q. g<~ o<g ~x gc v g<~Q 3

sMK ~

mvi~ 4 +~ ~45 <~ ~

P W ~)A ~ v<<44ahi

~ ~9<.4 q, 44, swA cps.

cQ~ 4o.q~ ~ %, CA v4 s Yp g,

%(z~ gg c t,(~<

<X<<.v QQ

>+ c< 4h$ +5 ~~ Q~ Q~

1

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIU LOW CONSEQUENCE OF ERROR (COE) Hl 6 H MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium

  • Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action Is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN 6 o)

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION dI APPROVED 0 PARTIALLYAPPROVED C3 NO ACTION Ci OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO. ~YES PQTENTIAL FOR ERROR'(PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM, LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND'OW OR COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATI N ~4 ~ Cb SIG NOFF H.F. CONSULTANT (ESSEX) DATE i AEPSC P ROG RAM LEAD EN G I NEER DATE LED~

CLOIHEDN ASSESSMENT RECORD FOR ERROR (PFE) HIG H MEDIUM LOW

'OTENTIAL CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I ~~

High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective ection Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

0 O

CLO/HEDN (

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION B APPROVED k PARTIALLYAPPROVED I NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIG H MEDIUM; LO FULL LOW NP MODIFY RECOMMENDATION, COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLV EXPLANATION OR JUSTIFICATION I & c

+M %~I ib,pu I Cl ~g C O'Imf SIGNOFF p ~mme gap)

H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LQ~~

d CLO/HEDN EXPLANATION OR JUSTIFICATION (~<~D)

+, ica gw cc~ cia~ a+ ca~ ccshcd c gw ca a' c'A~( 6 cd'wz n

~~K ~KKEadgca I( a C i ba lcaca v c~ -~~M Waai, Cn~gca~~ a ~% 7 Wf P.> 'ccc, ld G C~ Zlcdh~

(p c.sL~cacc cia a d. ~ (p ci, 4R ice v cX 4tlgg)

~3~<<<c s~ ~~~ ~~ ~ ~W g0,~

1 Scc7cc Rgicc 'c-id0, c'< d ~ ~ cd~ cc ('+fc~

6'pglacd(iced KP4%s is v h cd~ i-'ivy a a, c, i"" cc, q (C ~ a .>. C. O,,

v..y,.@ ~. c.q4 p -.,~,.-.4 Q

ac cA( bd caclcaccK Sac faacca

%~~ O>~<~a ( >Qc

'A

~in pa g, gs <<+D 'cuba'c<'dh5,caw' ~ u,(( +

'.<<<<a~m~ 1

<s cygne g<i~4, C~ swAc~ a~ c-'c~'4S p,.Q a,<

WV'fy ~lc edit.

CwacCa owy~X

~a caa- ~& cxcw ccrc'd~ Qcac ('iMaaaa cda><<<'a>

b c'a ~s ca c cc .

Ccaw gcd

<Wc da~ ~~+/ac'ciug~

+~ 8Q.-9 Q, Sv,~~ ~c%u~ c~ 9 E4 c5. Salad 'c~~(paacacc cc 5

(

C Qaa C'a ~k V (pd ~)

CLO/HED¹ EXPLANATION OR JUSTIFICATION (OM'l~)

~pl~ gX~o Am tJvw v lt QS 5M~ c~QQ, ( ~(Mq q $f Wuc 'ogive%;+:.,

'cma ov 0 Ewe isi~ +~q Q+Q ~@(~ p 4<k ~~

x <

Q. ~g ~~(@ q

~u~M v h u~ ~v, QE.Q I

~~ ~~Qwta~ig<w Ui~ wig]

~~~l~<<<ia'o<~'i~ <hoD4+ ra Colf5zs(-o s cs. bp c~~gavzzQg cowlicks ala. o,g<g

~4.h-~ic3 %ra,~ m4,', .yg,,,g(,

~l 4. J,Q Q

ACE~+ Rh~gp~ Q ~~~y(

(

CQ >k-4g<~.

(,' os CcX

+g~. k ~. i MERI 'l I 0 g 4,

CLO/HEDff C <ice(i ~

+ ' 0 p.), c ~

I ) 2 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective ection should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category lll - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ 8 l 5 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FIJRTHER REVIEW BY 0 FURTHER REVIEW BY

. 0 FURTHER REVIEW BY DISPOSITION

~

~APPROVED D PARTIALLY APPROVED EI NO ACTION ~w OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H, MEDIUM LOW 4

LOW NP MODIFY RECOMMENDATION FULL NO PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION ~~

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~QQz

I CLO/HEDN L.S,(,4 c(~3 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) IG MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

4 4

~ ~ 'I t

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION k APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTKER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM.', 0 FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION hv SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LuMK

CLotHEO>> g,) g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

t, k

CLOtHED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY Q FURTHER REVIEW BY DISPOSITION' APPROVED Q PARTIALLYAPPROVED NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (C ')E) HIGH IVI EDIUM., OW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOL EXPLANATION OR JUSTIFICATION ~~ <a., <

Xh ivy '(ac hk~~~mz~Q v. Ce o - 4 '.

eu.

<<YG.S~ cR W C' W VCa . W.

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE llIZ~

CLOIHEDII ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIG H MED IUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II'- Medium priority; corrective action is highly recommended; Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

E CLOtHEDN Kak-EVALUATION AND DISPOSITION RECORD t

ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR USTIFICATION Cubo <

~A 'IC SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

CLOIHED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION Ej OTHER" EVALUATION FULL COMPLIAN WITH GUIDELINES NO YES POTENTIAL FOR ERRO FE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR ( E) HIG H MEDIUMLOW FULL LO NP MODIFY RECOMMENDATION COMPLIANCE PFE A OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION >4 ~4< <x U~Sow+

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LLC2EW

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) WHIG MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 CLO/HED¹ EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS

' DATE PENDING FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION d APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION EI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 0 FULL "NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLV EXPLANATION OR JUSTIFICATION SIGNOFF H.F. CONSULTANT (ESSEX) DATE > E AEPSC PROGRAM LEAD ENGINEER DATE LCL7~

CLOIHEDff

~.5,i.h ~$

ASSESSMENT RECORD, POTENTIAL FOR ERROR (PFE) Hl G H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH EDI U LOW Consequence Of Error High Medium Low High Potential For Error Medium

~ Low Category I- High priority; corrective action should be taken.

'I Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 CLO/HEDII +

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 8 APPROVED 0 PARTIALLYAPPROVED EI NO ACTION Cl OTHER EVALUATION FLJLL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM, 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 'OW FULL NO LOW NO MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVE EXPLANATION OR JUSTIFICATION C'W SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~MM

CLO/HEDN

( c >K'~ v~

~

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective ection is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY S;i

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE CI FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION p

APPROVED C3 PARTIALLY APPROVED E3 NO ACTION G.OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H M ED IVIVI, LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVE RESOLVED EXPLANATION OR JUSTIFICATION Y

o.

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~~M

CLO/HEDN (wl ( vW

, g.,~) ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H E0 IU LOW CONSEQUENCE OF ERROR (COE) ~HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 0

CLO/HEDII EVALUATIONAND DISPOSITION RECORD PENDING 0

0 0

FURTHER REVIEW BY FURTHER REVIEW BY FURTHER REVIEW BY

'ATE ASSESSMENT/REVIEW ACTIONS DISPOSITION 4 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL 'NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVE RESOLVED EXPLANATION OR JUSTIFICATION C a

< o.4 SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~4

~/~~

0 CLO/HEDff Cj Mike.riots&. C.l 3. I r5 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) IG M ED I U M LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective ection is highly recommended.

Category III <<Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

I I

E

~ ~

CLOIHEDII EVALUATION AND DISPOSITION RECORD ACTIONS 'SSESSMENT/REVIEW PENDING DATE Q FURTHER REVIEW BY 0 FURTHER REVIEW BY CI FURTHER REVIEW BY DISPOSITION 4 APPROVED 0 PARTIALLY APPROVED EI NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO @YE

)

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF EPROR (COE) HIGH MEDIUM LOW

~ ~ 4 5 FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVE RESOLVED EXPLANATION OR JUSTIFICATION 4 4a ~c.

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~~~

0 CLOIHEDff M'4.~ioc4- ( .S.l. l ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H M ED I0M LOW CONSEQUENCE OF ERROR (COE) IG MEDIUM LOW Consequence Of Error High Medium Low High w

Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category ill - Low priority; corrective action is recommended.

Category IV -- No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

R l

CLOIHE0 II EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY Q FURTHER REVIEW BY DISPOSITION HI APPROVED 0 PARTIALLYAPPROVED CI NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES s POTENTIAL FOR ERROR (PFE) HIG H MED IVIVI LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLV RESOLVED EXPLANAT ON OR JUSTIFICATION S

SIGNOFF Yw M< RQ.

QR 4 H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~226

CLO/HED¹ Cci&~t~4 Q.9. (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) H IG H M ED I U M LOW CONSEQUENCE OF ERROR (COE) HIGH EDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

1 ASSESSMENT CATEGORY

CLO/HEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY Q FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Kl APPROVED 0 PARTIALLY APPROVED 0 NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES'OTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIF Y AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATION m V 6 44 I 4~4 Iti A a SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~Ne AEPSC PROGRAM LEAD ENGINEER DATE ~~6

CLOIHEDN /

Crignon+'9 6 / 2 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HI 6 H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- - High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN Q f Q EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED PARTIALLYAPPROVED 0 NO ACTION OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES Qo YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM O FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLV EXPLANATION OR JUSTIFICATION SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE /~~

CLO/KEDN EXPLANATION OR JUSTIFICATION (~~) 'v

'ccsN Smckc+S av$ sssscq'~ QQupg wQAQ Qlnh Pump (cmtcuG 4 k QSSaC 1k'c5 c4lckacs C+OM4W% ~s~! dkc'sVl g Q4cc c h'heal% sAJ7.

5 y<lV cs $ g>> ~oc.%low ~C~ -s

'Ccs~v Qcus c c'cs&tcc' sue l+

N'C &U chv< 4~%A Ds~

QW+ +low ~glcafccc Pu~g @~If

~~hi Q ~ c, Wss c, 4kacw,z 4,4,'gu~mc, g p+R4~ iQ ~~~ -s 4'~-~

Q+Q (sQ$ g~g vgNs cOMNcq~+

cvAc kC>u~

Mice>vl ~ ll

~ 4%'ccc'Ah si~g C ~A-~~s IDucs'Ss.s

~ Mh-9)

W-%%,

g( p~Qqc(q~s cc GCScsC, )id' sos V1-!

Q~gg Qc -~g~ C'~a, qctegs+4U x~kb c Ikgcs C q qkvsc,'hq PqSa ~c.'4<-

(l gg~~+ Q uc-g Eccg(yQ+ QX4g assam ~ v,4 i4hAl QQ SCc.gg, 9 .s i g.

Ches'cc< CR C; ~'cw swa ccrc C~sSc.) u~ ~~

CLOIHEDII ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category Ill - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSIVIENT CATEGORY

c J

0

CLOIHEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 4 PARTIALLY APPROVED Q NO ACTION 0 OTHER EVALUATION fULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM. LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION L 1<~0< laV

~ 4~v a 'r~ail~i V~Si cava. <<~+~ <~~Sue.~ c~~~ms<<~ K < ss 4. ca4-4 c4>~ wg+~~

fi~co o c~l~ ~,+ ~ m oo coo o woke qFo<m u i ko ol-,

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LLZZE6

CLOIHEDff 9.z.p~ (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HI G H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II << Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY K

l

CLO/HEDII q i- (9 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED g PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES (go POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIG H MEDIUMS/I OW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLVED EXPLANATION OR JUSTIFICATION i +wc'~w x~ >ca.ra~

7 c OC C.~~4 c 'ZC.

<64. rQ 5Moo.A i'0Q 0 ~~( owg+~ chyle 0 @de$ pg.

SIGNOFF aX co~ ca Q~~ e,~g A oct mw cWov~ 0 i<<c 4 <<<$ 4 ~~q+, rM<<sociaki~v, 1<

H.F. CONSULTANT (ESSEX) DATE N%

AEPSC PROGRAM LEAD ENGINEER DATE LC!7~

CLOIHED¹ 0( (

'7 C~i&~(ic o4 6 C.8- 3 ~> b I . I . a c o')l'zASSESSM ENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH EDIU LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

0 0

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION EII APPROVED 0 PARTIALLYAPPROVED EI NO ACTION 0 OTHER EVALUATION I FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATION

~c s <a SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~<~I IP

CLOIHEO>>

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW >

Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category ill - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD a

ASSESSMENT/REVIEW ACTIONS PENDING DATE CI FURTHER REVIEW BY 0 FURTHER REVIEW BY C3 FURTHER REVIEW BY DISPOSITION E, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~ES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW

}$Yj.

41 ~.~ ~

LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION ro < p-O SIG NOFF H.F. CO,NSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~C~

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOVE CONSEQUENCE OF ERROR (COE) HlGH IHEDIUM ~LOVlf Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action Is highly recommended.

Category III - Low priority; corrective action ls recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSIVIENT CATEGORY

CLOWEO>> P (-'2 EVALUATIONAND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION El APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO +YES, POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL 'O LOW PFE AND NP MODIFY RECOMMENDATION OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES WSOLVED r'ESOLVED EXPLANATION OR JUSTIFICATION ~ .dC~'. eLo'ic e"'c<Li. Z~s<A"'iso

'J SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~J'/58~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LON?

CONSEQUENCE OF ERROR (COE) HIGH INEOIU5h LOVf~

Consequence Of Error High IJIedlum Low High Potential For Error Medium Low Category I << High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

- Category III >> Low priority; corrective action ls recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN g (- >

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY, 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION IXI APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES .

POTENTIAL FOR ERROR (PFE) ~ HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW (

FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED~'ESOLVED EXPLANATION OR JUSTIFICATION 5W<'o< I 1 SIGNOFF H.F. CONSULTANT (ESSEX) DATE )~4K AEPSC PROGRAM LEAD ENGINEER DATE /~~/ ~@

(

cLOIHEDN yI l.f.

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH 41EDIU LOW CONSEQUENCE OF ERROR (COE) ~fllGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

~,

CLO/HEDN V r g-EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

@ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES (~ES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION o~w sV W~ t( k$~ ~I (n.l<<

'l( &'l- lOD;3o I I.( fE-Iv)- t'AA C

~

~c4" uS i vl=.

Z ~~rr>>'e2 iI C~~~ ning a;><4 ~ bbreVi.~~i~<.S (

~~

/

<<a;r r

'/i )

4 ~c.W<~~

I r

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LLL~~~

CLO/HEDff Q I ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) .

~MGH, MEDiUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII g~ t EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION I APPROVED 0 PARTIALLYAPPROVED EVALUATION 0 NO ACTION 0 OTHER FULL COMPLIANCE WITH GUIDELINES NO (YPS POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

~ ESOLV RESOLVED EXPLANA ON OR JUSTIFICATION Q'r I l ckncug.

E ', .)

5(~~~ 5 Q K pL i ) T.-HX oi P

o lb +( ' vtck M~ ~

SIGNOFF H.F. CONSULTANT (ESSEX) DATE i~8X AEPSC P ROG RAM LEAD ENGINEER DATE LLb356

CLOIHEDN p(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM CO~-'IGH CONSEQUENCE OF ERROR (COE) MEDIUM LON Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Nledtum priority; corrective action Is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN gi -9 ~

EVALUATIONAND DISPOSITION RECORD ASSESSM ENTIREVIEW ACTIONS PENDING DATE ~

0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 8 APPROVED 0 PARTIALLYAPPROVED Q NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES ~

POTENTIAL FOR ERROR (PFE) H IG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

/

~RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION. deco"Je o T- fob~~- flu<<.CX]e~ /~ 5RI,Ee pre~ ~x-e e A<I,',-I wc' SIGNOFF

'I H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE lLLQZ@

CLO/HED¹ gi t i ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H M ED IU 'OW /~

CONSEQUENCE OF ERROR (COE) HI G H MEDIUM LOQ'onsequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASS ESSIVl ENT CAT EGO R Y

CLO/HED¹ V (-

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLY APPROVED E3 NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES g POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESO 0 RESOLVED EXPLANATION OR I JUSTIFICATION ID Mteee tcelt 3 ~

e> igQ-6 Ci+E.M, /u?a'C('V( /'L>~Zu-~

r eL.(

'}

0 late C t LJ LCt: a C SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE ~)~

DATE ~4

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) LOW CONSEQUENCE OF ERROR (COE) H IG H M ED I U M LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE E3 FURTHER REVIEW BY G FURTHER REVIEW BY FURTHER REVIEW BY DISPOSITION B, APPROVED C3 PARTIALLYAPPROVED Q NO ACTION D OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~ES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW

, FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EXPLANATION OR JUSTIFICATION Z Mx%c SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~~

AEPSC PROGRAM LEAD ENGINEER DATE D

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 0 FURTHER REVIEW BY DISPOSITION 6( APPROVED 0 PARTIALLY APPROVED D NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW

~ ~

FULL NO LOW NP MODIFY RECOMMENDATION COMP LIANC E PFE AND OR LOW COE 'USTIFY AND DOCUMENT YES YES

~RESOLVED EXPLANATION OR JUSTIFICATION

~'<< t~ a. 4.

~

RESOLVED cc,Q U7- 2Q

<<'- 4<~ - ~C~ . (.,AA SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE Ii/MK

CLO/HED¹ g' ) 0 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIU LOW

~ CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low l

L

<4R~~KN K

Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective

'0 action is recommended.

Category IV- No corrective action necessary, but should be considered.

~ ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED {El NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM 'OW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW >

FULL NO LOW p I, ODIFY RECOMMENDATION COMPLIANCE PFE AND LOW COE JUSTIFY AND DOCUMEN YES YES RESOLVED RESOLVED E .PLANATION OR JUSTIFICATION

/ Oi A- 404 Ao v

043 A

~

pl~

I ~n I+

i&~-j 8

Z4 0<X~

Ccats ..

L=~t.SQ 5c

~

~ '-~ ~~

vi.~ '

~c.L

~ [~aY re),

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE /~K'

CLOIHEDN p~ t f ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW ~

CONSEQUENCE OF ERROR (COE) HIGH INEDIUM~ LOW Consequence Of Error High Medium Low High

,Potential For Error Medium Low Category l- High priority; corrective action should be taken.

Category il - Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEON V f I I EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION IZ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D RESOLVED EXPLANATION OR JUSTIFICATION >' l ~r'Pn- "e -(4'-- (~'K c's~""

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~K

CLO/HEO¹ g [ - l~

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) MEDIUM LOW

'IGH Consequence Of Error High Medium 'ow High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category 'I V- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY Qo 4.. Dcw~4? cc.s V r -I 2-

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY Q FURTHER REVIEW BY P

Q FURTHER REVIEW BY DISPOSITION P APPROVED Q PARTIALLYAPPROVED 0 NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLV EXPLANATION OR JUSTIFICATION ~~ i v SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~<

AEPSC PROGRAM LEAD ENGINEER DATE @LE

CLOIHEDN g ]i

( 5 ASSESSMENT RECORD POTENTIAl FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH INEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category l High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category ill - Low priority; corrective action is recommended.

Category IV << No corrective action necessary, but should be considered.

ASSESSMENT GATEGORY

CLO/HEON P' ("3 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION H APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION u.'ll( l~5or8 ceo'fa b. (i4 . Ld 4(4 c,)ct( b4 r4vta~8 oa ~D-x.'j (8 6a(

I. ~ I~(-ra r SIGNOFF H.F. CONSULTANT (ESSEX) DATE hQ AEPSC PROGRAM LEAD ENGINEER DATE /~K

CLOIHKDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ClOW~

CONSEQUENCE OF ERROR {COE) HIGH MEDIU LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action ls highly recommended.

Category ill - Low priority; corrective action ls recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 CLOIHEDe EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION lE APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO (YES

'OW POTENTIAL FOR ERROR (PFE) HIGH MEDIUM CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW

..-0, Wbbl ~ ~ ~ IC FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED+

EXPLANATION OR JUSTIFICATION '

I mi'f'i~a,A'id.>.i Ig oK. i'u4irrkc'o:eq of ri 'r RESOLVED I

e~ uEC J~tC T"~evict do~voe~~

ne ran. r ia.rr fiyr ~ le;e/s .gi'il bc cliecKec3 (ace.ll 5CT7P. a ~c i"(a.h(e. G =ri(c<<, rto(.~~6'~z 4<

~,'l(

pe.v'(l0v'em'e. I c:oi"r"ec.,I st< ~- q ~t'f T aevi i>1 D, (tI Co~e~ <';...

~

S!GNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

~~~ E

CLOIHEDN P t l 5 .

EVALUATION AND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION mt OTHER EVALUATION I

FULL COMPLIANCE WITH GUIDELINES NO YES~

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMP LIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

};

RESOLVED'ESOLVED EXPLANATION OR JUSTIFICATION 6(n7 v- Bit/l. LLO rS o~r~ecl: T~

Ct.. C e; CLONIC. (MX(A ~ ~ tLS C'A'ECC>( ~OULT..

SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~4~

AEPSC PROGRAM LEAD ENGINEER DATE ~i

CLO/HEDff ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) EDIUM ) LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM'OW Consequence Of Error High Medium Low High "

Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category Ill - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY ~l

~,

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE C3 FURTHER REVIEW BY 0, FURTHER REVIEW BY C3 FURTHER REVIEW BY D IS POS IT I0N

+ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVE RESOLVED EXPLANATION OR JUSTIFICATION R C N SIG NOFF H.F. CONSULTANT (ESSEX) DATE i AEPSC P ROG RAM LEAD ENGINEER DATE LLMF~

CLO/HEDN Q t - t t ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM (LOW CONSEQUENCE OF ERROR (COE) MEDIUM PLOW)

'IGH Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSIVIENT CATEGORY

CLOIHEO¹ V' I, EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED tRf NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM ~

+~LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM ~cow NO LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED D

RESOLVED'XPLANATION OR JUSTIFICATION 6 L'r C,d~+g ~~ i d.(c~S,XQ SIG NOFF H.F. CONSULTANT (ESSEX) OATE j~<l~ ~

AEPSC PROGRAM LEAD ENGINEER DATE LlLXZ6

CLONEDN g I ASSESSMENT RECORD, POTENTIAL FOR ERROR (PFE) HIGH <INEDIUM .

LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW"'onsequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

GLo/HEDGE 94-5 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 5 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLV RESOLVED EXPLANATION OR JUSTIFICATION SIGNOFF H.F. CONSULTANT (ESSEX) DATE XQQQ~

AEPSC PROGRAM LEAD ENGINEER DATE LLQ~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH CMEDIUM i LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM C LOW)

Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION S APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO (YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULl LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED "

RESOLVED EXPLANA OR JUSTIFICATION Cdc ~~dc i (~ C>- tZOB ~"~~

~A ) U4 fl'io (i (NQA'Y + w ~c'.d.~wi t CI.C SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~nl >I AEPSC PROGRAM. LEAD ENGINEER DATE i im&

i

CLOIHEDN V (- 'Z-V .

EVALUATION AND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION K OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES, NO

(

'POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW (

FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED M~ ~

EXPLANATION QR JUSTIFICATION I~a w a t t ~L (i~~.

ST. ~(c c (C PuqzX s~co-SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

CLO/HED¹ g( ~ Ir ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~LO~

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low

~iM Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE Cl FURTHER REVIEW BY C3 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED g NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ONQ YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR USTIFICATION 5 Q SIG NOFF H.F. CONSULTANT (ESSEX) DATE 0 AEPSC PROGRAM LEAD ENGINEER DATE

CLOIHEON Q ( L '~

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOtHEDN y'-

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION R APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM "

LOW'IGH CONSEQUENCE OF ERROR (COE) MEDIUM LOW (

FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED RESOLVED EXPLANATION OR JUSTIFICATION 7ro 4r e 6efn

~ ~

r cure~'-/ ) o I > Tr n~c. ~

e ~ b's ei~

+oi 0 c4o 6/-

SIG NOFF H.F. CONSULTANT (ESSEX) oATe Q4>~6 AEPSC PROGRAM LEAD ENGINEER DATE M~~

CLOIHEON Z..

y[ >

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW~'IGH CONSEQUENCE OF ERROR (COE) MEDIUM ~LolIY Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION J% APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW

(

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW (

FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION c &ri o s r eve hos nv o r8 e~ Ji~ L/SC. r cia v So o cd'IG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~il

CLO/HEDN jr ( w C ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO~W.

~f CONSEQUENCE OF ERROR (COE) HIGH MEDIUM. L~O Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highiy recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

CLO/HED¹ Q ( -Q Q .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED CI NO ACTION Q OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

'P 4

E OLV RESOLVED EXPLANATION OR JUSTIFICATION e h SIG NOFF H.F. CONSULTANT (ESSEX) DATE i4 AEPSC PROGRAM LEAD ENGINEER DATE

CLOIHED¹ Q (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) 'HIGH'EDIUM LOW CONSEQUENCE OF ERROR (COE) ~~HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ Q (- +g .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING ' DATE FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES r POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D "" RESOLVED EXPLANATION OR JUSTIFICATION u,@nXu~ - u -n >

SLY gA, 'lc lo~ 5( vdi.a (<uteM ~ccAe SIG NOFF H.F. CONSULTANT (ESSEX) DATE 'I)

AEPSC PROGRAM LEAD ENGINEER PATF ~cP~

GLOIHED¹ I! [

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) H~IGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low w

0, Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ (,> I 2 4 ~

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION 6.~mG~-

S(i Po~ = Js ~

SIG NOFF H.F. CONSULTANT (ESSEX) OAZE ~in AEPSC PROGRAM LEAD ENGINEER DATE /// ~k

CLOlHEDN g I'SSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH INEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM L Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED< Vl Z- t EVALUATION AND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION tH APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES~

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION cZ~ i"~Ca ~i~i e ~ <-28ee 3 A

'4 lk t'I K~V ~ l'N~.~LJr P g I L5'd0. SCCLkC. Cu t,('-

Lvio

< p

. Sc i iS KcuV 8- CSc.V ( "~v SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~

AEPSC PROGRAM LEAD ENGINEER DATE i i~ir&

CLOIHEOtf g ( Zy ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH INEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW~'onsequence Of Error High Medium, Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV - No corrective action necessary, but should be considered.

4<SESEMENT CATEGORY

CLOIHEDN 9 [

Z g.

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW

'IGH CONSEQUENCE OF ERROR (COE) MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION '2c.c~ el~;S a.~n( a.-n5c5 on.o 0. FR V C

P ( 0N 0 LA% GL) IL bL UYl C5 8 ( (C.4(fg ~S IS Q4 Jul ~M-SIGNOFF H.F. CONSULTANT (ESSEX) DATE I~XV AEPSC PROGRAM LEAD ENGINEER DATE ~1~8&

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW'IGH CONSEQUENCE OF ERROR (COE) MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- ,No corrective action necessary, but should be considered.

s~

ASSESSMENT CATEGORY

CLOIHEDII U (Z EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED JE NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED SOLV~D>

EXPLANATION OR JUSTIFICATION A~ ~~~

c, 8., i ~ c (0 ~ -M S ~c. A'c.cd~h

~

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P'ROGRAM LEAD ENGINEER DATE ~~~

CLofHEO>>

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~~LQ CONSEQUENCE OF ERROR (COE) HIGH lNEOIUM LOW >

Consequence Of Error High Medium Low Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category ll - Medium priority; corrective action Is highly recommended.

Category ill - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS P ENDING DATE Q FURTHER REVIEW BY 0 FURTHER REVIEW BY, Q FURTHER REVIEW BY DISPOSITION CI APPROVED Q PARTIALLYAPPROVED @ NO ACTION 5 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIGH MEDIUM t

0 FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY ANDNOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION SIG NOFF H.F. CONSULTANT (ESSEX) DATE Mh~

AEPSC PROGRAM LEAD ENGINEER DATE ~~~

CLO/HEDII V(- 8 (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM OW ~

Consequence Of Error High Medium Low High Potential For Error Medium Low

~

4bbab\ 0

~ ~ ~ ~ ~

Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV -

1 No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY V

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY El FURTHER REVIEW BY DISPOSITION

%APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION (~~e 'It~ -i-

~

x o~

\

a ( Uuk ( K~Di 4('plr +' ) I. AX'KDGMv.(+5 )ArT IJL cl>A tf clA$ lD I

QI2...

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE ~PK4

CLO/HED¹ ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should, be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED N OR JUSTIFICATION (-nc.c ' .L~ L~~ <:"Xi.~

EXgLANA WtL (~.W .

~l54<

~

e SIG NOFF H.F. CONSULTANT (ESSEX) DATE 0 AEPSC PROGRAM LEAD ENGINEER DATE 2QHK

CLO/HEON Q[ g3 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ( LOOP CONSEQUENCE OF ERROR (COE) HIGH EDIU LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 5 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES. ~

POTENTIAL FOR ERROR (PFE) H IG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED 1 g

EXPLANATION OR JUSTIFICATION Ulrt. i%+

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE ~4 DATE ~

CLOJHEOII V (- m ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM L W CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM LOW Of Error 'onsequence High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY t

I CLO/HEDN EVALVATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE C3 FURTHER REVIEW BY Q FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 6 APPROVED 0 PARTIALI Y APPROVED 0 NO ACTION '3 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM CONSEQUENCE OF ERROR (COE) HIG H MEDIUM OW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESO EXPLANATION OR JUSTIFICATION Y ~ V (MS %WAN ~ A!i 4 h~c c <w SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~

CLO/HED¹ i/t ~ g~g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~LOW!

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW.)

Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN Q I Q5 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEN ACTIONS PENDING DATE C3 FURTHER REVIEW BY C3 FURTHER REVIEW BY C3 FURTHER REVIEW BY DISPOSITION jE APPROVED C3 PARTIALLYAPPROVED C3 NO ACTION C3 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW (

FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLVED EXPLANATION OR JUSTIFICATION End c for

d. o~

~ I 4 J

~ I

+/ C I n,c'an 8J Ql Y wSons a Mome Co Y Cio&

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC P ROG RAM LEAD ENGINEER DATE DATE ~(~

CLO/HEO ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) . HIGH MEDIUM ~LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ V( ~

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED E NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW

'ONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION Ao . O-II& 7o o u~ e "og 5C~ MiO~ . L00 J e m eoW~Q C"eau ( r owe.~g-g

,o re~ .~ ".0 (~w.,k d.c'r 6..

(ou.

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER, DATE ~

DATE i~~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM OW.- i CONSEQUENCE OF ERROR (COE) HI6 H MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ r

'VALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED A NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO~W sal ~ Sk ~ ~ 4 LOW NP MODIFY RECOMMENDATION FULL NO COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION C ~

cvx SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P BOG RAM LEAD ENGINEER DATE ~I&K

CLO/HEDN gt ASSESSMENT RECORD U

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM L CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ g~ t -'Q$ .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION C APPROVED 0 PARTIALLYAPPROVED jE NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LO~W CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW~

LOW NO MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUST FICATION oir ~eoecX -4o SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LLL9Ek

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM L W>>'IGH CONSEQUENCE OF ERROR {COE) MEDIUM ~LO~W Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN Q I EVALUATION AND DISPOSITION, RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE

'0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES~

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED e

EXPLANATION OR SUSTIFIOATION MI L.><'~<<

ll 2K,C-~~~ +C> P- X.( w "~~

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE ~~

DATE ~~1~

0

CLOIHEDN g I Qg ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ Qt 4 C'VALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

~ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO U~zs POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

' RESOLVED ESOLVE EXPL(NATION OR JUSTIFICATION G<(i~i'a~ k<<m,lj ba ~no~~J C~<<<<'t5

'7 CZ.u3 c Vl I T 4/

-I Wl C ~

l plcf&cCL~

I l4lCLrt le i uI~bs'W 'P 2Z I .m~1 n BC','T C.a i >PM .LW . f-ZCEC e> b jl /

C- ~r. 4 cl ~'~i QI Il De" C.o~ o(lf:~P 8

P feist& Ot CK(M LN SIG NOFF 'I H.F. CONSULTANT (ESSEX) OATE ~O AEPSC PROGRAIVI LEAD ENGINEER DATE /Mg9~

CLO/HEDII p'J. Q ASSESSMENT RECORD POTENTIAL FOR fRROR (PFE) HIGH MEDIUIVI LOW

~

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM OW Consequence OI Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSIVIENT CATEGORY

CLOIHED¹ g~ I Q EVALUATION AND DISPOSITION RECORD I

ASSESSMENT/REVIEW ACTIONS

' DATE PENDING FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Z} APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES i POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION OR JUSTIFICATION ~

v'~~ fb I'Ci i ~ n gccEc, /t1crccc f ( ~r 77/~ f'~

SIG NOFF H.F. CONSULTANT (ESSEX) oAze ~I34 AEPSC P ROG RAM LEAD ENGINEER DATE lLZ98~

CLOIHEDII ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) H1G H EOIUAM LOW CONSEQUENCE OF ERROR (COE) HIGH M DIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

@ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO CYY~)

POTENTIAL FOR ERROR (PFE) Hl G H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED RESOLVED EXPLANATION OR JUSTIFICATION ~~~SIP%Khics'

( v-SIG NOFF

. H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE ~/ gal@

CLO/HEDff (/(- tf Q ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH M EDIUM OW'IG CONSEQUENCE OF ERROR (COE) H MEDIUM LOW'onsequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY E3 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~ve~s POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES ESOLV RESOLVED EXPLANATION OR JUSTIFICATION Ld I( U'X. PPH'o w.c~U~

SIG NOFF H.F. CONSULTANT (ESSEX) DATE~~D AEPSC PROGRAM LEAD ENGINEER DATE ~~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H M ED IUM LO%

CONSEQU.ENCE OF ERROR (COE) Hl G H MEDIUM LO Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY JV

CLOIHED¹ V ( 0 f EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING ~ DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 4 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION

,COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D-EXPLANATION OR JUSTIFICATION 8<9.C-&- ~ l ~a RESOLVED

((

7c

~C< Scn le. c SIG NOFF H.F. CONSULTANT (ESSEX) DATE i~5 AEPSC PROGRAM LEAD ENGINEER DATE

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW

'IG CONSEQUENCE OF ERROR (COE) H MEDIUM LO Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ t

' C.( >

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY CI FURTHER REVIEW BY C3 FURTHER REVIEW BY DISPOSITION gR APPROVED C3 PARTIALLYAPPROVED C3 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO

+YE~S'IGH POTENTIAL FOR ERROR (PFE) MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW b&L t ~ ~ ~ \"A FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLA I N OR JUSTIFICATION (K ~>c ce SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER ~(~

DATE ~U DATE

C LOIHEDff ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ IJ (- Q(p EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 'FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLY APPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YE~S POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE. OF ERROR (COE) HIG H 'EDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANA ON OR JUSTIFICATION 7Iecuv ~u, ~~~<X o am<--~

SIG NOFF H.F. CONSULTANT (ESSEX) DATE (~i+)

AEPSC PROGRAM LEAD ENGINEER DATE // M~A

4 CLOIHEDII g t LL 7 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM~ LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUIYIl LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ P t g EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

ÃI APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXPLANATION OR JUSTIFICATION iLIo~ facow6ngg~~ .h~i cwqfaSiJ Mi8- T-~ . 8 ZOe- 250C9 W. t'ai(,( f7, ~vi 5'~li~g II c vvLecu.A LMA.e. ~~ I e ~A. 700 6-

/

SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~KB AEPSC PROGRAM LEAD ENGINEER DATE ~Rgb)

CLOIHED¹ ij EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLY APPROVED 0 NO ACTION g OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YESi POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH -

MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EXPLANATION OR JUSTIFICATION

/

glue m v a eA. cS Z. 4 RESOLVED o ~

c~i 4< ~.

r'z (u C'.LG re~i u z~oe, itc.

we(ds ou SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~/~Q

CLOIHEDN g I Lj g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM - LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM ~L~O Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, should be considered.

'ut ASSESSMENT l7 CATEGORY

4 I CLO/HED¹ 4" (-IJ g.

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Pj APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW PFE AND

'P MODIFY RECOMMENDATION OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION LJi it CoW ec~ <<,e. eLa. ~. rocu

'=~a Sl G NOFF H.F. CONSULTANT (ESSEX) CATE ~4&l AEPSC PROGRAM LEAD ENGINEER DATE ~~~

CLO/HED¹ ASSESSMENT RECORD

~

POTENTIAL FOR ERROR (PFE)

CONSEQUENCE OF ERROR (COE)

HIGH HIGH MEDIUM MEDIUM

~l C~OW OW'onsequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

/

ASSESSMENT CATEGORY

CLOIHEDN t,'(,5 >.

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

+ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES EYES~

POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM 'OW

~ ~ 0 ~ 184 I LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE,D RESOLVED ~i'm/

EXPLANATION OR JUSTIFICATION Vl.'Jr- 8~> d- f'LcA <<4. WZ 4Ah~ uJ<ir P~

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~(~ g

CLOIHED¹ g( 5(

ASSESSMENT RECORD 1

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM &0%

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective I action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY CI FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION t2 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES Y~ES .

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED'ESOLVED EXPLANATION OR JUSTIFICATION ~~he-t nacho~ re+.'I e c~4~ -'R.

SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER

CLO/HEDff V( - 5'L ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ~LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ t f 5K EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY Cl FURTHER REVIEW BY DISPOSITION

@ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION C3 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D RESOLVED EXPLANATION OR JUSTIFICATION Caa.l C' CE~C r cZC.c.ci~u C.L.O g I - -Q SIG NOFF H.F. CONSULTANT (ESSEX) oal e ~~~

AEPSC PROGRAM LEAD ENGINEER DATE ~/M6.

0

CLONED>> g r- 5'g ASSESSMENT RECORD

. POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW )

CONSEQUENCE OF ERROR (COE) H IG H MEDIUM LOW Consequence Of Error High Medium Low High potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION gj APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM i OW ~

CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 'OW.i LOW NP MODIFY RECOMMENDATION FULL OR" COMPLIANCE PFE AND LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EXPLANATION OR JUSTlf ICATION

>wC,c.

RESOLVED nwwn~ .~ 9 ~ a~( fir)

SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~4@ t~

AEPSC PROGRAM LEAD ENGINEER DATE LLl9S~

CLOIHEDif yi 5 Q ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LNW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN VI 5 "t EVALVATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE C3 FURTHER REVIEW BY 0, FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION G. APPROVED 0 PARTIALLYAPPROVED Q NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES Qwo YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM L6W CONSEQUENCE OF ERROR (COE) HIGH MEDIUM OW i FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES

/

RESOLVED RESOLVE EXPLANATION OR JUSTIFICATION ~0 ~%me . Pic~ -tuiulu ~s.=i fo(e uu~ ..r > ) >~) l g

/\

A<~i i~8 '.c. I 8'-DDT<' 5 >~ c

'I /

I ~ C ~

I ccrc (ideas SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~lQ)~

AEPSC PROGRAM LEAD ENGINEER DATE ~/I~k

CLOIHED¹ g (-5g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) Hl G H MEDIU i LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV No corrective action necessary, but should be considered.

0 ASSESSMENT CATEGORY

CLOIHEDN P'(-6 5 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

!5 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLAN OR JUSTIFICATION M'iPco c~.6c'Gt(cut CJ 4am I SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~73~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE} HIGH MEDIUM LON CONSEQUENCE OF ERROR (GOE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low

, Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action ls highly recommended.

Category III - L'ow priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

Q ASSESSMENT CATEGORY

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY CI FURTHER REVIEW BY DISPOSITION N APPROVED CI PARTIALLYAPPROVED CI NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW

'ES FULL NO LOW NP MODIFY RECOMMENDATION "COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES I

RE OLVE RESOLVED

~~~

EXPLANAT/ON OR JUSTIFICATION c( r-.e - upw M De /

g.

/i r

~it'/ ie4' l /

PiD (sitz's.~ ~

C~ '2 4: C SIG NOFF H.F. CONSULTANT (ESSEX) DATE I~)ch 7 AEPSC PROGRAM LEAD ENGINEER DATE LLlRE6

CLO/HED¹ gi ( 5

'SSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM~ LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIU LOW Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO(HED¹ I, E- 5 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YE )

POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPr.ANATION OR JUSTIFICATION <b.lu-

"0~6,i. e. .6(o e" SIGNOFF H.F. CONSULTANT (ESSEX) DATE 0 AEPSC PROGRAM LEAD ENGINEER DATE ~M&.

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN V( 52 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES WEGQJ.YED RESOLVED EXPLANATION OR JUSTIFICATION k3 II 0c X . l1I ( <rc lw4e(~X 6 ~PJ((

4o&Dvvl OP c~X K~ ow i 6 c..

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE lLCM6

CLOIHEDII gl (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM L W CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ V EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH -

MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM . LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED l

EXPLANATION OR JUSTIFICATION I

gz 1 C'.PIC 'I /AC.

'IG NOFF H.F. CONSULTANT (ESSEX) DATE ~~

AEPSC PROGRAM LEAD ENGINEER DATE ~j~

0 CLO/HEDII ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium.

Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII 9 i gQ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY' FURTHER REVIEW BY DISPOSITION 0 APPROVED 8 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) H IG H MEDIUM CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 0 0

FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED OLVE EXPLANATION OR JUSTIFICATION iQ 44k.4No~ a SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE LL/M~

CLOIHED¹ g(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM OW CONSEQUENCE OF ERROR (COE) H IG H M ED I U M LO Cons'equence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDII Q~ (

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO (vVs)

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MfDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES 1

RESOLVED RESOLVED EXPLANATION PR JUSTIF[CATION ~ &O n Iuu.. ~,~Vi~ (a wiKiW ~~MiQ -JLL ~ a.&~~Le av L 8 .4 v~co i~d-~~2 8 SIGNOFF H.F. CONSULTANT (ESSEX) DATE l~IO 4 AEPSC PROGRAM LEAD ENGINEER DATE ~IgjK~

CLO/HED¹ Vt ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM COW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

5 Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN Q( ( ~.

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 . FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED CI NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION w /

(t<<L<P 5 k~f b~ r Cz v(~ec(~

~MP I'A 'TC~<AO SIGNOFF H.F. CONSULTANT (ESSEX) ~4 AEPSC PROGRAM LEAD ENGINEER DATE DATE ~c~

CLOIHED¹ V'f -(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~L~O CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low, Category I High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ q ( 4 5 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION P APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO~ YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEOIUIoOI ~LOWO FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ExPLANQTIQN QR JUsTIFIGATloN

~e.tie'P5 D ~I (~k' RESOLVED

><<r o l M(s 4o SIGNOFF V H.F. CONSULTANT (ESSEX) DATE i AEPSC PROGRAM LEAD ENGINEER DATE ~/

CLO/HED¹ p(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOS CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT . CATEGORY

CLOIHED¹ I,i L-6 F .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED Q NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES 'NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~LOW~

CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION r lZZO 0 YBAA4'(g.~

i~

c d (1 L'et uP1tf'(U¹r INM<(rt f'e 8prr 4 Tf ~tit5 er .t¹"d tn (ul SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE ~/ PEW

CLOIHED¹ Q( Qc ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM >

LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ~LOW Of Error 'onsequence High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is'recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ Q ( Q$

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Pj APPROVED 0 PARTIALLY APPROVED Cl NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YESj POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM LOW C

FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RES ED RESOLVED LANATION OR JUSTIFICATION ~ ~ +~ ~ 4~~.l'X centi~~~."c(>

Plj '

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE

~~

~S~g,

CLOIHEO>>

ASSESSMENT RECORD POTENTIAL'OR ERROR (PFE) H IG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIG H MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I High priority; corrective action should be taken.

Category II Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ g (

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY CI FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO Cves

'IG POTENTIAL FOR ERROR (PFE) H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED. RESOLVED EXPLANATION OR JUSTIFICATION vs e oorreo.Pe (> o SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~~

AEPSC PROGRAM LEAD ENGINEER DATE ~/M&

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ 4' ('p EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS I

PENDING DATE D FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO, YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM,LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES I

RESOLVED RESOLVED EXpLANATION OR JUSTIFICATION e ( I i~be( cap'll be eorrec 'oI o 4~

&aA4L Si,z c>. e-'ttu< t v SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE ~~

DATER<~

CLO/HE 0¹ ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) H!GH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Low ilier mMI l t)~~4 Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION X APPROVED D PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES (YVES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D RESOLVED EXPLANATION OR JUSTIFICATION cZ Qa c tun G r s'Mi SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~R AEPSC PROGRAM LEAD ENGINEER DATE ~PEG

CLOIKEDII Q g- f EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

+ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW l ~ ~ ~

I.,

W I1 FULL NO LOW NO MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESO~LVE RESOLVED EXPLANATION OR JUSTIFICATION <PSC Le. n'hafelcclah'I(>< emcucaS(~

& <ZX. Hh(iWIc .%~i Cue tide rE (a DEl i~ Ot. C'Ou. nOi e+

e e i~( (~b'3 I

-r<

r> 'Wl ~ Ie LLIAe. C~rrec C'le(~e~l

( H P CltL.

lg I C ~

~l 5?

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE MIME

CLO/HEDN Q L (

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW I

CONSEQUENCE OF ERROR (COE) HIGH MEDIU LOW Consequence Of Error High Medium, Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY X

CLO/HEDN V Z.L EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 'URTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION jE1 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXPLANATION OR JUSTIFICATION be l I bc c' I. f eo.s 'rv1( o4 8( is r 4 ~, dr cc ev<T o ~eke SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~bb ~b AEPSC P BOG RAN LEAD EN G INEER e

DATE ~RKz

CLOIHEDff ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low g,,

Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary,

. but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION g. OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIGH . MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION S~

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER oAva DATE ~~

~t~ ~Y~

CLOIHEON V7-ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM O~W CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO Consequence Of Error High Medium Low High Potential For Error Medium Low

'I Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN ~7 EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 5 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW.

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT-YES YES RESOLVED EXPLANATION OR JUSTIFICATION

/i RESOLVE

e. 'B '~~4r~~e J: tee% f
  • elf e~

kta cc f

c3'(01 t (8 vavlpg~~

/

8, l

4u <c.g<~g Coi4cot c.La v v<<L<

r os.c4'i~ c.4-u~mal o ~(

\ "'~ g e i tn fV e Ia e3 Pup c~ ~u; o<e .

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~rM~

CLOIHEON ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEOIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIU LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

. ASSESSMENT CATEGORY

CLOIHEDN 'J 7 5, EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 38 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM "

LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION I I (d4 I vlT'ALL& l h 2 ~

ot' a.(ccal<LL< L.'opLkaiv> deut re. =~ LJgc. c'-oLi( cc l ~- Pa.>Le. It m(l.l L- 4 ~P 4 6d e.W.LLa. me y Le 5 r -r~

SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE MME&

CLOIHEDII /g ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH M~EDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH ME~DIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low 4~ ~ ~

i8 IAb '4 %41 Category I High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION gl APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION ~

FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) MEDIUM LOW

'IGH CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR

<<<gran LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED

'E EXPLANATION OR JI!STIFICATION chic(~

I 05I+l~i lb~CLK 1

be< nr Ca ee SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~WK6 AEPSC PROGRAM LEAD ENGINEER DATE ~M/

CLOIHEDN (j 2 t EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION PK OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION gR JUSTIFICATION D>~ l <<A ('r-< I/ I 8 see v -'a (4i ce~atu4oin SIGNOFF H.F. CONSULTANT (ESSEX) DATE ~)0 5 AEPSC PROGRAM LEAD ENGINEER DATE ~~~

CLOIHEDN lj'Q EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION fK OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL -FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW IVIED FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED

~ '

EXPLANATION OR JUSTIFICATION

\

o4 K i ~ On (nwXo~

I A t I u 8 t 3 T'AI I ug uWC t tat Vu u<rEt tIC>i SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~~&

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH EDIUM I OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low

~ t ~ Ll ht ttN ~ C Ca'legory I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII gi Z.

EVALUATIONAND DISPOSITION RECORD ASSESSMENTIREVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY D FURTHER REVIEW BY DISPOSITION 4R APPROVED 0 PARTIALLYAPPROVED D NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES>'

POTENTIAL FOR ERROR (PFE) IG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESO VED RESOLVED EXPLANATION OR JUSTIFICATION SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~~a

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM SCOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM L~O Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action ls recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN Qg-i 0 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION A APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~

NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLVED RESOLVED EX LANATION OR JUSTIFICATION I oc.e o lac~ eu oil~ erg a~) . ~j SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~E AEPSC PROGRAM LEAD ENGINEER DATE ~ILES

CLOIHEDN ~~

(

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM L~OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED>> U c- iI EVA1UATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION QL APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH 'GUIDELINES ~Y~ES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION > 'u.~L< ul'1 <4-5 G. c~c d.lA~oH.

vl C'0 wL eu. G c SIGNOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE k~

LCL9~

CLO/HEDII ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM > LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD

'SSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

+ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YS POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES ESOLV RESOLVED EXPLANATION OR JUSTIFICATION king V 4 Ska < iI 1c gw o SIGNOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE g/~M

CLO/HEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low

'I:S. ~ 'r ~ ~ SW aa Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY LL

CLOIHEDN 'LJ L ~.

7 EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED Cl PARTIALLYAPPROVED CI NO ACTION C3 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~Y~ES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL NO COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EX LANAT N OR JUSTIFICATION RESOLVED

'Il 8 l(s'(- A M Sourc~5 SIG NOFF H.F. CONSULTANT (ESSEX) DATE <

AEPSC PROGRAM LEAD ENGINEER DATE

CLOIHED¹ ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ g L ( <(

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

{ APPROVED 0 PARTIALLYAPPROVED g NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION . 'l Mo KC- .. ci SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE ~cP~

CLO/HEON ASSESSMENT RECORD POTENTIAL FOR ERROR {PFE) HIGH MEDIUM ~o)

CONSEQUENCE OF ERROR {COE) HIG H MEDIUM OW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDII EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 8 APPROVED C} PARTIALLYAPPROVED Q NO ACTION Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR, LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVE RESOLVED EXPLANATION R JUSTIFICATION T4 J'.~( rv;uii&~a8as M

SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE lll9~

0 CLOIHED¹ ASSESSMENT RECORD I

POTENTIAL FOR ERROR (PFE) HIG H MEDIUM 'OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LO~W~

Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE CI FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLY APPROVED Cl NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~ES >

POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES R ES 0 LVE iD EXPLANATION OR (

RESOLVED JUSTIFICATION Qq4A u JvE'+

A Cc 4Qpi weA.ODic ~c" f~

c~f~a ~uA~ e ((~(-..

Co+ ~.Pc f.E M cLc.~ D vcLtAJ es ALIv (4 sa C3 I 5 o W)sW AL c MA(e c <e~

SIGNOFF H.F. CONSULTANT (ESSEX) DATE i~4X AEPSC PROGRAM LEAD ENGINEER DATE ~ME&

CLOIHED¹ ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH ( EDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low gib(g<<WSte Category I- High priority; corrective action should be taken.

Category ll- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION

~ APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM LOW 4

FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION i Amer 4<<Vm %V cia (

SIG NOFF H.F. CONSULTANT (ESSEX)

,AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

~+4~

CLOIHEDN Q 2 (Q ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action 'necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDN Q Z (9 ~

EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g, APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~ES POTENTIAI FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM, ~ LOW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES di i ESOLVE EXPLANATION OR JUSTIFIC TION RESOLVED t 1444'revue d'tt r<dc.

SIG NOFF H.F; CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~c~

CLOIHEDN ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ 'Z g( .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION . Cl OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV RESOLVED EXPLANATION OR USTIFICATION ik/L C.~du@

SIGNOFF H.F. CONSULTANT (ESSEX) DATE 4 AEPSC PROGRAM LEAD ENGINEER DATE ~<RE&

CLO/HEON $ 1I

+(muk i4~~q H> '70>'Fl z IILI.~ f(5 >

if/

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ~LO Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ gf egg g f I(g //y I(Q EVALUATION AND DISPOSITION RECO,RD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY.

0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION APPROVED 0 PARTIALLYAPPROVED 0. NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM (LOWI FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVE EXPI.ANATION OR JUSTIFICATION ~~ n- uu a' 7 en~~ 6c &~5 ie>

SIGNOFF H.F. CONSULTANT (ESSEX) DATEIQ~

AEPSC PROGRAM LEAD ENGINEER DATE L+~k

/

CLO/HEDN t fg QO 'P~ (m.~

~

n. ~ t4 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM OW CONSEQUENCE OF ERROR (COE) Hl G H MEDIUM OW Consequence Ot Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ Qg -QD. ~j~( ~oo (2 g Ig EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED Kl NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM ~OW~:

CONSEQUENCE OF ERROR (COE) HIG H MEDIUM +LOW FULL NO LOW NP MODIFY RECOMMENDATION PFE AND COMPLIANCE LOW COE AND DOCUMENT OR'USTIFY YES YES RESOLVED E OR JUSTIFICATION OLVED.'XPLANIITION no ck.~

Irt.~~

n

(,Q,E SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC P ROG RAM LEAD ENGINEER DATE ~l'KEG

- A CLOIHED<. V $ t>

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM L

~

CONSEQUENCE OF ERROR (COE) HIGH MEDIUM (~O~W Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHEDII I/< ~ .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY Cl FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED Q NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~LNVF',

CONSEQUENCE OF ERROR (COE) HIG H MEDIUM 0 LOW NO MODIFY RECOMMENDATION FULL NO COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED EXPLANATION OR JUSTIFICATI N RESOLVED Nu '~ e. ~c'c.ca 0 .e-e er SIG NOFF H.F. CONSULTANT (ESSEX) DATE ~I~~

AEPSC PROGRAM LEAD ENGINEER DATE ~MM~

CLOIHEDN Q L ZC> ta.I < M~~ 3 7 $ 42.

ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM ~I.OW CONSEQUENCE OF ERROR (COE) HIG H NlEDIUM LOW.

Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action is highly recommended.

Category Ill - Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

0 CLOIH ED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED Ã NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) H IG H MEDIUM 0 CONSEQUENCE OF ERROR (COE) HIG H MEDIUM OW FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLV EXPLANATION OR JUSTIFICATION SIG NOFF H.F. CONSULTANT (ESSEX) OAV~ ~~~~

AEPSC PROGRAM LEAD ENGINEER DATE ~(P~

CLOIHEDII g~ 7~ i6~ I0 ( q ZE 7 ASSESSMENT RECORD POTENTIAL FOR. ERROR (PFE) HIGH MEDIUM'OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III- Low priority; corrective action is recommended.

Category IV- No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ g'~- KO ~

r Qj, i+I fzF I EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION lg APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION CI OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO ~YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIG H MEDIUM LOW

,AL

'r '4 ~ 'r r ~

eked NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLV D RESOLVED E PLANATION OR JUSTIFICATION )C ~ +o>

~cv CAR Lac.p n

~ %~ / r g vo LD c (c>c,s; SIG NOFF H.F. CONSULTANT (ESSEX) DATE 0 AEPSC PROGRAM LEAD ENGINEER DATE ll~gQ

CLO/HED¹ V -L .Lo P~ +~~ 7 ~f C. (Q$

ASSESSMENT RECORD POTENTIAI FOR ERROR (PFE) HIGH MEDIUM ~LOVLI CONSEQUENCE OF ERROR (COE) HIGH EDIUM) LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLOIHED¹ 7d wM W'r.J 7Q g I~/

'EVALUATIONAND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 . FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION g APPROVED 0 PARTIALLYAPPROVED D NO ACTION G OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW NO LOW NP MODIFY RECOMMENDATION FULL COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESO RESOLVED

~~

(~'-.9 ~ ~m EXPLANATION OR JUSTIFICATION L~ 4'(

Ac~

(i'(

4uw L

ov vt.cL c

SIG NOFF H.F. CONSULTANT (ESSEX)

AEPSC PROGRAM LEAD ENGINEER DATE DATE ~~

4'4

CLOIHEDII g/ Z, 'P ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium . Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II- Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HEDN g ~( .

EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY .

DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED O'O ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES ~NO YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVE EXPLANATION OR JUSTIFICATION He 6uf l+o;~~ c.Lo t. t-6 SIG NOFF H.F. CONSULTANT (ESSEX) DATE i~4 AEPSC PROGRAM LEAD ENGINEER DATE ~9~

CLO/HEON ASSESSMENT RECORD POTENTIAL FOR ERROR {PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR {COE) HIGH MEDIUM LOW Consequence OI Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II -. ~ Medium priority; corrective action is highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV No corrective action necessary, but should be considered.

ASSESSMENT CATEGORY

CLO/HED¹ EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE CI FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION Q APPROVED 0 PARTIALLYAPPROVED Q NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM ~OW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW')

FULL LOW NP, MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLVE D

EXPLANATION OR JUSTIFICATION o Nuinv~ic ir o~

(e c-x o pi" -o g.~i ) 7 ~J SIG NOFF H.F. CONSULTANT (ESSEX) DATE i+~6 AEPSC PROGRAM LEAD ENGINEER DATE LLL9E6

CLO/HEDN ASSESSMENT RECORD I

POTENTIAL FOR ERROR (PFE) HlGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low

~ ~ Sl~l SLY Category I- High priority; corrective action should be taken.

Category II "- Medium priority; corrective action ls highly recommended.

Category III - Low priority; corrective action is recommended.

Category IV - No corrective action necessary, but should be considered, ASSESSMENT CATEGORY

CLOIHEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 5f NO ACTION 0 OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LO CONSEQUENCE OF ERROR (COE) HIGH MEDIUM ~LOW (

FULL NO LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED ESOLVED EXPLANATI N OR JUSTIFICATION o of(ao Bi IL. C o

~

lt I C

>I C 9 lz

~V.4e ' '

.5'c ur:l 'o V~rbiiip'IG NOFF H.F. CONSULTANT (ESSEX) DATE ~h~

AEPSC PROGRAM LEAD ENGINEER DATE ~c~

CLO/HEDN EVALUATION AND DISPOSITION RECORD ASSESSMENT/REVIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY DISPOSITION 0 APPROVED 0 PARTIALLYAPPROVED 0 NO ACTION ISL OTHER EVALUATION FULL COMPLIANCE WITH GUIDELINES NO YES POTENTIAL FOR ERROR (PFE) HIG H MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW C

FULL LOW NP MODIFY RECOMMENDATION COMPLIANCE PFE AND OR LOW COE JUSTIFY AND DOCUMENT YES YES RESOLVED RESOLVED EXPLANATION OR JUSTIFICATION

<~s,W Sc SIG NOFF H.F. CONSULTANT (ESSEX) DATE )+~Yij AEPSC PROGRAM LEAD ENGINEER DATE ~%+

CLO/HEDN

~ ~5 ASSESSMENT RECORD POTENTIAL FOR ERROR (PFE) HIGH MEDIUM . LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW Consequence Of Error High Medium Low High Potential For Error Medium Low Category I- High priority; corrective action should be taken.

Category II - Medium priority; corrective action Is highly recommended.

Category III - Low priority; corrective action Is recommended.

Category IV No corrective action necessary, but should be considered.

ASSESSM ENT CATEGORY

CLOIH EDN EVALVATIONAND DISPOSITION RECORD ASSESSMENT/RE VIEW ACTIONS PENDING DATE 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY 0 FURTHER REVIEW BY

,DISPOSITION APPROVED Cl PARTIALLYAPPROVED Q NO ACTION Q OTHER EVALUATION "FULL COMPLIANCE WITH GUIDELINES NO I ~YES POTENTIAL FOR ERROR (PFE) HIGH MEDIUM LOW CONSEQUENCE OF ERROR (COE) HIGH MEDIUM LOW FULL LOW NP MODIFY RECOMMENDATION PFE AND OR COMPLIANCE LOW COE JUSTIFY AND DOCUMENT YES YES OLVED RESOLVED EXPLANATION OR JUSTIFICATION '8 <2 l mIQ.'hi CxglC Ski 1

Ca<E ~v SIG NOFF H.F. CONSULTANT (ESSEX) DATE AEPSC PROGRAM LEAD ENGINEER DATE /~~