Informs That Development of SAMGs Has Been Temporarily Delayed.Implemetation of SAMGs at Plant Will Be Completed by 981231 Instead on 980401,as Result of Delay
ML17334A666
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/04/1998
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1082Q, NUDOCS 9803090308
Download: ML17334A666 (2)


Text

CATEGORY 1 RESULAOkY INFORMATION DISTRIBUTIOSYSTEM (RIDE)

! ~

4e- "

ACCESSION NBR:9803090308 DOC.DATE: 98/03/04 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50=316~ Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH'.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that development of SAMGs has been temporarily delayed.Implemetation of SAMGs at plant will be completed by 981231 instead on 980401,as result of delay.

DISTRIBUTION CODE: A001D

. COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME PD3-3 LA STANG,LT INTERN FILE CENTER D

NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-3 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

0 1

1 0

R D

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415" 2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071395 IMblAN/l NICNE6llN PQSlfM March 4, 1998 Docket Nos.:

50-315 50-316 AEP:NRC:1082Q U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Stop 0-P1-17 Washington, D. C.

20555-0001 Gentlemen:

Donald C.

Cook Nuclear Plant Units 1 and 2

SEVERE ACCIDENT MANAGEMENT REVISED IMPLEMENTATION SCHEDULE In a previous letter to the NRC, designated AEP:NRC:1082M and dated April 8,

1997, we stated that we intended to complete our assessment of severe accident management capabilities and make any identified enhancements by April 1, 1998.

Engineering resources previously assigned to severe accident management guideline (SAMG) development have been re-assigned to support restart activities for both units.

Therefore, development of the SAMGs has been temporarily delayed.

As a 'esult of this delay, implementation of the SAMGs at Cook Nuclear Plant will be completed by December 31, 1998.

It is still our intent to implement the formal industry position on severe accident management.

This severe accident management position was approved in a letter dated November 21,

1994, by the Nuclear Energy Institute's nuclear strategic issues advisory committee.

Sincerely, EC p~

E. E. Fitzpatrick Vice President

/jen A. Abramson A. B. Beach MDEQ -