Forwards Insp Repts 50-315/97-24 & 50-316/97-24 on 971108- 1227 & Notice of Violation Re Failure to Provide Procedural Controls for Essential Svc Water Pump Discharge Strainers
ML17334A641
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/23/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17334A642 List:
References
50-315-97-24, 50-316-97-24, EA-97-592, NUDOCS 9802040071
Download: ML17334A641 (10)


See also: IR 05000315/1997024

Text

CATEGORY 2

REGULATOR INFORMRTION DISTRIBUTION SYSTEM

(RIDE)

ESSION NBR:9802040071

DOC.DATE:. 98/01/23

NOTARIZED: NO

DOCKET

IL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

M

05000315

50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Xndiana

M

05000316

AUTH.NAME

AUTHOR AFFILIATION

GRANT,G.E.

Region

3 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

FITZPATRICK,E.

American Electric Power Co., Inc.

SUBJECT:

Forwards insp repts

50-315/97-24

E 50-316/97-24

on 971108-

1227

&, notice of violation re failure to provide procedural

controls for essential

svc water pump discharge strainers.

DISTRIBUTION CODE: IE01F

COPIES

RECEIVED:LTR / ENCL

l

SIZE:

TITLE: General

(50 Dkt) -Xnsp Rept/Notice, of, Violation Response

NOTES:

,

E

RECIPIENT

ID CODE/NAME

PD3-3

PD

INTERNAL: AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

RNAL: LITCO BRYCE,J H

NRC .PDR

COPIES

LTTR ENCL

1

1

1

1

'1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

HICKMAN,J

AEOD

TC

FILE CE

~ NRR DRPM PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

1

1

1'

1.

1

1

1 .

1

1

1

1

1

1

LOAMYFRA<e

MRC

PlOAGt=B

PROV,

, NRC FLOPrv

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED: LTTR

17

ENCL

17

~$ 4 RKQy

OO

fe

Cy

+~

~O

++*++

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION III

801 WARRENVILLEROAD

LISLE, ILLINOIS605324351

January

23,

1998

EA 97-0592

Mr. E. E. Fitzpatrick

Executive Vice President

Nuclear Generation Group

American Electric Power

500 Circle Drive

~

Buchanan,'l 49107-1395

SUBJECT:

NOTICE OF VIOLATIONAND NRC INSPECTION REPORT

NO. 50-315/97024(DRP); 50-316/97024(DRP)

Dear Mr. Fitzpatrick:

On December 27, 1997, the NRC completed an inspection at your D. C. Cook 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection.

During the seven-week

period covered by this inspection report, the inspectors observed that the plant was operated in a

safe manner, and radiological work practices were properly followed.

Based on the results of this inspection, two violations of NRC requirements were identified by the

NRC. The violations are cited in the enclosed Notice of Violation (Notice), and the circumstances

surrounding them are described in detail in the subject inspection report. The first violation

involved a failure to perform 10 CFR 50.59 safety evaluations for the removal of annunciators

from service. The second violation involved a failure to provide procedural controls for the

essential service water (ESW) pump discharge strainers.

You are required to respond to this letter and should followthe instructions specified in the

enclosed Notice when preparing your response.

The NRC willuse your response,

in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

35 AP

3'lllllllllfllllllllllllllll

IIIIIIIIIIII

980204007i

9SOf23

PDR

ADQCK 050003i5

8

PDR

0

E. Fitzpatrick

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos. 50-315,,50-RI6

License Nos. DPR-58,

DPR-'74'nclosures

1.

Notice of Violation

2.

Inspection Report

No. 50-315/97024(DRP);

50-316/97024(DR

P)

cc w/encls

John Sampson, Site Vice

President

A. A. Blind, Vice President

Nuclear Engineering

Douglas Cooper, Plant Manager

.

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

-2-

~

~

1

1PJ,~J>

~

<<

I,

In accordance with 10 CFR 2,790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room.

1

t

~ 'I

Sincerely,

1

j

~ ~

g

"1'

I

I

/s/Mare L. Dapas for

I

-:; ,';. - "Geoffrey E. Grant, Director

'

Division of Reactor Projects

Docket Nos. 50-315, 50-316

License Nos. DPR-58, DPR-74

Enclosures:

1.

2.

Notice of Violation

Inspection Report

No. 50-315/97024(DRP);

50-316/97024(DR

P)

cc w/encls:

John Sampson, Site Vice

President

A. A. Blind, Vice President

Nuclear Engineering

Douglas Cooper, Plant Manager

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Distribution:

Docket File w/encls

SRI DC Cook w/encls

PUBLIC IE-01 w/encls

A. B. Beach w/encls

Project Manager, NRR w/encls

Deputy RA w/encls

Rill Enf. Coordinator w/encls

Rill PRR w/encls

CAA1 w/encls (E-mail)

DRS (2) w/encls

TSS w/encls

DOCDESK (E-mail)

DRP w/encls

See Previous Concurrences

DOCUMENT NAME: R:hinsprptsipowershcook>DCC97024.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy

w/attach/encl "N"= No co

OFFICE

NAME

DATE

Rill

Schweibinz

1/

/98

Rill

Bur ess

1/

/98

RIII

Grant

1

98

OFFICIALRECORD COPY

E. Fitzpatrick

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosures,

and your response willbe placed in the NRC Public Document Room.

l

Sincerely,

l

t

I

i

~

=

I

~

C

Geoffrey E. Grant, Director

'Division of Reactor Projects

'-'ocket

Nos. 50-315, 50-316

License Nos. DPR-58, DPR-74

Enclosures:

cc w/encls:

1.

Notice of Violation

2.'nspection

Report

No. 50-315/97024(DRP);

50-316/97024(DRP)

John Sampson,

Site Vice

President

A. A. Blind, Vice President

Nuclear Engineering

Douglas Cooper, Plant Manager.

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Distribution:

Docket File w/encls

PUBLIC IE-01 w/encls

Project Manager, NRR w/encls

Rill Enf. Coordinator w/encls

CAA1 w/encls (E-mail)

TSS w/encls

DRP w/encls

SRI DC Cook w/encls

A. B. Beach w/encls

Deputy RA w/encls

Rill PRR w/encls

DRS (2) w/encls

DOCDESK (E-mail)

DOCUMENT NAME: R:hinsprptshpowers>cook)DCC97024.DRP

To receive a copy of this document, indicate In the box "C" = Copy w/o attach/encl "E" = Copy

w/attach/encl "N"= No co

OFFICE

Rill

Rill

Rill

NAME

DATE

Schweibinz

1/ll/98

Bur

Grant

1/

/98

1/

/

OFFICIALRECORD COPY