UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION III 801 WARRENVILLEROAD USLE. ILUNOIS60532-4351 January 9,
1998 Mr. E. E. Fitzpatrick Executive Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, Ml 49107-1395
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - D.C. COOK
Dear Mr. Fitzpatrick:
On October 22, 1997, NRC Region III management and staff completed the semiannual Plant Performance Review (PPR) of D. C. Cook. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection. resources.
The PPR for D. C. Cook involved the participation of all Region III technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from March through September 1997.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
The PPR focused on recent problems at D. C. Cook, including the findings of an NRC Architect Engineer (AE) inspection and NRC identification of fibrous material inside containment.
These issues led to the issuance of Confirmatory Action Letter (CAL) No. Rill-97-011 on September 19, 1997. The PPR determined that additional inspection activities are warranted.
As a result, a special inspection to review the fibrous material in containment issue has been ongoing, and followup inspections to the CAL and AE team findings willbe performed.
This letter advises you of our planned inspection effort resulting from the D. C. Cook PPR review.
The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next 6 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
IllillllilllilllllllllllllIlllllllllllll 980i2i0277 980i09 PDR ADOCK 050003i5 6
E. Fitzpatrick We willinform you of any changes to the inspection plan. Ifyou have any questions or comments, please contact me at (630) 829-9629.
Sincerely, Docket Nos. 50-315; 50-316 License Nos. DPR-58; No. DPR-74 Bruce L. Burgess, Chief Reactor Projects Branch 6
Enclosure:
Inspection Plan cc w/enc1:
A. A. Blind, Site Vice President John Sampson, Plant Manager Richard Whale, Michigan Public Service Commission Michigan Department of Environmental Quality
D. C. COOK INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)
Initiative Confirmatory Action Letter CAL Followu INSPECTION TITLE/PROGRAMAREA NUMBEROF INSPECTORS PLANNED INSPECTION DATES 1/9-23/98 TYPE OF INSPECTION-COMMENTS CAL Followup Inspection IP 83750 Initiative NUREG 1021 IP 81700 IP 84750 Occupational Radiation Ex osure AE Desi n-Followu Ucensed Operator Exam VAL8 Initial Retakes Securi Radwaste Treatment/
ENuent Monitorin 2/9-13/98 3/8/98-4/17/98 5/1 1-1 5/98 5/18-22/98 6/1-5/98 Core Inspection Followu Ins ection Initial Operator Exam Retake Core - Ph sical Secu
'ore Inspection
E. Fitzpatrick We willinform you of any changes to the inspection plan. Ifyou have any questions or comments, please contact me at (630) 829-9629.
Sincerely,
/s/ Edward R. Schweibinz for Docket Nos, 50-315; 50-316 License Nos. DPR-58; No. DPR-74 Bruce L. Burgess, Chief Reactor Projects Branch 6 Endosure:
Inspection Plan cc w/encl:
A. A. Blind, Site Vice President John Sampson, Plant Manager Richard Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Distribution:
Docket File w/end
~ P,,UBLIC IE-01 w/encl Project Manager, NRR w/encl Rill Enf. Coordinator w/encl CAA1 w/encl (E-mail)
TSS w/encl DRP w/end SRI DC Cook w/encl A. B. Beach w/encl Deputy RA w/encl Rill PRR w/end DRS (2) w/encl DOCDESK (E-mail)
DOCUMENT NAME: G:>COOINNSPPLN5.DCC To tecelve a copy of thle document, IncNcato In the box C
~ Copy without attachment/enctoeure E
~ Copy with attachment/encloeute N
a Noco OFFICE R III Rill Rill t=
Rill
//
Rill NAME ESchweibinz:nh PLo ed JGavula RGar
)PAL JC MLeach ~
GShear vt t BBur e DATE 01/ f/98 01/
/98 01/
98 01/0 /98 01/ 0/98 OFFICIAL RECO COPY