ML17334A598

From kanterella
Jump to navigation Jump to search
Provides Results of flow-induced Vibrational Wear of Bottom Mounted Instrumentation Thimble Tubes Insp.Design Change to Replace All present-design Thimble W/Chrome Plated Tubes Will Be Implemented in 1999 During Refueling Outages
ML17334A598
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/05/1998
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1059G, NUDOCS 9801130050
Download: ML17334A598 (5)


Text

'CATEGORY 1 I

REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9801130050 DOC.DATE: 98/01/05 NOTARIZED: NO DOCKET FACIL:50-Q.5 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50m+6 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME> AUTHOR AFFXLXATXON FITZPATRICK,E. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides results of flow-incuded vibrational wear of bottom mounted instrumentation thimble tubes insp.Design change to replace all present-design thimble w/chrome plated tubes, will be implemented in 1999 during refueling outages.

DISTRIBUTION CODE: A047D COPIES RECEIVED: LTR I ENCL CI SIZE, T1TLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 LA PD3-3 PD HICKMAN,J INTERNAL: AEOD/SPD/RAB XLE CENTER 01 NRR/DE/EMEB OCS-ABSTRACT OGC/HDS2 RES/DET/EIB RES/DET/EMMEB EXTERNAL: LITCO ANDERSON NOAC NRC PDR D U

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION '415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL

'I I

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 491071395 lNQMMSl AllCNIGAM PQlMNI January 5, 1998 AEP:NRC:1059G Docket Nos.: 50-315 50-316 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Donald C. Cook Nuclear Plant Units 1 and 2 BOTTOM MOUNTED INSTRUMENTATION THIMBLE TUBE 1997 WEAR INSPECTION RESULTS The purpose of this letter is to provide the NRC with an updated status regarding flow-induced vibrational wear of bottom mounted instrumentation thimble tubes. Information on this topic was previously provided in our submittal AEP:NRC:1059F, dated July 30, 1996.

During the 1992 refueling- outages, fifteen thimble tubes were replaced in unit 1, and twenty-two -thimble tubes were replaced in unit 2. The replacement thimble tubes were chrome plated at axial locations corresponding to the lower core plate and fuel assembly lower nozzle area. During 'the'1997 unit 1 and unit 2 refueling outages, an eddy current inspection was performed on all thimble tubes. After three cycles of'peration'for each unit, the chrome plated thimble tubes show no indications of wear on the plated portions of the tubes. Active indications of wear continued to be observed on the other thimble tubes. These results reconfirm our conclusion based on the eddy current inspections during the 1994 refueling outages that the chrome plating is an effective engineered solution to vibration-induced thimble tube wear.

We informed the NRC staff in our submittal AEP:NRC:1059E, dated November 23, 1994, that we intend to implement a design change to replace all present-design thimble tubes with chrome plated tubes.

Although less severe, wear indications have also subsequently been observed at axial tube locations corresponding to the lower core support dome and diffuser plate in the lower internals. The new thimble tubes will be chrome plated over a longer length to impede wear from occurring at these additional locations.

As stated in our last letter, AEP:NRC:1059F, we had originally anticipated implementation of the design change on both units during the refueling outages of 1997; however, we have elected to postpone implementation for one operating cycle. The reasons for this scheduling change were: 1)" an analysis of thimble tube wear rates showed that one additional operating cycle could be achieved without significantly increasing the risk'of a.thimble tube failure "and without significant" loss of flux mapping locations; and

2) outage planning for other activities which required the lower j internals to be removed during the 1997 refueling outages made implementation of this change less desirable until a later date.

VSOX<S00S0 esos0S ff!fff!fff!lllllfllllflllfff PDR= ADQCK 050003i5 fff!ff PDR

~/

1

U:S. Nuclear Regulatory Commission AEP: NRC: 1059G

~age 2 Based on the 1997 eddy current results, reconfirmation of item 1 was achieved.

It is both our intention that this design change will be implemented on units during the upcoming refueling outages currently projected to occur in 1999.

We will continue to keep the NRC staff informed of developments in this area.

Sincerely,

~~"5r'~

E. E. Fitzpatrick Vice President

/vlb c: A. A. Blind A. B. Beach NDEQ " DW & RPD NRC Resident Inspector J. A. Abramson