Confirms 830628 Conversation Re Result of Recent Unscheduled Unit 2 Outage.Estimated Target Date for Having Operational Monitors Available Extended to Wk After Plant Returns to Svc on 830707
ML17334A471
Person / Time
Site: Cook  
Issue date: 06/30/1983
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0678G, AEP:NRC:678G, NUDOCS 8307060351
Download: ML17334A471 (3)


Text

REGUL DRY INFORMATION DISTRIBUTI

. SYSTEM (RIDS)

ACCESSION NOR:8307060351 OUTDATE! 83/06/30 NOTARIZED:

NO DOCKET FACIL:50-315 Donald G,

Cook Nuc1 ear Power Pl anti Uni t li Indiana 8

05000315 50-316 Oonal a C ~

Cook Nuclear Power Planti Unit 2i Indiana L

003 AUTH,NAME AUTHVR AFF lLIATION ALEXICHiM~ I',

Indiana 8 Michigan'Electric Co, RECIP ~ NAI1E RECIPIENT AFFILIATION DENTONiH ~ RE Office of NucIear Reactor Regulationi Director

SUBJECT:

Confirms 830628 conversation re result of recent unscheduled Unit 2 outage'stimated target date for having operational monitors availaole extended to wk after plant returns to svc on 830707.

OISTRIBUTIUN CODE,:

A001S COPIES RECEIVED:LTH JENCL SIZE:,

TITLF:

OR Submittal:

General Distribution NOTES:

RECIPIENT IO CODE/NAME NRR ORB 1 BG 01 INTERNAL'LV/nOS3 NRR/OL 0 IR iu I /ME TB 0<

COPIES LTTR ENCL RECIPIENT lQ CODE/NAPE NRR/DE/MTEB NRR/OL/URAB NHR/DSI/RAB RGN3 COPIES LTTR ENCL E)(TERhAL:

ACHS NRG PO<k

~rlS 09 04 LPOR iVSI C 03 05.

TOTAL NUMBEH OF COPIES REQUIRED:

LTTR 26 ENCL

INDIANA I!> MICHIGAN ELECTRIC COMPANY P. O. BOX 18 BOWLING GREEN STATION N E W YORK, N. Y. 10004 June 30, 1983 AEP:NRC:0678G Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 MODIFICATION OF SCHEDULE FOR COMPLETION OF IODINE MONITORS AND UNIT VENT MONITORS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

'etter from R. S. Hunter to H. R. Denton dated May 27, 1983 (AEP:NRC:0678F)

Dear Mr. Denton:

This is to confirm our June-28-,

1983, conversation with your staff wherein we informed them that as a result of the recent unscheduled outage of Unit No..2 of the Donald C. Cook Nuclear Plant, we have performed our Technical Specification Surveillances earlier than originally planned.

This has caused a change in the schedule that we discussed in our above-referenced letter concerning the physical installation, pre-operational testing, monitor calibration and alignment of the iodine monitors being installed on the Main Condenser Steam Jet Air Ejectors (SJAE) and Gland Steam Leak Off (GSLO).

Since these activities cannot be completed until the Unit is operating, it is required that we extend our estimated target date for having operational monitors available until approximately one week after Unit No.

2 returns to service (the Unit is currently scheduled to return to service on July 7, 1983).

A second change in our schedule refers to completion of the work on the Unit No. 2's vent monitor that we referred to in our May 27, 1983 letter.

We had initially intended to complete that work during the Technical Specification Surveillance outage which was to take place after the upcoming Unit No.

1 refueling outage.

Because of the unscheduled nature of the Unit No.

2 outage mentioned at the beginning of this letter, we are not prepared to do the required work at this time.

We have, therefore, modified our plans so that the current work on the Unit No. 2's vent monitor will be completed at the end of the Unit No.

1 Refueling outage> currently scheduled to begin on 15 July, 1983.

830706035i 830EI30 PDR ADOCK 050003l5 P

PDR

Mr. Harold R. Denton June 30, 1983 Page 2

We have also advised your staff that although the radiation monitors on the SJAE and GSLO for both Units 1 and 2 will be operational, we anticipate continuing to have moisture problems which will require maintenance and/or modification for a considerable length of time.

In. the judgment of our personnel, it may take up to one year before we have completed final modifications to the system.

The reason for this time frame is that.the performance of these monitors is likely to be seasonally dependent, and adjustments may be required to accommodate weather conditions.

In order to assure that you receive this letter on a timely basis, our normal Corporate procedures have been bypassed.

We plan, however, to submit this letter to our normal review procedures and will inform you of any error or inaccuracy that we may find during the review process.

Very truly yours, M.

. Ale ch Vice President MPA:dsf cco John E. Dolan R. S. Hunter W. G. Smith, Jr.

Bridgman R. C. Callen G. Charnoff NRC Resident Inspector at Cook Plant' Bridgman