Informs That Westinghouse Analysis of Lifting Arrangement for Reactor Vessel Head & Upper Internals Will Not Be Completed by 830315 Due to Backlog of Load Analyses at Westinghouse.Revised Date for Submittal Is 830601
ML17334A461
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR AEP:NRC:0514H, AEP:NRC:514H, NUDOCS 8303010265
Download: ML17334A461 (4)


Text

C~ A'EGULA Y

INFORMATION OISTRIBUTIO)

YSTEH (RIDS)

\\

ACCESSION NUR:8303010265 OOC.DATE: 83/02/25 NOTARIZED:

NQ FACIL 50 315 Donal d C ~

Cook Nucl ear Power Pl ant@

Uni t 1 g Indiana

'50-316 Donald C.

Cook Nuclear Power Pl ant~ Unit 2i Indiana AUTH'AiRE AUTHOR Af FILIATION ALEXICH,N.P.

Amer ican Electric power Service Cof p.

RECIP ~ NA'lE RECIPIENT AFFILIATION OENTONpHeR ~

Office of Nuclear Reactor Regulationi Director

SUBJECT:

Informs that westinghouse analysis of lifting arrangement for reactor vessel nead I upper internals will not be completed by 630315 due to backlog of loao analyses at Westinghouse,Heviseo aate for submittal is 830601.

DISTRIBUTION CODE:

A033S COPIES RECEIVED:LTR ENCL SI

/

TITLE:

OR Submittal:

USI A-36 Control of Heavy Loaa Near Spent Fuel NOTES:

DOCKET 05000315 000 REC IP IENT ID CODE/NAME NRH ORB 1 SC INTERNAL: NRR REQUAzG 09 NRR/OS I /AEB RGN3 COPIES LTTR ENCL 7

7 1

1 1

1 1

1 REC IP IENT ID CODE/NAivE NRR CLENENSON01 NRR/DL/DRAB 12 9E'G 04 COPIES LTTR ENCL 4

4 1

1 1

EXTERNAl: ACRS NRC PDR NTIS 13 02 6

6 1

1 1

1 LPDR NSIC 03 06 2

2 1

1 TOTAL NUHBEH OF COPIES REVUlRED: LTTR 27 ENCL 27

AMERICAN ELECTRIC POWER Service Corporation 2 Broadway, Peto York,iV. Y. 1000.S (2l2f 440-9000 February 25, 1983 AEP:NRC:0514H Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 CONTROL OF HEAVY LOADS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Denton:

As the final part of our response to "Control of Heavy Loads in Nuclear Plants",

NUREG-0612, Section 2.1 of Enclosure 3 to Mr. D. G. Eisenhut's letter of December 22,

1980, an analysisof the lifting arrangement for the reactor vessel head and upper internals is required.

Westinghouse Electric Corporation was contracted in July, 1982, to perform this work for us.

A completion date of March 15, 1983, for submission of the results of this analysis was provided to you in our submittal letter AEP:NRC:0514E dated September 29, 1982.

Westinghouse has recently informed us that the analysis will not be completed on the date originally anticipated due to the backlog of heavy load analyses work at Westinghouse.

Westinghouse's approximate delay will be four months.

Therefore, please be advised that the revised date for the sub-mittal of the analysis described above will be June 1,

1983.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and com-pleteness prior to signature by the undersigned.

MPA/sag cc:

Attached Very truly yours, iyP~

Assistant Vice President Nuclear Engineering 83030i0265 830225 PDR ADOCN 050003iS P

PDR

Hr. Harold R.. Denton 2

AEP: NRC: 0514H cc:

John E. Dolan Columbus R.

S. Hunter R.

W. Jurgensen W. G. Smith, Jr.

Bridgman R.

C. Callen G. Charnoff NRC Resident Inspector at Cook Plant - Bridgman