Responds to Varga Re Generic Ltr 81-04.Mods Will Be Made to Util Procedure Loss of All Station AC Power Per NUREG-0737,Item I.C.1,by 811115.Formal Training Will Be Completed by 811231
ML17334A323
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/09/1981
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.C.1, TASK-TM AEP:NRC:00537B, AEP:NRC:537B, AWP:NRC:537B, GL-81-04, GL-81-4, NUDOCS 8110190330
Download: ML17334A323 (3)


Text

C-w R"=6JL4T JR 4 INFOR~AT IOV 0 t STR I 8 J 1'ION SYSTE'1 (RIBS)

ACCESSIOV'9R: 8110190330.

D>>JC ~ 04 r KK'1/10/09

'40TARIZKD:

NO FACIL>>:50 315 Donal d Coo<

iVucl ear

?o~er Pl anti Uni t 1i Indi ane 50 316 Donal d Coo< Nucl ear Po~er Pl anti Uni t 2i Indiana AUTH>>,N4~E-AUltkJR AFFILIA1ION HUNTER'i 9', S'o Indianai L Micnigan Electric Co.

RKC IP. VA~=->

RECI? IKNT AFF ILI4TIOV DENTONi'9<, R'o Office, of Vuclear Reactor Regulationi Director>>

30 "}<K T 0500,0315 agg>M~A SUBJ=CT:- Responds to Varga 810908 1 tr re Generic Ltr'1 04rPods'ill oe vade to util procedure "Loss'f All Station ac Power". pari JREG-0737 ' t ee" I ~ C ~ 1'ib y 811115

~ Formal t r ai nina wi 1 I

ve comp,l eted by 511231 DISTRIBUTION CODE>>:

A050S- ~COPIES RECEIVED:LTR ENCl.i SIZE:;:

T"ITL":>>! Stat'i on Bl aojcoUH'(~4SI' 44)

NOTES:IEE.:3i cooies a-11 mater ial ~

IrE'3i cooi es al 1 ~aterial 05000315 05000316 SEC I?IKNT IO CODE/hlAM=>>

ACT'ION; ~

ORB 41 BC,.

INTERNAL< 4E JD 05 IEC. SYS BR Oo'p 4<

10.

OR 9>>>>r 3 15.

PONDER SYS'R 05 COPIES.

LTTR EiVCL'.

1 1I 3.

1 RECIPIENT ID COOK/>>VANE, KLD 09 I8 E.

11 OR'SSESS BR 07 4.

WSKI 04 REG FII.E'1 COPIES L,TTRi NCL 1

2' 1

1 EX TERN4L>>:

4CRS LPOR NSIC ib 05'o lb 1

1 1

IVPOiJ STARNES VRC POR 02'TIS 1-1 1

yo TOTAL VUNBEB>> OF COPIES REQUIRED LTTR ENCL

INDIANA L MICHIGAN ELECTRIC COMPANY P ~ O. BOX 18 BOWLING GREEN STATION NEW YORK, N. Y. 10004

. Donald C. Cook Nuclear Plant Unit Nos.

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 Station Blackout; Generic Letter 81-04 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

"Qb~~

October 9, 1981 AEP:NRC:005378 9+ ~~~ ~mI 1 and 2.'.piro'W.i.,',.~

Cb 1 Ical This letter responds to Mr. S. Varga's let'ter of September 8,

1981 concerning procedures and training for station blackout events and supplements the "Response to Item c" set forth in the attachment to our letter of July 7, 1981 (AEP:NRC:00537).

We have already in place a procedure entitled; "Loss of all Station AC Power" at Cook Plant.

This procedure is based on the Westinghouse Owners'roup (WOG) generic guidelines issued as part of the program for resolution of item I.C.1 of NUREG-0737.

We anticipate some modifications being made to this procedure as a result of the recent WOG seminar and plant specific in-formation regarding the operation of portable equipment and establishing an isolated emergency source of power to Cook Plant under blackout conditions in the AEP System grid.

We have developed a program to restore an offsite power source to Cook Plant under blackout conditions which would allow sufficient. power to run a centrifugal charging pump and a component cooling water pump (one train) for RCS inventory control while on natural circulation cooling following a station blackout.

Further, our. program to,restore offsite power can provide sufficient additional power to allow the operation of at least one Reactor Coolant Pump to accomplish a normal cooldown-using forced circulation following

-a station blackout.

We can establish an isolated and dedicated power source from within the Indiana 8 Michigan Electric-Company (I8RECO) System and/or interconnecting Company Systems.

This fulfills out commitment stated in the "Response to Item c" me~ forth in the attachment to our: letter, No;AEP:NRC:

00537.

Siioi90330 8ii009 PDR ADGCK 050003i5 F

PDR pfn 5(p

Mr. H. R. Denton, Director AEP:NRC:00537B The procedure we have implemented, while coordinated with the above mentioned programs, allows for maintaining adequate core cooling and initiating a natural circulation cooldown in parallel with. trying to restore on-site AC power through the emergency diesel generators and offsite power through the grid.

We have not yet implemented formal operator training in this procedure.

However, the procedure is posted in the Control Rooms and the. operators have reviewed it so that it can be utilized in the unlikely event of a loss of all AC power.

We have also successfully tested one method of establishing an isolated dedicated power source>to'%he Cook Plhnt uti'fi'zing ISMECo's own Buchanan, Hydro Plant.

On this basis we believe that we have taken sufficient action in the interim to allow us the time needed to complete any necessary procedure modifications and formal operator training. It is anticipated that the final procedure will be developed by November 15, 1981 with formal training completed by December 31;<'e1'981'.

Very truly yours, R. S. Hunter Vice President cc:

John E. Dolan - Columbus R. C. Callen G. Charnoff

.R.

W. Jurgensen D. V. Shaller - Br idgman Joe Williams, Jr.

Region III Resident Inspector - Bridgman