ML17333A954

From kanterella
Jump to navigation Jump to search
Forwards Steam Generator 90-day Repts Performed in Support of GL 95-05
ML17333A954
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/21/1997
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17333A955 List:
References
AEP:NRC:1166AI, GL-95-05, GL-95-5, NUDOCS 9707300002
Download: ML17333A954 (4)


Text

CATE("ORY 1

REGULATO, INFOPMATIQN DISTRIBUTION STEM (RIDS)

ACCESSION NBR: 9707300002 DOC. DATE: 97/07/21 NOTARIZED:

NO DOCKET if FACIL: 50-315 Donald C.

Cook Nuclear Poeer Planti Unit ii Indiana M

05000315 AUTH. NAME AUTHOR AFFILIATION F:TZPATRICKi E. E American Electric Poeer Co. i Inc.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forulards steam generator 90-dal) repts performed in support of GL '95-05.

DISTHIBUTIQN CODE:

A047D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submit ta 1:

In servi c e/Tes t ing /Re 1 1 e f from ASME Code GL-89-04 RECIPIENT ID CODE/NAME PD3-3 LA HICKMANiJ COPIES REC IP IENT LTTR ENCL ID CQDE/NAME 1

1 PD3 3 PD 1

1 CGPIES LTTR ENCL 1

1 INTERNAL: AEQD/SPD/RAB NRR/DE/ENEB OGC/HD$2 RES/DET/EMMEB 1

1

'1 1

0 1

1 FILE CENT BSTRACT RES/DET/EIB 1

1 1

EXTERNAL: LITCQ ANDERSON NRC PDR 1

1 1

NQAC NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESKS ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COP IES REQUIRED:

LTTR 13 El'lCL 12

1 J

~ g

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INSlAMSl MCNESA&f PQSVM July 21, 1997 Docket No.:

50-315 AEP: NRC: 1166AZ U.

S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Donald C.

Cook Nuclear Plant Unit 1 STEAM GENERATOR 90 DAY REPORT This letter and attachments make up the Cook Nuclear Plant Unit 1 steam generator (SG) 90 day tube inspection report.

The report consists, of four attachments.

Attachment 1

provides a

condition monitoring and operation assessment evaluation of the as-found condition of the SGs with respect to burst and leakage

concerns, as well as a forward looking assessment for the" potential con'ditions of the SGs at the end of the current cycle.

Attachment 2 provides a report on the required tube integrity calculations performed in support of generic letter (GL) 95-05 and the 2 volt alternate repair criteria.

Attachment 3 provides the available results of our tube sample metalographic examination that was conducted in support of GL 95-05.

This examination remains ongoing.

Attachment 4 provides an acronym listing for the terminology used throughout the overall report.

Sincerely, E.

E. Fitzpatrick Vice President vlb Attachments A. A. Blind A. B. Beach MDEQ -

DW Sc RPD NRC Resident Inspector R. Padgett 9707300002 97072K PDR

=-ADOCK 05000$ i5 P

PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

II