Informs NRC of Results of SG Eddy Current Tube Insp & Subsequent SG Tube Repairs Performed During 1997 Unit 1 Refueling Outage
ML17333A886
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/03/1997
From: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC., INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1166AH, NUDOCS 9705130320
Download: ML17333A886 (11)


Text

CATEGORY 1 REGULATOAIINFORMATION DISTRIBUTION STEM (RIDE')

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR I

ENCI J SIZE:

TITLE: OR Submittal: General Distribution T

ry ACCESS/Og /BR:9705130320 DOC.DATE: 97/05/03 NOTARIZED:

NO DOCKET I FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATiON FITZPATRICK,E.E American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards results of SG eddy current tube insp

& subsequent SG tube repairs performed during 1997 Unit 1 refueling outage.

NOTES:

RECIPIENT COPIES ID CODE/NAME, LTTR ENCL PD3-3 LA 1

1 HICKMAN,J 1

~

1 RECIPIENT ID CODE/NAME PD3-3 PD COPIES LTTR ENCL 1

1 E

INTERNAL: FI E CENTER 01

%R'R~DB" >>E5

'RR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC 1

1 1

1 1

1 1

1 1

1 NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR 1

1 1

1 1

1 1

0 1

1 D

0 E

N

\\

NOTE TO ALL MRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATIONREMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 12

>r 4

Q

~

P

~ g

)

I

~ 1 indiana Michigan Power Company

'00 Circle Drive Buchanan, Ml 491071395 INQMNA NICHI68lN PQMfJPII May 3, 1997 AEP:NRC:1166AH Docket No.: 50-315 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 Gentlemen:

Donald CD Cook Nuclear Plant Unit 1 STEAM GENERATOR 15 DAY ZNSPECTZON REPAZR REPORT Pursuant to the requirements of Cook Nuclear Plant technical specification (T/S) 4.4.5.5a, this letter is to inform you of the results of our steam generator eddy current tube inspection and the subsequent steam generator tube repairs performed during the 1997 unit 1 refueling outage.

Eddy current tube inspection of the unit 1 steam generators began on March 16, 1997.

All inspections and repairs were completed on April 9, 1997.

Znspections included examination of all previously non-plugged tubes.

Attachment 1

describes the scope of the examination and repair activities.

Attachment 2 discusses the investigation of the defects found and the actions taken as a

result of those investigations, in accordance with the follow-up requirements of T/S 4.4.5.5c for inspections that fall into category C-3.

Sincerely, EC E. E. Fitzpatrick Vice President vlb Attachments c

A. A. Blind A. B. Beach MDEQ -

DW & RPD NRC Resident Znspector R. Padgett gpss flffjfljffjffIfflffftllfIIlfff 9705iS0320 9705031 PDR ADOCK 05000$ i5 PDR I

D l

~

~

I

~

~

f I

I'l

ATTACHMENT 1 TO AEP:NRC:1166AH UNIT 1 STEAM GENERATORS TUBE INSPECTION REPORT INSPECTION RESULTS (C-3)

AND TUBE REPAIRS

Attachment 1 to AEP:NRC:1166AH Page 1

Table 1 provides a

summary of the 1997 unit 1 refueling outage (UlR97) steam generator (SG) inspection findings.

The results are presented for each SG, by degradation

location, based upon technical specification (T/S) plugging criteria.

The primary contributing degradation mechanism for the defective tubes was outside diameter stress corrosion cracking (ODSCC) in the tubesheet crevice region at or near the top of the tubesheet, and primary water stress corrosion cracking (PWSCC) at the partial depth roll transition.

Both the ODSCC and PWSCC degradation was axial in nature.

Tube repair methods employed during U1R97 included both hot leg tube end re-roll and plugging.

A total of 699 tubes were kept in service via re-roll repair.

A total of 979 tubes were plugged.

This total included forty-five sleeved tubes and one tube that was plugged following a tube pull.

Details of the repair activities are summarized in table 2.

T/S 4.4.5.5d for implementation of the interim plugging criteria for tube support plate intersections requires NRC notification prior to returning to service should any of the conditions noted in T/S 4.4.5.5d 1-4 arise.

None of these conditions arose.

In summary:

1) actual end-of-cycle voltage distribution did not result in exceeding the leak limit during the previous cycle; 2) no crack-like circumferential indications were detected at the support plate intersections;

3) no indication extended beyond the confines of the tube support plate; and'4) conditional burst probability does not exceed 1x10 E-2.

Table 1

Area CLTSP U-Bend HLTS 272 243 0

243 SG 11 End Defects Recy Plg Lst Lst 100 13 13 7

0 0

6 6

6 SG 12 Ind Defects Recy Plg Lst Lst 88 18 18 29 2

2 10 8

8 100 89 0

89 SG 13 Znd Defects Recy Plg Lst Lst 61 10 10 59 2

2 9

8 8

235 209 0

209 SG 14 Xnd Defects Recy Plg Lst Lst 73 20 20 22 0

0 0

0 287 300 287 0

0 HLTSP 370 0

0 0

171 0

0 0

160 0

0 0

359 0

0 0

HLRT 384 157 152 5

240 123 123 0

714 226 219 7

169 72 72 0

HLSLV Misc TOTAL 39 16 16 0

7 2

1178 442 152 285 20 10 10 0

3 3

36 15 15 1

10 3

658 253 123 130 1275 480 219 254 13 0

0 3

3 3

939 382 72 310 Recy Lst Plg Lst CLTSP AVB U-Bend

= recovery list a plugging list

~ cold leg tube support plate intersection

~ anti-vibration bar intersection i tight radius trows l a 2) u-bends HLTS

~ hot leg tubesheet region HLTSP

~ hot leg tube support plate intersection HLRT m hot leg tubesheet roll transition HLSLV a hot leg hybrid expansion )oint sleeve Table 2 Re-Rolled Tubes U1R97 Remaining Sleeved Tubes Xn -Service Plugged Tubes UlR97 Plugged Tubes Total SG ll SG 12 SG 13 SG 14 Totals 198*

134*

295*

72 699 808 170 443 373 1794 285 130 254 310 979 676 436 447 606 2165

  • Totals include rework of selected tubes previously re-rolled in 1995

ATTACHMENT 2 TO AEP:NRC: 1166AH UNIT 1 STEAM GENERATOR TUBE INSPECTION REPORT CATEGORY C-3 DEGRADATION INVESTIGATION AND CORRECTIVE ACTIONS

Attachment 2 to AEP:NRC:1166AH Page 1

The 1997 unit 1 refueling outage (U1R97) steam generator (SG) eddy current inspection resulted in a category C-3 classification, per technical specification (T/S) 4.4.5.5.

The primary reason for this classification was the defects identified in the hot leg tubesheet region of each SG.

An additional basis for the C-3 classification were indications found in the low row U-bend area.

The contributing degradation mechanism for the defective tubes in the tubesheet region was outside diameter stress corrosion cracking (ODSCC) in the tubesheet crevice at or near the top of the tubesheet, and primary water stress corrosion cracking (PWSCC) at the partial depth roll transition.

The cause for the increase in defective tubes in the tubesheet was investigated primarily for ODSCC at the top of tubesheet, because this degradation form is of most concern from the aspect of RG 1.121 tube integrity for leak and burst.

An historical data review was conducted and it was determined that all the significant indications were present in the previous (1995) inspection.

In some

cases, these indications were traceable back to the 1994 inspection.

In 1995, the inspection of the tubes in this region was conducted using a 'Cecco-5'ddy current probe.

During the 1997 'plus point'nspection, it became apparent that the previous inspection had not identified all the repairable indications in the region.

Therefore, the larger than projected increase in tubesheet defects in 1997 can be attributed to undetected defects from previous cycles.

Subsequent re-analysis of the Cecco-5 data, using today' analysis techniques and guidelines, was able to more readily identify the presence of the ODSCC indications.

A re-analysis of the Cecco-5 data from 1995 was not conducted for PWSCC due to the conclusive results of the ODSCC re-analysis.

It was concluded that the same results would be seen for the PWSCC.

The initial U-bend sample motorized rotating pancake coil inspection program encompassed inspection of all inservice row 1

and row 2 tubes in SG 11.

This program was expanded following discovery of a leaking row 1 tube during the secondary side hydro test that was subsequently confirmed by eddy current inspection.

The SG 11 inspection scope was expanded to include row 3 tubes.

The general inspection program was expanded into inservice row 1 and 2

tubes in the remaining SGs.

Overall inspection findings were essentially split with 12 circumferential indications and 13 axial indications. All tubes with U-bend indications were plugged.

No indications were noted in the U-bend region during an inspection in the 1995 unit 1 refueling outage.

This inspection examined the inservice row 1 and row 2 tubes in SG 14.

Likewise, the U1R97 inspection on SG 14 did not identify any indications.

Review of plant leakrate history and current inspection results suggest that the low row indications developed over a number of fuel cycles.

Based upon plant experience, problems in the low row U-bends have not been prevalent, which, in turn, suggests that it is a slow growth rate phenomenon.

Insitu pressure testing was conducted on the bounding tubes in the U-bend area to quantify acceptable leakage and assure structural integrity.

The insitu testing results confirmed tube integrity requirements per RG 1.121 and acceptable leakage.

Attachment 2 to AEP:NRC:1166AH Page 2

Prior to returning to service, all tubes with non-recoverable (via re-roll) defects were plugged.

Table 2 of attachment 1 contains a

breakdown of the repairs conducted.

Both ODSCC and PWSCC remain a significant concern in the unit 1

SGs.

While the U-bend area is not termed a significant concern due to the limited number of tubes affected and the slow growth rate, it will nevertheless be an area of increased focus during upcoming inspections.

Current remedial actions consisting of reduced temperature and pressure operation and application of industry-approved chemistry guidelines will remain in effect.

Additionally, implementation of aggressive inspection programs and repair technicpxes will be maintained to mitigate the impact of these and other degradation mechanisms found in Cook Nuclear Plant SGs.

\\