-CATEGORY 1 REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9704150242 DOC.DATE: 97/04/08 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTHiNAME AUTHOR AFFIL'IATION FITZPATRICK,E.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs that implementation schedule of severe accident mgt will be delayed until 980401 at Cook Nuclear Plant.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
INTERNA RECIPIENT ID CODE/NAME PD3-3 LA HICKMAN,J 01 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-3 PD NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 COPIES LTTR ENCL E
EXTERNAL: NOAC NRC PDR D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 13 ENCL
" Indiana Michigan Power. Company I 500 Circle Drive Buchanan, Ml 491071395 IMQMNA NICHl64&J PQWM April 8, 1997 AEP:NRC:1082M Docket Nos.:
50-315 50-316 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555 Gentlemen:
Donald C.
Cook Nuclear Plant Units 1 and 2
SEVERE ACCIDENT MANAGEMENT REVISED IMPLEMENTATION SCHEDULE In a previous letter to the NRC, designated AEP:NRC:1082L and dated March 27,
- 1995, we stated that we intended to complete our assessment of severe accident management capabilities and make any identified enhancements by July 1, 1997.
At this time, we are writing to inform you that implementation at Cook Nuclear Plant will be delayed until April 1, 1998.
A Nuclear Energy Institute (NEI) workshop was recently held that provided valuable feedback for implementation of the severe accident management guidelines.
The Westinghouse Owners Group is also developing a generic drill scenario that will not be completed until the fall of 1997.
We want to include this additional intelligence in our program.
Cook Nuclear Plant unit 1 is currently in a refueling outage that began on March 1, and is estimated to be completed in mid-April.
In September, unit 2 will be refueled.
This dual outage year presents an exceptional challenge to plant personnel resources."
Our implementation plan for severe accident management includes completing the accident response guidelines, training, and drilling a large number of plant personnel.
The time period following the unit 2 outage, up to our new implementation date of April 1, 1998, will allow us to complete this effort more effectively.
It is still our intent to implement the formal industry position on severe accident management.
This severe accident management position was approved by the NEI's nuclear strategic issues advisory committee.
That formal position, previously communicated in a letter dated November 21,
- 1994, from NEI to the director, office of nuclear reactor regulation, states that:
150074 9704150242 970408 PDR ADQCK 050003i5 P
PDR IllllllH'Illlltllllll'jll!IHjtlIlljttjllll
.~
U. S. Nuclear Regulatory Commission Page 2
AEP: NRC: 1082M "Each Licensee will:
Assess current capabilities to respond to severe accident conditions using Section 5 of NEI 91-04, Revision 1,
'Severe Accident Issued Closure Guidelines.'mplement appropriate improvements identified in the assessment, within the constraints of existing personnel and hardware, on a schedule to be determined by each licensee and communicated to the NRC, but in any event no later than December 31, 1998."
Sincerely, EF E.
E. Fitzpatrick Vice President vlb CC:
A. A. Blind A. B. Beach MDEQ -
& RPD NRC Resident Inspector Z.
R. Padgett