ML17333A711
| ML17333A711 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/19/1996 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| NUDOCS 9612260204 | |
| Download: ML17333A711 (4) | |
Text
L A.ldiUUKX 4 REGULATORFORMATION DISTRIBUTION SEM (RIDE)
=
-j ACCESSION NBR:9612260204 DOC.DATE: 96/12/19 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION MILLER,L.F.
Region 3 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION FITZPATRICK,E.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele
SUBJECT:
Advises of planned insp effort resulting from plant PPR review completed on 961108 for period Mar 1995 Oct 1996.
DISTRIBUTION CODE:
IEOZD COPIES RECEIVED:LTR
}
ENCL j SIZE: 9 TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
E RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SPD/RAB DEDRO I
NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL: LITCO BRYCEFJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J AEOD C
CENTER
/DRCH HHFB NRR/DRPM/PERB OE DIR RGN3 FILE 01 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
Y D
0 E
N NOTE TO ALL "RIDSM RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL 17
December 19, 1996 Mr. E.
E. Fitzpatrick Senior Vice President Nuclear Generation Indiana Michigan Power Company
[New Address)]
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR)
D.C.
COOK
Dear Mr. Fitzpatrick:
On November 8,
- 1996, NRC Region III management and staff completed the semiannual Plant Performance Review (PPR) of D. C. Cook.
The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for D. C.
Cook involved the participation of all Region III technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from March 1995 through October 1996.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
No changes in inspection focus were identified as a result of the PPR.
This letter advises you of our planned inspection effort resulting from the D.
C.
Cook PPR review.
The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for.
approximately the next 6 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
"~OO
~6Xmw0aoe 9eaaS9 PDR ADOCK 050003i5 8
POR
E.
E. Fitzpatrick We will inform you of any changes to the inspection plan. If you have any questions or comments, please contact me at (708) 829-9629.
Sincerely,
/s/Lewis F. Miller Lewis F. Miller Jr., Chief Reactor Projects Branch 6
Docket Nos.
50-315; 50-316 License Nos.
Enclosure:
Inspection Plan cc w/encl:
A. A. Blind, Site Vice President John
- Sampson, Plant Manager James R. Padgett, Michigan Public Service Commission Michigan Department of Public Health Docket File w/encl PUBLIC IE-Ol w/encl OC/LFDCB w/encl SRI D. C.
Cook w/encl B. L. Burgess, w/encl CAAl w/encl (E-mail)
DRP w/encl
. RIII PRR w/encl D.
C. Cook, PM, NRR w/encl A. B. Beach, w/encl W. L. Axelson, w/encl Document:
On disk To receive a copy of thi~
Ho co t, t cate 1a the hoa C
~ Copy withoet attach/
1 E
~ Copy with attach/eccl N
I OFFICE RIII
~
2 RIII w 4 RIII RIII NAME DATE Rin ro 12 g 96 Gar er Creed Leach Kozak 12
/
96 12/)96 OFFICIAL RECORD COPY Ca&vt&1 12 Q 96
D.
C.
COOK INSPECTION PLAN IP - Inspection Procedure TI - Temporary Instruction Core Inspection Minimum NRC Inspection Program (mandatory all plants)
INSPECTION TITLE/PROGRAN AREA NUNBER OF INSPECTORS PLANNED INSPECTION DATES TYPE OF INSPECTION CONMENTS Initiative I
IP 71001 IP 73753 IP 83750 IP 82701 IP 82301 IP 37550 NUREG 1021 Initiative IP 40500 System Operational Performance Ins ection Licensed Operator Exam-Re ualification Inservice Ins ection Radiation Protection Emer enc Pre aredness Emer enc Pre aredness Engineering and Technical Su ort Licensed Operator Exam Initial AE Desi n
Problem Prevention TBD 11/15/96-12/13/96 2/10/97-2/15/97 3
10 97-3 14 97 2/10/97-2/14/97 5
1 97-5 9 97 7
21 97-7 25 97 7/14/97-8/4/97 7/07/97-7/11/97 TBD 2nd tr '97 TBD Operations/Engineering Team-Regional Initiative Requalification Program Inspection Inservice Ins ection Core Chemistry Core and Radiation Protection Core Emer enc Pre aredness Pro ram Core Emer enc Pre aredness Exercise Core Team Initial Operator Exam Head uarters Initiative Core Ins ection