Forwards Insp Repts 50-315/96-11 & 50-316/96-11 on 960901-1012 & Notice of Violation
ML17333A696
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/05/1996
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17333A697 List:
References
NUDOCS 9612160007
Download: ML17333A696 (5)


See also: IR 05000315/1996011

Text

December 5,

1996

Nr.

E.

E. Fitzpatrick

Senior Vice President

Nuclear Generation

Group

American Electric Power

Company

500 Circle Drive

Buchanan,

HI 49107-1395

SUBJECT:

NRC

INSPECTION

REPORT 50-315/316-96011(DRP)

AND NOTICE OF VIOLATION

Dear Hr. Fitzpatrick:

On October

12,

1996, the

NRC completed

an inspection at your D.

C.

Cook

1

and

2 reactor facilities.

The enclosed

report presents

the results of that

inspection.

During the 6-week period covered

by this inspection report, the inspectors

observed

examples of safety-conscious

operations,

sound engineering

and

maintenance

practices,

and careful radiological controls.

However,

we are

concerned with the inadvertent draining of a safety injection pump at

a time

when draining it prevented it from being properly restored to service.

Based

on the results of this inspection,

the

NRC has determined that one

violation of NRC requirements

occurred.

The violation is cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding it are

described

in detail in the subject inspection report.

The violation was of

concern

because it represented

a failure to follow plant procedures

in the

installation of a temporary modification.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

The

NRC will

use your response,

in part, to determine

whether further enforcement

action is

necessary

to ensure

compliance with regulatory requirements.

0

9'6i2i60007 96i205

PDR

ADOCK 050003i5

8

PDR

>I(,

l

0

(

1',

I'

E.

E. Fitzpatrick

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosures,

and your response will be placed in the

NRC

Public Document

Room (PDR).

Sincerely,

/s/John

A. Grobe for

Docket Nos.: 50-315,

50-316

License

Nos:

DPR-58,

DPR-74

James

L. Caldwell, Acting Director

Division of Reactor Projects

Enclosure:

1.

Notice of Violation

2.

Inspection

Report

No. 50-315/316-96011(DRP)

cc w/encl:

A. A. Blind, Site Vice President

John

Sampson,

Plant Manager

James

R. Padgett,

Michigan Public

Service

Commission

Michigan Department of

Public Health

Docket File w/encl

PUBLIC IE-Ol w/encl

OC/LFDCB w/encl

SRI D.

C.

Cook w/encl

B. L. Burgess,

w/encl

CAA1 w/encl (E-mail)

DRP w/encl

RIII PRR w/encl

D.

C. Cook,

PM,

NRR w/encl

A. B. Beach,

w/encl

W. L. Axelson, w/encl

Document:

R:iInsprptsipowersicookidcc96011.drp

To receive

a copy of thea doc+ant,

fnd$cate fn the box "C"

Copy <<Sthoet attach/encl

E

Copy er5th attach/encl

H

Ho co

OFFICE

RIII

.

C

RIII,.

NAME

Miller

Gr~b

G ldwell

DATE

11

96

96

OFFICIAL RECORD

COPY

ga,s ~<cy

Wp0

rp 0<

00

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

801 WARRENVILLEROAD

LISLE. ILLINOIS60532-4351

December

5,

1996

Mr. E.

E.

Fitzpatrick'enior

Vice President

Nuclear Generation

Group

American Electric Power

Company

500 Circle Drive

Buchanan,

MI 49107-1395

SUBJECT:

NRC

INSPECTION

REPORT 50-315/316-96011(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Fitzpatrick:

On October

12,

1996,

the

NRC completed

an inspection at your D.

C.

Cook

1

and

2 reactor facilities.

The enclosed

report presents

the results of that

inspection.

During the 6-week period covered

by this inspection report,

the inspectors

observed

examples of safety-conscious

operations,

sound engineering

and

maintenance

practices,

and" careful radiological controls.

However,

we are

concerned

with the inadvertent draining of a safety injection pump at

a time

when draining it prevented it from being properly restored

to service.

Based

on the results of this inspection,

the

NRC has determined that

one

vio'lation of NRC requirements

occurred.

The violation is cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding it are

described

in detail

in the subject inspection report.

The violation was of

concern

because it represented

a failure to follow plant procedures

in the

installation of a temporary modification.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

The

NRC will

use your response,

in part, to determine

whether further enforcement

action is

necessary

to ensure

compliance with regulatory requirements.

E.

E. Fitzpatrick

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter, its enclosures,

and your response will be placed in the

NRC

Public Document

Room (PDR).

Sincerely,

Docket Nos.:

50-315,

50-316

License

Nos:

DPR-58,

DPR-74

M mes

L. Caldwell, Acting Director

Division of Reactor Projects

Enclosure:

1.

Notice of Violation

2.

Inspection

Report

No. 50-315/316-96011(DRP)

cc w/encl:

A. A. Blind, Site Vice President

John

Sampson,

Plant Manager

James

R. Padgett,

Michigan Public

Service

Commission

Michigan Department

of

Public Health