Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Motor Operated Valves
ML17333A639
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/07/1996
From: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:0966AF, AEP:NRC:966AF, GL-96-05, GL-96-5, NUDOCS 9611150118
Download: ML17333A639 (4)


Text

CATEGORY 1.

REGULAT'NFORMATION DISTRIBUTIONZSTEM (RIDE)

ACCESSION NBR:9611150118 DOC.DATE: 96/ll/07 NOTARIZED: YES DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.E American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to GL 96-05, "Periodic Verification of Design-Basis Capability of Safety Related Motor Operated Valves."

DISTRIBUTION CODE:

A073D COPIES RECEIVED:LTR ENCL SIZE:

A TITLE: GL-96-05 Periodic Verif. of Design Basis Capabi ty of Safety-Related T

NOTES:

RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: AEOD/SOD/RAB NRR/DE/EMEB NRR/HANSENFA RES/DST EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME HICKMAN,J ER..

1 NRR/DRPM/PECB RES/DSIR/EIB/B RES/DST/PRAB NRC PDR COPIES LTTR ENCL D

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL

4

American Electric P~er Nuclear Generation+ p 500 Circle Drive Buchanan, Ml 491071395 AMRICQM KMCIIC POSSUM November 7, 1996 Docket Nos.:

50-315 50-316 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

AEP:NRC:0966AF Donald C.

Cook Nuclear Plant Units 1 and 2

GENERIC LETTER (GL) 96-05 PERIODIC VERIFICATION OF DESIGN BASIS CAPABILITY OF SAFETY RELATED MOTOR OPERATED VALVES The purpose of this letter is to comply with the 60 day response requested in GL 96-05.

We have read and plan to meet the intent of GL 96-05.

We are a

member of the Westinghouse Owners

Group, which has established a task force to develop a generic program for GL 96-05.

We will be submitting a summary description of our motor operated valve periodic verification program by March 17, 1997.

Our present schedule for completing implementation of periodic verification of design basis capability of GL 89-10, motor operated valves, is as follows.

Determine the type of diagnostic testing necessary to provide data for periodic verification of GL 89-10 actuator/valve design basis capability by December 1,

1996.

Identify the applicability of the testing to each GL 89-10 actuator/valve based on probabilistic risk assessment

ranking, actuator thrust
margin, and system conditions by January 15, 1997.

Develop procedures/work activities as necessary to integrate periodic verification of design basis capability into Cook Nuclear Plant programs by March 17, 1997.

E.

E. Fitzpatrick Vice President cc:

A. A. Blind A. B. Beach MDEQ -

DW & RPD NRC Resident Inspector J.

R. Padgett

,1

'Phi'i'i50ii8 'Phi i07 PDR ADQCK 050003i5 P

PDR SWORN TO AND SUBSCRIBED BEFORE ME THIS r

DAY OF QD Agk 1996 Bah~

Notary Public My Commission Expires:

JAMWA'ION

~ARYPUBUC,eERRlENCOUey, Mi RfycoMMlSSION'EXPIRES FEB 10 1'999

w K

R