ML17333A625
| ML17333A625 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/1996 |
| From: | Fitzpatrick E INDIANA MICHIGAN POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AEP:NRC:1256, GL-96-06, GL-96-6, NUDOCS 9611010318 | |
| Download: ML17333A625 (4) | |
Text
CATEGORY 1 REGULRTZ ZNEORMATZON DZSTRZBUTZOtYSTEM (RZDS)
ACCESS{5N /BR:9611010318 DOC.DATE: 96/10/24 NOTARIZED: YES DOCKET FACXL!~0-315 Donald,C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
RECXP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides 30 day written response to GL 96-06, "Assurance Operability 6 Containment Integrity During Design-Basis Accident Conditions."
DISTRIBUTION CODE:
A072D COPIES RECEXUED:LTR ENCL SIZE:
TITLE: GL 96-06, "Assurance of Equip Oprblty
& Contain.Integ.
during Design NOTES:
E XNTERNA NRR/DSSA/SCSB EXTERNAL: NOAC RECIPIENT ID CODE/NAME NRR/NETZEL,B.
HICKMAN,J COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-3 PD NRR/DE/EMEB NRR/DSSA/SPLB NRC PDR COPIES LTTR ENCL 1
1 0
D N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL
I V
vi
( 'a
Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 491071395 r.~
ItrtISMItM MICIMIGAN PONTES October 24, 1996 AEP: NRC: 1256 Docket Nos.:
50-315 50"316 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Donald C.
Cook Nuclear Plant Units 1 and 2
NRC GENERIC LETTER 96-06 ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS Generic Letter 96-06 requested licensees to determine:
1.
if containment air cooler cooling water systems are susceptible to either waterhammer or two-phase flow conditions during postulated accident conditions; and if piping systems that penetrate the containment are susceptible to thermal expansion of fluid so that overpressurization of piping could occur.
The generic letter required licensees to submit a written summary of their investigation within 120 days of the issue date of the
- letter, and to submit a written response within 30 days indicating whether the requested action will be completed, whether the requested iriformation will be submitted, and whether the requested information will be submitted within 120 days.
This letter provides the 30 day written response.
We intend to complete the requested actions to the extent applicable to Cook Nuclear Plant, and to submit the information within the specified time period.
Sincerely, SWORN TO AND SUBSCRIBED QA BEFORE ME 1996.i Vice President Notary Public My Commission Expires:
J-A/-. Add /
CC:
A. A. Blind A. B. Beach MDEQ "
DW & RPD NRC Resident Inspector R. Padgett UNDAL 80EI,CKE Notary Public, Berrien County, MI My Commission Expires january 2I, 2001 VhiiOi03i8 9hi024, PDR ADOCX aaooosis P
"-Y ~
4
~
k y/ >
M