Text
Nr.
E.
E. Fitzpatrick
Senior
Vice President
Nuclear Generation
Group
American Electric Power
Company
500 Circle Drive
Buchanan,
MI
49107-1395
October 8,. 1996
I
I
i
t
SUBJECT:
NRC
INSPECTION
REPORT 50-315/316-9600gL(PR8)
Dear Mr. Fitzpatrick:
On August 31,
1996,
the
NRC completed
an inspection at your D.
C.
Cook
1
8i 2
reactor facilities.
The enclosed
report presents
the results of that
inspection.
During the 6-week period covered
by this inspection report, your conduct of
activities at the
D.
C.
Cook facilities was generally characterized
by
conservative
decision making,
and good engineering,
maintenance,
and
operations
performance.
A negative trend of work control errors
was
identified by your staff in a timely manner.
There
was
a good root cause
analysis with prompt implementation of short term corrective actions.
We
encourage
you to continue these efforts with good long term corrective
actions'n
accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosures,
and your response will be placed
in the
NRC
Public Document
Room (PDR).
Sincerely yours,
Docket Nos.;
50-315,
50-316
License Nos.:
James
L. Caldwell, Acting Director
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-315/96007(DRP),
50-316/96007(DRP)
cc w/encl:
A. A. Blind, Site Vice President
John
Sampson,
Plant Nanager
James
R. Padgett,
Michigan Public
Service
Commission
Michigan Department of
Public Health
SEE
ATTACHED DISTRIBUTION
FILE NAME:
R:iINSPRPTSiPOWERSiCOOKiC0096007.
To receive
~ copy of thin doc+eat,
indicate in the hox
C
Copy oeithout attach/encl
p
Copy arith attach/encl
H
No co
OFFICE
NAKE
DATE
RIII
Kro
f'-"~- .-
/i. / t.'./96
RIII
Jacobson
r>> ""
/
96
Gree/Caldwell
(.I
'-; /96
OFFICIAL RECORD
COPY
96i03000i6 96i008
ADOCK 05000315
8
Hr.
E.
E. Fitzpatrick
Senior Vice President
Nuclear Generation
Group
American Electric Power Company
500 Circle Drive
Buchanan,
HI
49107-1395
SUBJECT:
NRC
INSPECTION REPORT 50-315/316-96007
(DRP)
Dear Hr. Fitzpatrick:
On August 31,
1996, the
NRC completed
an inspection at your D.
C.
Cook
1
8
2
reactor facilities.
The enclosed
report presents
the results of that
inspection.
During the 6-week period covered
by this inspection report, your conduct of
activities at the
D.
C.
Cook facilities was generally characterized
by
conservative
decision making,
and good engineering,
maintenance,
and
operations
performance.
A negative trend of work control errors
was
identified by your staff in a timely manner.
Ther e was
a good root cause
analysis with prompt implementation of short term corrective actions.
We
encourage
you to continue these efforts with good long term corrective
actions.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosures,
and your response will be placed in the
NRC
Public Document
Room (PDR).
Sincerely yours,
James
L. Caldwell, Acting Director
Division of Reactor Projects
Docket Nos.:
50-315,
50-316
License Nos.:
Enclosure:
Inspection
Report
No. 50-315/96007(DRP),
50-316/96007(DRP)
cc w/encl:
A. A. Blind, Site Vice President
John
Sampson,
Plant Manager
James
R. Padgett,
Michigan Public
Service
Commission
Michigan Department of
Public Health
SEE
ATTACHED DISTRIBUTION
FILE NAME:
R:iINSPRPTSiPOWERSiCOOKiC0096007.
To ro<<afvo ~ copy of thta doceent,
indicate tn tho hoa
C
Copy srlthoot attach/encl
"E
Copy eetth attach/anc1
H
No co
OFFICE
RIII
RIII
NAME
Kro
Jac
n
Grobe Caldwell
DATE
0
96
KO
9
96
OFFICIAL RECORD
COPY
E.
E. Fitzpatrick
Distribution:
Docket File w/encl
PUBLIC IE-01 w/encl
OC/LFDCB w/encl
SRI D. C.
Cook w/encl
B. L. Burgess,
w/encl
CAAI w/encl (E-mail)
DRP w/encl
RIII PRR w/encl
D.
C. Cook,
PH,
NRR w/encl
A. B. Beach,
w/encl
W. L. Axelson, w/encl
P
~gAS ~ECCC
fp0
I
qO
++*++
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION III
801 WARRENVILLEROAD
LISLE, ILLINOIS60532-4351
October 8,
1996
Hr.
E.
E. Fitzpatrick
Senior Vice President
Nuclear Generation
Group
American Electric Power
Company
500 Circle Drive
Buchanan,
HI
49107-1395
SUBJECT:
NRC
INSPECTION
REPORT 50-315/316-96007
(DRP)
Dear Hr. Fitzpatri ck:
On August 31,
1996,
the
NRC completed
an inspection at your D.
C.
Cook
1
8
2
reactor facilities.
The enclosed
report presents
the results of that
inspection.
During the 6-week period covered
by this inspection report, your conduct of
activities at the
D.
C.
Cook facilities was generally characterized
by
conservative
decision making,
and good engineering,
maintenance,
and
operations
performance.
A negative trend of work control errors
was
identified by your staff in a timely manner.
There
was
a good root cause
analysis with prompt implementation of short term corrective actions.
We
encourage
you to continue these efforts with good long term corrective
actions.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter, its enclosures,
and your response will be placed in the
NRC
Public Document
Room (PDR).
Sincerely yours,
,~)
ames
L. Caldwell, Acting Director
Division of Reactor Projects
Docket Nos.:
50-315,
50-316
License Nos.:
Enclosure:
Inspection
Report
No. 50-315/96007(DRP),
50-316/96007(DRP)
cc w/encl:
A. A. Blind, Site Vice President
John
Sampson,
Plant Hanager
James
R. Padgett,
Michigan Public
Service
Commission
Hichigan Department of
Public Health