Informs NRC That Implementation of Current Order Timing Mods & Current Order Surveillance Tests Completed in Units,Per GL 93-04
ML17333A504
Person / Time
Site: Cook  
Issue date: 07/17/1996
From: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1190C, GL-93-04, GL-93-4, NUDOCS 9607230394
Download: ML17333A504 (5)


Text

CATEGORY 1 REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9607230394 DOC.DATE: 96/07/17 NOTARIZED: YES DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs NRC that implementation of current order timing mods

& current order surveillance tests completed in units,per GL 93-04.

DISTRIBUTION CODE:

A030D COPIES RECEIVED:LTR ENCL SIZE:

, TITLE: Generic Ltr-93-04-Rod Control System Failure 6 Withdrawal of Rod Cont NOTES:

RECIPIENT ID CODE/NAME HICKMANiJ INTERNA

FILE CENT 01 R~RPM PECB NRR/DSSA/SRXB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DRCH/HICB NRR/DRPW/PD4-1 COPIES LTTR ENCL NOTE TO ALT "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

.TOTAL NUMBER'F COPIES REQUIRED:

LTTR

, '7 ENCL

'I 1

~ f

American Electric~r 1 Riverside Plaza ~

Columbus, OH 43215 2373 614 223 1000 AAIKNICIM KLKCTNIC PM%0 July 17, 1996 Docket Nos.:

50-315 50-316 AEP'NRC:1190C GL 93-04 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Donald C.

Cook Nuclear Plant Units 1 and 2

License Nos.

DPR-58 and DPR-74 COMPLETION OF COMMITMENTS REGARDING GENERIC LETTER 93-04, "ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CONTROL CLUSTER ASSEMBLIES" In our letter AEP:NRC:1190B, dated January 12, 1995, we committed to implement current order timing modifications and surveillance tests on the rod control systems for Cook Nuclear Plant units 1

and 2.

Also, we committed to inform you upon successful

'mplementation of the modifications and test:ing.

Both of these commitments were made in response to your December 5,

1994, request for additional information regarding Generic Letter 93-04.

This letter is to inform you that implementation of the current order timing modifications and current order surveillance tests have been completed in both units.

The unit 1 current order timing modifications were completed September 9,

1995, and successfully tested October 21, 1995.

The current order timing modifications for unit 2

were completed March 31,

1996, and successfully tested May 6, 1996.

Sincerely, SWORN TO AND SUBSCRIBED BEFORE ME THIS ~~ DAY OF 1996 Vice President otary Public

)en 9b07230394 9b0717 PDR ADQCK,"050003i5 P

'DR

U.

S. Nuclear Regulatory Commission Page 2

AEP:NRC:1190C GL 93-04 CC:

A. A. Blind H. J. Miller NFEM Section ChieE NRC Resident Inspector

- Bridgman J.

R. Padgett

4.

~e

~

w Q

~