CATEGORY 1 REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9607230394 DOC.DATE: 96/07/17 NOTARIZED: YES DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs NRC that implementation of current order timing mods
& current order surveillance tests completed in units,per GL 93-04.
DISTRIBUTION CODE:
A030D COPIES RECEIVED:LTR ENCL SIZE:
, TITLE: Generic Ltr-93-04-Rod Control System Failure 6 Withdrawal of Rod Cont NOTES:
RECIPIENT ID CODE/NAME HICKMANiJ INTERNA
- FILE CENT 01 R~RPM PECB NRR/DSSA/SRXB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NRR/DRCH/HICB NRR/DRPW/PD4-1 COPIES LTTR ENCL NOTE TO ALT "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK/
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
.TOTAL NUMBER'F COPIES REQUIRED:
LTTR
, '7 ENCL
'I 1
~ f
American Electric~r 1 Riverside Plaza ~
Columbus, OH 43215 2373 614 223 1000 AAIKNICIM KLKCTNIC PM%0 July 17, 1996 Docket Nos.:
50-315 50-316 AEP'NRC:1190C GL 93-04 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Donald C.
Cook Nuclear Plant Units 1 and 2
License Nos.
DPR-58 and DPR-74 COMPLETION OF COMMITMENTS REGARDING GENERIC LETTER 93-04, "ROD CONTROL SYSTEM FAILURE AND WITHDRAWAL OF ROD CONTROL CLUSTER ASSEMBLIES" In our letter AEP:NRC:1190B, dated January 12, 1995, we committed to implement current order timing modifications and surveillance tests on the rod control systems for Cook Nuclear Plant units 1
and 2.
- Also, we committed to inform you upon successful
'mplementation of the modifications and test:ing.
Both of these commitments were made in response to your December 5,
- 1994, request for additional information regarding Generic Letter 93-04.
This letter is to inform you that implementation of the current order timing modifications and current order surveillance tests have been completed in both units.
The unit 1 current order timing modifications were completed September 9,
- 1995, and successfully tested October 21, 1995.
The current order timing modifications for unit 2
were completed March 31,
- 1996, and successfully tested May 6, 1996.
Sincerely, SWORN TO AND SUBSCRIBED BEFORE ME THIS ~~ DAY OF 1996 Vice President otary Public
)en 9b07230394 9b0717 PDR ADQCK,"050003i5 P
'DR
U.
S. Nuclear Regulatory Commission Page 2
AEP:NRC:1190C GL 93-04 CC:
A. A. Blind H. J. Miller NFEM Section ChieE NRC Resident Inspector
- Bridgman J.
R. Padgett
4.
~e
~