CATEGORY 1 REGULATO INFORMATION DISTRIBUTION 0 TEM (RIDS)
ACC'SSION NBR:9607010374 DOC.DATE: 96/06/28 NOTARIZED: YES DOCKET,;:I, FACIL:50.-31'6 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
American Electric Power Co., Inc.
RECIP.NAME RECIPIENT AFFILIATION Document 'Control Branch (Document Control Desk)
SUBJECT:
Provides addi info re NRC Bulletin 96-001 which had been sent to all holders of PWR OLs to alert of problems encountered during recent events in which control rods failed to completely insert upon scram signal.
DISTRIBUTION CODE:
IE57D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: NRC Bulletin 96-01 Control Rod Insert1on Problems NOTES:
E RECIPIENT ID CODE/NAME
,PD3-1 PD HICKMAN,J INTERNAL: AEOD NRR/DSSA/SRXB EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD4-2/THOMAS,K ILE CENTER 0
RES NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELk US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
k d
~ ww
American Electric~
1 Riverside Plaza Columbus, OH 4321 5 2373 614 223 1000 June 28, 1996 Docket Nos.:
50-316 AEP:NRC:1249A U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Donald C.
Cook Nuclear Plant Unit 2 NRC BULLETIN 96-01:
CONTROL ROD INSERTION PROBLEMS The purpose of this letter is to provide additional information regarding NRC Bulletin 96-01.
NRC Bulletin 96-01 was sent to all holders of pressurized water reactor operating licensees to alert them to problems encountered during recent events in which control rods failed to completely insert upon a scram signal and to request an assessment of the operability of control rods, particularly in high burnup fuel assemblies.
Our initial response to Bulletin 96-01 was transmi,tted to the NRC via letter AEP:NRC:1249 dated April 8, 1996.
Donald C.
Cook Nuclear Plant Unit 2 is currently operating in its eleventh fuel cycle.
Information regarding assembly burnup for this cycle is contained in the attachment to this letter.
As discussed in our initial response, this information was not available in April 1996, when the available requested information was transmitted.
Sincerely, SWORN TO AND SUBSCRIBED BEFORE ME THIS ~~tg DAY OF 1996 E.
E. Fi zpatrick Vice President OIOO44-Notary Public Attachment 96070%0374 960I PDR ADOCK 050003i6 8
U.
S. Nuclear Regulatory Commission Page 2
AEP:NRC:1249A cc:
A. A. Blind G. Charnoff H. J. Miller - Region III Administrator NFEM Section Chief NRC Resident Inspector
- Briddman J.
R. Padgett
4 U.
S. Nuclear Regulatory Commission Page 3
AEP:NRC:1249A bc:
S. J.
Brewer/D.
H. Malin/M. S. Ackerman J.
B. Kingseed/G.
John J.
A. Kobyra/S.
H. Steinhart/S.
P. Hodge/D.
R. Hair J.
B. Shinnock J.
S.
Wiebe J.
B. Hickman, NRC - Washington, D.C.
- w/attachment M. E. Eberhardt
- w/attachment PRONET
- w/attachment DC-N-6015.1
ATTACHMENT 1 TO AEP:NRC:1249A ADDITIONALINFORMATION REQUESTED IN NRC BULLETIN 96-01
Attachment 1 to AEP:NRC:1249A Page 1 of 5 Additional Information This attachment provides assembly burnup information for Unit 2, Cycle ll.
The beginning-of-cycle burnup is the measured burnup and the end-of-cycle burnup is calculated by the fuel vendor.
The fuel type information and core maps indicating the rodded assemblies were provided in our initial response to NRC Bulletin 96-01 (AEP:NRC:1249, dated'pril 8, 1996).
Attachment 1 to AEP:NRC:1249A Page 2 of 5 Be inin of C cie Assembl Burnu Unit 2, Cycle 11 ASSEMBLY ID W14 Y01 Y05 Y06 Y07 Y09 Y13 Y14 Y15 Y17 Y18 Y20 Y21 Y23 Y24 Y26 Y27 Y28 Y29 Y30 Y35 Y45 Y46 Y50 Y53 Y59 Y60 Y61 Y64 Z01 RCCA ID R112 R18 R143 R120 R155 R118 R144 R119 R140 R110 R154 R135 R147 R145 R134 R127 R138 R106 R01 R141 R137 R153 R139 R126 R124 R116 R103 R40 R102 R131 CORE LOCATION HOS D12 M04 D04 M12 K06 F10 K10 F06 H10 H06 C11 E03 N05 E13 L13 FOS N11 KOS L03 J13 G03 G13 N07 N09 J03 B12 CYCLE BUR NUP(MWD/MTU) 39084 161 70 15512 15513 15355 23490 23683 23419 23705 22978 22825 23809 23526 23470 23525 23556 22707 23735 23517 22977 23645 22985 22350 22466 22133 22311 22465 22569 22546
Attachment 1 to AEP:NRC:1249A Page 3 of 5 ASSEMBLY ID Z02 Z03 Z04 Z05 Z06 Z07 Z08 Z09 Z10 Z11 Z12 Z13 Z14 Z15 Z16 Z41 Z44 Z46 Z52 Z65 Z72 Z74 Z76 RCCA ID R128 R123 R136 R125 R101 R115 R104 R146 R133 R109 R111 R107 R113 R122 R150 R130 R114 R105 R129 R117 R142 R108 R121 CORE LOCATION M02 D14 D02 P04 B04 P12 M14 B10 K02 F14 F02 P06 B06 P10 K14 P08 H02 H14 B08 H12 D08 H04 M08 CYCLE BURNUP(MWD/MTU)
~
Attachment 1 to AEP:NRC:1249A Page 4 of 5 End of cle Assembl Burnu Unit 2, Cycle 11 ASSEMBLY ID W14 Y01 Y05 Y06 Y07 Y09 Y13 Y14 Y15 Y17 Y18 Y20 Y21 Y23 Y24 Y26 Y27 Y28 Y29 Y30 Y35 Y45 Y46 Y50 Y53 Y59 Y61 Y64 201 RCCA ID R112 R18 R143 R120 R155 R118 R144 R119 R140 R110 R154 R135 R147 R145 R134 R127 R138 R106 R01 R141 R137 R139 R126 R124 R116 R103 R40 R102 R131 CORE LOCATION H08 D12 M04 D04 M12 K06 F10 K10 F06 H10 H06 C11 E03 N05 L13 F08 C05 N11 K08 L03 J13 603 C07 613 N07 N09 J03 B12 CYCLE BURNUP(MWD/MTU) 55069 37509 37239 37240 37240 44414 44415 44416 44413 43195 43185 43759 43740 43751 43941 43740 43184 43752 43753 43185 43738 44130 44130 44188 44119 44189 44189 44188 44130 18413
Attachment 1 to AEP:NRC:1249A Page 5 of 5 ASSEMBLY ID Z02 Z03 Z04 Z05 Z06 Z07 ZOS Z09 Z10 Z11 Z12 Z13 Z14 Z15 Z16 Z41 Z44 Z46 Z65 Z72 Z74 Z76 RCCA ID R128 R123 R136 R125 R101 R115 R104 R146 R133 R109 R111 R107 R113 R122 R150 R130 R114 R105 R129 R117 R142 R108 R121 CORE LOCATION M02 D14 D02 P04 B04 P12 M14 B10 K02 F14 F02 P06 B06 P10 K14 POS H02 H14 BOS H12 DOS H04 MOS CYCLE BUR NUP(MWD/MTU) 18414 18417 18420 18409 18416 18416 18419 23329 23350 23338 23352 23329 23332 23332 23351 24325 24340 24335 24324 26392 26392 26397 26393
Amencan Electric Wr 1 Riverside Plaza Columbus, OH 43215 2373 614 223 1000 AMERICAN ELECTRIC POWER June 28, 1996 Docket Nos.:
50-316 AEP:NRC:1249A U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Donald CD Cook Nuclear Plant Unit 2 NRC BULLETIN 96-01:
CONTROL ROD INSERTION PROBLEMS The purpose of,this letter is to provide additional information regarding NRC Bulletin 96-01.
NRC Bulletin 96-01 was sent to all holders of pressurized water reactor operating licensees to alert them to problems encountered during recent events in which control rods failed to completely insert upon a scram signal and to request an assessment of the operability of control rods, particularly in high burnup fuel assemblies.
Our initial response to Bulletin 96-01 was transmitted to the NRC via letter AEP:NRC:1249 dated April 8, 1996.
Donald C.
Cook Nuclear Plant Unit 2 is currently operating in its eleventh fuel cycle.
Information regarding assembly burnup for this cycle is contained in the attachment to this letter.
As discussed in our initial response, this information was not available in April 1996, when the available requested information was transmitted.
Sincerely, ez z
E.
E. Fi zpatrick Vice President THIS ~9<
DAY OF 1996 Notary Public SWORN TO AND SUBSCRIBED BEFORE ME My Commission Expires:
- 9 Attachment
U.
S. Nuclear Regulatory Commission Page 2
AEP:NRC:1249A CC:
A. A. Blind G. Charnoff H. J. Miller - Region III Administrator NFEM Section Chief NRC Resident Inspector
- Bridgman J.
R. Padgett
ATTACHMENT 1 TO AEP:NRC:1249A ADDITIONALINFORMATION REQUESTED IN NRC BULLETIN 96-01
Attachment 1 to AEP:NRC:1249A Page 1 of 5 Additional Information This attachment provides assembly burnup information for Unit 2, Cycle 11.
The beginning-of-cycle burnup is the measured burnup and the end-of-cycle burnup is calculated by the fuel vendor.
The fuel type information and core maps indicating the rodded assemblies were provided in our initial response to NRC Bulletin 96-01 (AEP:NRC:1249, dated April 8, 1996).
Attachment 1 to AEP:NRC:1249A Page 2 of 5 Be inin of C cie Assembl Burnu Unit 2, Cycle 11 ASSEMBLY ID W14 Y01 Y05 Y06 Y07 Y09 Y13 Y14 Y15 Y17 Y18 Y20 Y21 Y23 Y24 Y26 Y27 Y28 Y29 Y30 Y35 Y45 Y46 Y50 Y53 Y59 Y60 Y61 Y64 Z01 RCCA ID R112 R18 R143 R120 R155 R118 R144 R119 R140 R110 R154 R135 R147 R145 R134 R127 R138 R106 R01 R141 R137 R153 R139 R126 R124 R116 R103 R40 R102 R131 CORE LOCATION H08 D12 M04 D04 M12 K06 F10 K10 F06 H10 H06 C11 E03 N05 E13 L13 F08 N11 K08 L03 J13 G03 C07 G13 N07 N09 J03 CYCLE BUR NUP(MWD/MTU) 39084 16170 15512 15513 15355 23490 23683 23419 23705 22978 22825 23809 23526 23470 23525 23556 22707 23735 23517 22977 23645 22985 22350 22466 22133 22311 22465 22569 22546
Attachment 1 to AEP:NRC:1249A Page 3 of 5 ASSEMBLY ID Z02 Z03 Z04 Z05 Z06 Z07 Z08 Z09 Z10 Z11 Z12 Z13 Z14 Z15 Z16 Z41 Z44 Z46 Z52 Z65 Z72 Z74 Z76 RCCA ID R128 R123 R136 R125 R101 R115 R104 R'l46 R133 R109 R111 R107 R113 R122 R150 R130 R114 R105 R129 R117 R142 R108 R121 CORE LOCATION M02 D14 D02 P04'04 P12 M14 B10 K02 F14 F02 P06 B06 P10 K14 P08 H02 H14 B08 H12 D08 H04 M08 CYCLE BUR NUP(MWD/MTU)
~
Attachment 1 to AEP:NRC:1249A End of cle Assembl Burnu Unit 2, Cycle 11 Page 4 of 5 ASSEMBLY lD W14 Y01 Y05 Y06 Y07 Y09 Y13 Y14 Y15 Y17 Y18 Y20 Y21 Y23 Y24 Y26 Y27 Y28 Y29 Y30 Y35 Y45 Y46 Y50 Y53 Y59 Y61 Y64 Z01 RCCA ID R112 R18 R143 R120 R155 R118 R144 R119 R140 R110 R154 R135 R147 R145 R134 R127 R138 R106 R01 R141 R137 R153 R139 R126 R124 R116 R103 R40 R102 R131 CORE LOCATlON H08 D12 M04 D04 M12 K06 F10 K10 F06 H10 H06 E03 N05 E13 L13 F08 C05 N11 K08 L03 J13 G03 C07 G13 N07 N09 J03 B12 CYCLE 8URNUP(MWD/MTU) 55069 37509 37239 37240 37240 44414 44415 44416 44413 43195 43185 43759 43740 43751 43941 43740 43184 43752 43753 43185 43738 44130 44130 44188 44119 44189 44189 44188 44130 18413
Attachment 1 to AEP:NRC:1249A Page 5 of 5 ASSEMBLY ID Z02 Z03 Z04 Z05 Z06 Z07 Z08 Z09 Z10 Z11 Z12 Z13 Z14 Z15 Z16 Z41 Z44 Z46 Z52 Z65 Z72 Z74 Z76 RCCA ID R128 R123 R136 R125 R101 R115 R104 R146 R133 R109 R111 R107 R113 R122 R150 R130 R114 R105 R129 R117 R142 R108 R121 CORE LOCATION M02 D14 D02 P04 B04 P12 M14 B10 K02 F14 F02 P06 B06 P10 K14 P08 H02 H14 B08 H12 D08 H04 M08 CYCLE BUR NUP(MWD/MTU) 18414 18417 18420 18409 18416 18416 18419 23329 23350 23338 23352 23329 23332 23332 23351 24325 24340 24335 24324 26392 26392 26397 26393