UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 22, f 996 Hr.
E.
E. Fitzpatrick, Vice President AEP Indiana Hichigan Power Company P.O.
Box 16631
- Columbus, OH 43216
Dear Hr. Fitzpatrick:
Thank you for the response to 60 Federal Register 36833 regarding request for comments to Draft Guide-1043 that you provided in your letter AEP:NRC:0508AN, dated August 14, 1995.
AEP comments have been considered in full and were very helpful in developing Regulatory Guide 1. 149, Revision 2, "Nuclear Power Plant Simu1ation Facilities for use in Operator License Examinations."
In
- part, AEP comments reflected those of the industry in general and were discussed in detail with representatives from the Nuclear Energy Institute (NEI), the Utility Simulator Users Group (USUG), the ANSI/ANS 3.5 Writing Committee, and other interested parties at a public meeting at NRC Headquarters in Rockville, HD on November 15, 1995.
Those discussions served as the basis for development of this important performance-based regulatory guidance that will serve the goals of both the industry and the Commission.
Other AEP comments were considered to be program-specific or unique to administration of the simulation facility at the Donald C.
Cook Nuclear Plant.
This letter addresses program-specific AEP comments with respect to the final Regulatory Guide
- 1. 149, Revision 2.
Consideration should be given to the use of a simulator capability when determining testing requirements.
In general, a simulator capability should be validated at least once, usually as part of initial system or simulator acceptance testing.
Thereafter, those capabilities that are used in a
malfunction capacity to cause, prompt, 'or elicit operator response or to enable a larger scenario, should be considered to be "integral to the facility's training and examination scenarios and exercises" for the purpose of periodic validation and operability testing.
Remote functions should be considered to be a function of the software design for the associated
- system, even though it is'recognized that they "affect or alter the normal operation of simulated instrumentation or components in the model."
Consequently, the operability and effects of remote functions should be included in system validation testing.
The testing frequency of "...at least once every four years, approximately 25K per year.." is specified in 10 CFR 55.45.
Applicability of this testing frequency requirement is, therefore, not a function of the methodology by
- 0. 005) 9b05020238 9b0422 PDR ADQCK 050003i5 V
/
/gl
~~+p I if/~
RFTURI~ To REGULATORY CENTRAL FILES I
which the testing is performed.
Deletion of the periodic testing frequency as a requirement can only be effected by application for an exemption from specific provisions of 10 CFR 55.45 as provided by 10 CFR 55. 11.
Absent specific exemption, the AEP testing program should consider the specified testing frequency to be applicable.
Sincerely, Original signed by:
Stuart A. Richards, Chief Operator Licensing Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation DISTRIBUTION:
Central Files HOLB RF PUBLIC DOCUMENT NAME:
G:iCOLLINSiREPLY.AEP To receive e copy of this document, Indi ln the botu C
u Copy without ettechment/enclosure E
~ Copy with ettechment/enclosure N
~ No copy OFFICE NAME DATE HOLB:ORCH
/
Collins:c 02/21/96 OLB:DRCH t
HOLB:
CH SRichards
/ c.'Z/96 A
oaeb 02
</96 OFFICIAL RECORD COPY
which the testing is performed.
Deletion of the periodic testing frequency as a requirement can only be effected by application for an exemption from specific provisions of 10 CFR 55.45 as provided by 10 CFR 55. 11.
Absent specific exemption, the AEP testing program should consider the specified testing frequency to be applicable.
Sincerely, Stuart A. Richards, Chief Operator Licensing Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation
which the testing is performed.
Deletion of the periodic testing frequency as a requirement can only be effected by application for an exemption from specific provisions of 10 CFR 55.45 as provided by 10 CFR 55.ll.
Absent specific exemption, the AEP testing program should consider the specified testing frequency to be applicable.
Sincerely, Original. signed by:
Stuart A. Richards, Chief Operator Licensing Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation tr,,
lL 4f
/
DISTRIBUTION:
Central Files PUBLIC n
DOCUMENT NAME,':iCOLLINSiREPLY;AEP.-
To receive a copy oI tlilidocument, Indi In the box: "C
~ Copy without attachment/enclosure "F." ~ Copy with attachment/enclosure N
~ No copy OFFICE NANE DATE HOL'B:DRCH FCollins:
02/21/96 HOLB:
CHil A
o a'eb,'2 "c/96
'LB:DRCH C
'SRichards 0 / l'Z/96 OFFICIAL RECORD COPY k
~
~
4
((
1 Lr I
r
October 24, 1995 DOCKET NOISl 50-315 and 50-316 See attached page DISTRIBUTIONT ~]o di LDocket File.,"
PD3-1 Reading CJamerson JBkdcmnn-
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT VNITS 1 AHD 2 MIUALREDIOACZXVE EFHZENT RELIDlSE REPORT FOR JANUARY 1, 1994 t0 DELIBER Nl, 1994 The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(sl DATED Exemption Construction Permit No. CPPR-Facility Operating License No.
Order Monthly Operating Report for
, Amendment No.
,Amendment No.
transmitted by Letter
"""I M
tHoa for Jan 11 1994 to December 31 1994 Other transmitted by Letter
?farch 20, 1995 Office of Nuclear Reactor Regulation
Enclosures:
As Stated cc:
See next page OFFICE>
SURNAME>
OATEN LA:PD3-CJa'mer" NRC FORM 318 {10/80) N M 0240 OFFICIAL RECORD COPY
y 1
r
'4
'IP 3i l
Chief, Branch of Federal Activities Division of Habitat Conservation 400 ARLSg U. S. Fish and Wildlife Service 1849 C Street, N.
W.
Washington, D. C.
20240 Jack Barnette Radiation Program Manager, Region 5
(5AR26)
Environmental Protection Agency 77 West Jackson Boulevard
- Chicago, IL 60604-3507
DISTRIBUTION:
Docket File PD31 Rdg. File Cdamerson DQGKET No(s) 5G-315 5 50-316 To Those on Attached List J00 14 lggg sUBJEcT:
American Electric Power Service Corporation
-ODonald C.
Cook Nuclear Power Plant, Unite) 8 2 The following documents concerning our review of the subject facility are transmitted for your information.
DESCRIPTION OF DOCUMENT Notice of Receipt of Application Draft/Final Environmental Statement Notice of Availabilityof Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)
Exemption DATED Construction Permit No. CPPR-Facility Operating License No.
Order Monthly Operating Report for Annual/Semi-Annual Report:
Nuclear Plants Units 1
8 2 Other
, Amendment No.
,Amendn)ent No.
transmitted by Letter 0
transmitted by Letter
Enclosures:
As Stated Office of Nuclear Reactor Regulation Carole Jamerson CC; OFFICES SURNAMES DATE>
...LA,'D)1
...COamers....
..//6/I.'t/94 NRC FORM 318 I10/80) NRCM 0240 OFFICIAL RECORD COPY
T
~~ e
\\,
Jack Barnette Radiation Program Manager, Region 5
(5AR26)
Environmental Protection Agency 77 West Jackson Boulevard
- Chicago, IL 60604-3507
- Chief, Branch of Federal Activities Division of Habitat Conservation 400 ARLSg U.S.
Fish and Wildlife Service, 1849 C Street, N.W.
Washington, D.C.
20240 1
Dr. William C.
Cunningham FDA Research Chemist HIST Building 235/B125 Gaithersburg; HD 20899
April 13, 1994
~
DISTRIBUTION w/o encI s.
CDocket file, PD3-1 Rdg file C. Jamerson DOCKET NO(S).
50-315 50-316 To Those on Attached List AMERICAN ELECTRIC POllER SERYICE CORP. - DONALD C.
COOK NUCLEAR POWER PLANT, UNIT 1
AND UNIT 2 The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application DESCRIPTION OF DOCUMENT DATED Draft/Final Environmental Statement Notice of Availability of Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s)
Exemption Construction Permit No. CPPR-Facility Operating License No.
Order Monthly Operating Report for Annual/Semi-Annual Report:
Annu January 1,
1993 to December 31, 1993 Other
, Amendment No.
,Amendment No.
transmitted by Letter transmitted by Letter 03/25/94
Enclosures:
As Stated Office of Nuclear Reactor Regulation Carole Jamerson OFFICE>
SURNAME>
OATEN LA:PD3-1\\
CJamers OO/5/9O NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD,COPY
/
~ \\
I/)arch 31, 1994 DISTRIBUTION PD31 Rdg CJamerson w/o encls.,
1 DOCKETNO(S). 50>>315 8I 50-316 50-341 Bill Franz (5)
U.S. Environmental Protection Agency Environmental Review Coordinator 77 West Jackson Boulevard Chicago, IL 60604-3590
SUBJECT:
INDIANA HICHIGAN POWER COHPANY AND DETROIT EDISON COMPANY - D.C.
COOK, UNITS 1 AND 2, AND FERHI-2, RESPECTIVELY The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application Draft/Final Environmental Statement DESCRIPTION OF DOCUMENT DATED Notice of Availabilityof Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nifleant Hazards Conditions See Page(s) 2/8/94 Exemption Construction Permit No. CPPR-Facility Operating License No.
Order Monthly Operating Report for Annual/Semi-Annual Report:
Other
, Amendment No.
,Amendment No.
transmitted by Letter transmitted by Letter Office of Nuclear Reactor Regulation
Enclosures:
As Stated Carole Jamerson OFFICE LAPPD3-SUBNAMEW OATEN'C j.".merino
,. 3/31J 9R NBC FORM 318 (10/aol NBCM 0240 OFFICIAL RECORD COPY
~
U
~
~
~ y I
E i
~
~
~
h
DOCKET NO(S).
50-315 ct 50<<316.
50-341 Bill Franz {5)
U.S. Environmental Protection Agency Environmental Revvietv Coordinator
-77 West Jackson Boulevard Chicago, IL 60604-3590 INDIANAHICHIGAN POWER COHPANY AND AND 2, AND FERMI-2, RESPECTIYELY el~a DISTRIBUTION >v/o encl s-.,l
,:j PD31 Rdg CJamerson ffarch 31, 1994
,')
)),
II
,gI
)).
DETROIT EDISON CO/)PANY - 0 C
COOK, UNITS 5 The following documents concerning our review of the subject facility are transmitted for your information DESCRIPTION OF DOCUMENT Notice of Receipt of Application Draft/Final Environmental Statement
,Notice of Availabilityof Draft/Final Environmental Statement Safety Evaluation Report, or Supplement No.
Environmental Assessment and Finding of No Significant Impact Notice of Issuance of Environmental Assessment Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License Biweekly Notice; Applications and Amendments to Operating Licenses Involvin No Si nificant Hazards Conditions See Page(s)
DATED 2/8/94 Exemption Construction Permit No. CPPR-Facility Operating License No.
Order Monthly Operating Report for Annual/Semi. Annual Report:
Other
, Amendment No.
,Amendment No.
transmitted by Letter transmitted by Letter Office of Nuclear Reactor Regulation
Enclosures:
As Stated CarOle JalrrerSOn CC: