Forwards Preliminary Insp Repts 50-315/95-15 & 50-316/95-15 on 960108-22 & Preliminary Performance Assessment/Insp Planning Tree.No Violations Noted
ML17333A295
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/29/1996
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17333A296 List:
References
NUDOCS 9602150118
Download: ML17333A295 (6)


See also: IR 05000315/1995015

Text

UNITEo sTATes

NUCLEAR REGULATORY COMMISSION

REGION III

801 iVAARENVILLCAOAD

USLC. IILINOIS60532

4351

January

29,

1996

f

Hr.

E.

E. Fitzpatrick

Senior Vice President

Nuclear Generation

Indiana Hichigan

Power

Company

1 Riverside

Plaza

Columbus,

OH

43216

SUBJECT:

D.

C.

COOK

INTEGRATED PERFORMANCE ASSESSHENT

IN-OFFICE REVIEW

PRELIHINARY RESULTS

(INSPECTION

REPORT 50-315/95015,

50-316/95015)

Dear Hr. Fitzpatrick:

During the period from January

8-22,

1996,

a team under the direction of

Region III completed

the preliminary phase of an Integrated

Performance

Assessment

of Donald

C.

Cook Nuclear Plant,

Units

1

and 2.

" This phase of the

assessment

consisted

of an in-office review of the inspection

record

and

performance history for a two-year period spanning

January

1994 to

January

1996.

The preliminary assessment

of the written record identifies

performance

strengths

and weaknesses

in the areas

of Safety

Assessment/Corrective

Action, Operations,

Engineering,

Haintenance,

and Plant

Support.

The results of the preliminary assessment

are

summarized

in the

attached

report

and are depicted

on the attached

Preliminary Performance

Assessment/Inspection

Planning Tree.

The second

phase of the assessment

will consist of a two week onsite

assessment

scheduled

to begin

on February

5,

1996.

During this phase of the

assessment,

the

team will attempt to determine current performance

and

compare

and contrast

those observations

and assessments

to its preliminary

observations

as well

as

draw conclusions

in those

areas originally considered

to be indeterminate.

The results of the onsite

assessment

will be evaluated

along with those of the preliminary assessment

and documented

in

a Final

Assessment

Report.

The final results will also

be depicted

on

a Final

Performance

Assessment/Inspection

Planning Tree.

This preliminary information is being provided for your information only.

No

response

to this letter or the preliminary assessment

is required.

.

9602150118

960129

PDR

ADOCK 05000315

8

PDR

~

~

E.

E. Fitzpatrick

Should you have

any questions

concerning this preliminary assessment,

or the

assessment

process

in general,

please

contact the assessment

team leader Hr.

Stanley Stasek

at (708) 829-9604.

Sincerely,

William L. Axelson, Director

Division of Reactor Projects

Docket No. 50-315

Docket No. 50-316

I

Enclosures:

1.

Preliminary Assessment

Report

2.

Preliminary Performance

Assessment/Inspection

Planning Tree

cc w/encls:

A. A. Blind, Site Vice President

John

Sampson,

Plant Manager

James

R. Padgett,

Michigan Public

Service

Commission

Michigan Department of

Public Health

Distribution

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI,

D.

C.

Cook w/encl

RHB/FEES w/o encl

DRP w/encl

RIII PRR w/encl

D.

C.

Cook,

PH,

NRR w/encl

IPAS (E-Mail) w/encl

A. B.

Beach w/encl

DOCUMENT NAME:

R: iINSPRPTSiPOWERSiCOOKiDCC95015. DRP

To raca1ua

~ copy oS thea doc+ant,

tnd1cata

1n th>> hoa "C

~ Copy n1thout attachJanc1

f," ~ Copy uSth attach)cool

"N

No co

OFFICE

RIII

RIII

NAME

DATE

Grant,

Axels

n

01

/96

1

/96

OFFICIAL RECORD

COPY

g ~

S

I

~PR RKgI

Wp

+

O

ig

>>>>**4

UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION III

801 WARRENVILLEROAD

LISLE. ILLINOIS60532-4351

January

29,

1996

Hr.

E.

E.

Fitzpatri ck

Senior Vice President

Nuclear Generation

Indiana Hichigan

Power

Company

1 Riverside Plaza

Columbus,

OH

43216

SUBJECT:

D.

C.

COOK INTEGRATED PERFORHANCE

ASSESSHENT - IN-OFFICE REVIEW

PRELIHINARY RESULTS

(INSPECTION

REPORT 50-315/95015,

50-316/95015)

Dear Hr. Fitzpatri ck:

During the period from January

8-22,

1996,

a team under the direction of

Region III completed

the preliminary phase of an Integrated

Performance

Assessment

of Donald

C.

Cook Nuclear Plant, Units

1

and 2.

This phase of the

assessment

consisted of an in-office review of the inspection record

and

performance history for a two-year period spanning

January

1994 to

January

1996.

The preliminary assessment

of the written record identifies

performance

strengths

and weaknesses

in the areas

of Safety

'ssessment/Corrective

Action, Operations,

Engineering,

Haintenance,

and Plant

Support.

The results of the preliminary assessment

are

summarized

in the

attached

report

and are depicted

on the attached

Preliminary Performance

Assessment/Inspection

Planning Tree.

The second

phase of the assessment

will consist of a two week onsite

assessment

scheduled

to begin

on February

5,

1996.

During this phase of the

assessment,

the team will attempt to determine current performance

and

compare

and contrast

those observations

and

assessments

to its preliminary

observations

as well

as draw conclusions

in those

areas originally considered

to be indeterminate.

The results of the onsite

assessment

will be evaluated

along with those of the preliminary assessment

and documented

in a Final

Assessment

Report.

The final results will also

be depicted

on

a Final

Performance

Assessment/Inspection

Planning Tree.

This preliminary information is being provided for your information only.

No

response

to this letter or the preliminary assessment

is required.

E.

E. Fitzpatrick

Should you have

any questions

concerning this preliminary assessment,

or the

assessment

process

in general,

please

contact the assessment

team leader

Mr.

Stanley Stasek

at

(708) 829-9604.

Sincerely,

Will)am L. Axel on, Director

Division of Reactor Projects

Docket No.

50-315

Docket Ho. 50-316

Enclosures:

1.

Preliminary Assessment

Report

2.

Preliminary Performance

Assessment/Inspection

Planning Tree