Notification of Potential Errors in the Calculation Related to Emergency Core Cooling System Performance Potentially Impact the Compliance with the Peak Cladding Temperature Limit 2200 Degree F
ML17333A118
Person / Time
Site: Pilgrim
Issue date: 11/17/2017
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17333A118 (2)


Text

  • ~Entergr. Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 November 17, 2017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

10 CFR 50.46(a)(3)(ii) Report Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35

REFERENCE:

1. GE Hitachi Proprietary Information - 10 CFR 50.46 Notification Letters 2017-01, dated June 12, 2017 and 2017-02, dated August 2, 2017
2. 002N6994, Supplemental Reload Licensing Report for Pilgrim Nuclear Power Station Reload 21 Cycle 22, Revision 1, dated May 2017 LETTER NUMBER: 2.17.074

Dear Sir or Madam:

Pursuant to Title 10 Code of Federal Regulations (CFR) 50.46(a)(3)(ii), Entergy hereby notifies the Nuclear Regulatory Commission (NRC) staff of information provided by GE Hitachi by Reference 1 concerning potential errors in the Pilgrim reload calculations related to Pilgrim Emergency Core Cooling System (ECCS) performance that could potentially impact the compliance with the peak cladding temperature (PCT) limit of 2200°F.

The referenced notification applies to GNF2 Type Fuel. The plant specific Licensing Basis PCT for GNF2 in Reference 2, Supplemental Reload Licensing Report is 2150°F. The reported change in PCT in response to Reference 1 is 30°F. The 30°F PCT increase, makes the Licensing Basis PCT 2180 °F, which still complies with the calculated PCT limit of 2200°F specified by 10 CFR 50.46(b)(1).

Thus, the reported PCT change has no impact on the public health and safety.

In addition, Pilgrim Nuclear Power Station did not provide 50.46(a)(3)(ii) submittals for 2015 and 2016 as there were no reported changes to the Pilgrim ECCS performance that could have potentially impacted compliance with the PCT limit of 2200°F.

If you have any questions or require additional information, please contact me at (508) 830-8323.

I Entergy Nuclear Operations, Inc. Letter No. 2.1?.074 Pilgrim Nuclear Power Station Page 2 of 2 There are no regulatory commitments contained in this letter.

Sincere~~{)(_,_~~

Everett P. Perkins, Jr.

Manager, Regulatory As'sur a, ice EPP/mp cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. John Lamb, Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8C2A Washington, DC 20555 NRC Resident Inspector Pilgrim Nuclear Power Station