ML17333A015

From kanterella
Jump to navigation Jump to search
Reponds to IE Bulletin 80-05 Re Damage to Chemical Vol Control Sys Tanks.Bulletin Inapplicable Since Facility Is BWR Not PWR
ML17333A015
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/12/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ELE-GCS-80-177, IEB-80-05, IEB-80-5, NUDOCS 8007300544
Download: ML17333A015 (1)


Text

Washington Public Power Supply System j

( <:,

A JOINT OPERATING AGENCY P. O. BOX 968 3000 GCO. WASHINCTON WAY RICHI.ANO. WAEIHINCTON 9 $3 PHON4@9$ $ 375'3 0 i8 0 el June 12, 1900 r~

ELE-GCS-UO-'l77 Docket No. 50-397 Mr. R. H. Engelken, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 1990 N. California Boulevard Suite 202, Walnut Creek Plaza Walnut Creek, CA 94596

Subject:

WPPSS NUCLEAR PROJECT NO. 2--

RESPONSE TO IE BULLETIN 80-05

Dear Mr. Engelken:

The subject IE Bulletin, entitled, "Vacuum Conditions Resulting in Damage to Chemical Volume Control System (CVCS) Tanks," has been reviewed for application to WNP-2.

Since this bulletin reauired response only from Pressurized Water Reactor Licensees or applicants, to WNP-2, which is a Boiling ltater Reactor.

it is not applicable Very truly yours, D. L. RENBERG R Assistant Director Technology DLR:GCS:crw cc: Director, NRC Office of Inspection and Enforcment