ML17332A856
| ML17332A856 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/19/1995 |
| From: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| AEP:NRC:1230, NUDOCS 9507240342 | |
| Download: ML17332A856 (4) | |
Text
OPRZQRZTY 1
(ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9507240342 DOC.DATE: 95/07/19 NOTARXZED: NO DOCKET g
FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION AXELSON,W.L.
Region 3 (Post 820201)
SUBJECT:
Appreciates advance notification of planned NRC Regional Inz~iative insp activities provided I.n 950607 ltr.Also, requests that start date of insp plan 37550 be kept flexible to confirmation in late Oct/early Nov time frame.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR ENCL CI SIZE:A TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD XNTERNAL: AEOD/DEIB AEO C
ILES TER NRR/DORS/OEAB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL LITCO BRYCEiJ H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME HICKMAN,J AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN3 FILE 01 NOAC COPIES LTTR ENCL NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5DS (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL
I
Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 Z
INDMNA NICHIREN PQWKR July 19, 1995 AEP'NRC:1230 Docket Nos.:
50-315 50-316 W. L. Axelson DRP USNRC Region III 801 Warrenville Road Lisle, Illinois, 60532-4351
Dear Mr. Axelson:
Donald C.
Cook Nuclear Plant Units 1 and 2
SEMI ANNUAL INSPECTION PLAN FOR DONALD C.
COOK NUCLEAR PLANT We appreciate the advance notification of planned NRC Regional Initiative inspection activities provided in your June 7,
- 1995, letter on this subject.
Three of the seven inspections identified for conduct during 1995 have been completed as of July 19, 1995.
Of the remaining four, only IP 37550 (ENG),
scheduled for ll/13-12/1/95, represents a
potential hardship in that it is scheduled to commence very close to the scheduled completion of a refueling outage.
We request that, if possible, the start date of IP 37550 (ENG) be kept
- flexible, subject to confirmation in the late October/early November time frame.
Thank you for your consideration in this matter.
Sincerely, EF~
Vice President pit 9507240342 950719 PDR ADOCK 05000515 Q
U.
S. Nuclear Regulatory Commission Page 2
AEP:NRC:1230 CC:
A. A. Blind G. Charnoff H. J. Miller NFEM Section Chief NRC Resident Inspector
- Bridgman J.
R. Padgett W. T. Russell