ML17332A742

From kanterella
Jump to navigation Jump to search
Amends 194 & 180 to Licenses DPR-58 & DPR-74,respectively, Deleting Part of License Condition 2.C.(4) to License DPR-58 & License Condition 2.C.(3)(o) to License DPR-74
ML17332A742
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/19/1995
From: John Hickman
NRC (Affiliation Not Assigned)
To:
Shared Package
ML17332A743 List:
References
NUDOCS 9504250438
Download: ML17332A742 (11)


Text

gPR REQ0

+

0 0

~o~

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

1 M NDMENT TO FACILITY OPERATING LICENSE Amendment No.

194 License No.

DPR-58 l.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Indiana Michigan Power Company (the licensee) dated April 6,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9504.+50%3 8 950419 pDR QQQCK

@DR

0 lt

2.

Accordingly, the license is amended by changes to paragraph 2.C.(4) of Facility Operating License No.

DPR-58 to read as follows:

2.C.(4)

Administrative controls for fire protection as described in the licensee's submittals dated January 31, 1977 and October 27, 1977 shall be implemented and maintained.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Page 3 of License No.

DPR-58*

Date of Issuance:

ppzj$

$ 9

$ 995 CtC John B. Hickman, roject Manager Project Directorate III-l Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

  • Page 3 is attached for convenience, for the composite license to reflect this change.

ATTACHMENT TO LICENSE AMENDMENT NO.

FACILITY OPERATING LICENSE NO. DPR-58 DOCKET NO. 50-315 UNIT 1

LICENSE REMOVE Page 3

INSERT Page 3

C.

This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in IO CFR Chapter I:

Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) aximum Power Level The licensees are authorized to operate the Donald C.

Cook Nuclear Plant, Unit No.

1, at steady state reactor core power levels not to exceed 3250 megawatts (thermal).

(2)

Technical S ecifications The Technical Specifications contained in Appendices A and B,

as revised through Amendment No.

193, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

(3)

Less than Four Loo 0 eration The licensees shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3. 1. 1 of Appendix A to this license) with less than four reactor coolant loops in operation until (a) safety analyses for less than four loop operation have been submitted, and (b) approval for less than four loop operation at power levels above P-7 has been granted by the Commission by amendment of this license.

(4)

Administrative controls for fire protection as described in the licensee's submittals dated January 31, 1977 and October 27, 1977 shall be implemented and maintained.

Amendment No.

fP, Pf, 194

e ry,R REGS 0

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C.

COOK NUCLEAR PLANT UNIT NO.

2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

180 License No.

DPR-74 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

E.

The application for amendment by Indiana Michigan Power Company (the licensee) dated April 6,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I;

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public,'nd (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the following paragraphs of Facility Operating License No.

DPR-74 as follows:

2.C.(3)(m)

Secondar Water Chemist Monitori Pro ram is renumbered to 2.C.(3)(v).

Paragraph 2.C.(3)(o) is amended to read:

2.C.[3)(

)

EI P

Administrative controls for fire protection as described in the licensee's submittals dated January 31, 1977 and October 27, 1977 shall be implemented and maintained.

3.

This license amendment is effective as of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Pages 8 and 9 of License No. DPR-74*

Date of Issuance:

'(.Qp~3. 19,;1.995 Project Directorate III-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

  • Pages 8 and 9 are attached for convenience, for the composite license to reflect this change.

TTACHMENT TO LICENSE AMENDMENT NO. 180 FACILITY OPERATING LICENSE NO.

DPR-74 DOCKET NO. 50-316 UNIT 2 LICENSE REMOVE Page 8

Sa INSERT Page 8

Fire Protection Administrative controls for fire protection as described in the licensee's submittals dated January 31,"'977 and October 27, 1977 shall be implemented and maintained.

Amd. 64, 6-18-84 'eleted per Amd. 121, 5-17-90.

Amd. 6, 6-16-78.

Deleted per Amd. 68, 4-8-85.

S ent Fuel Pool Stora e

The licensee is authorized to store D.

CD Cook, Unit 1

and Unit 2 fuel assemblies, new or irradiated, up to a total of 3613 fuel assemblies in the shared spent fuel pool at the Donald C.

Cook Nuclear Plant subject to the following conditions:

Fuel stored in the spent fuel pool shall not have a

nominal enrichment greater than 4.95X Uranium-235.

Amd. 13, 10-16-79 'eleted per Amd. 63, 4-27-84.

The provisions of Specification 3/4'.7 are not applicable for loads being moved over the pool for the duration of the spent fuel pool reracking project.

Control of loads moving over the spent fuel pool during the spent fuel pool reracking project shall comply with the criteria of NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants."

Administrative controls shall be in place to prevent any load not rigged in compliance with the criteria of NUREG-0612 from passing over the spent fuel pool with the crane interlocks, required by T/S 3/4'.7, disengaged.

Secondar Water Chemistr Honitorin Pro ram The licensee shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation.

This program shall be described in the station chemistry manual and shall include:

l.

Identification of a sampling schedule for the critical parameters and control points for these parameters; 2 ~

Identification of the procedures used to measure the values of the critical parameters; Amendment No. fg, fP,

>PS, SP2

, 180

(v)

Secondar Water Chemistr Honitorin Pro ramcont.

3.

Identification of process sampling points; 4.

Procedure for the recording and management of data; 5.

Procedures defining corrective actions for off control point chemistry conditions; and 6.

A procedure identifying (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective actions.

Amendment No.

fP, 180