ML17332A731
| ML17332A731 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/14/1995 |
| From: | Ring M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| NUDOCS 9504180267 | |
| Download: ML17332A731 (2) | |
Text
je PRIORI EY Z REGULATORYNIBSNQH8179Y+kkl%0TION SYSTEM (RIDS)
ACCESSION NBR:9504180267 DOC.DATE: 95/04/14 NOTARIZED: NO DOCKET t FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION RINGRM.A.
Region 3 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION FITZPATRICK,E.E Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele
SUBJECT:
Notifies of final phase of reduced scope NRC insp of svc water sys operational performance insp scheduled for 950620-30.
DISTRIBUTION CODE:
IEOID COFIES RECEIVED:LTR g ENCL Q SIZE:
TITIE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
RECIPIENT g ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN3 FILE 01 COPIES ITTR ENCL RECIPIENT ID CODE/NAME HICKMANRJ AEOD/SPD/RAB LE CE NRR DORS/OEAB NUDOCS-ABSTRACT OGC/HDS2 COPIES LTTR ENCL EXTERNAL: LITCO BRYCE,J H
NRC PDR NOAC VOTE TO ALL"RIDS" RECIPIENT"fS:
PL E KSE HELP I.'S TO REDL'CE iVASTE!COiTKC:TTHE DOCl.'RIED'I COi'TROL DESK, ROOXI P1.37 (EX'I:5N. 0083 ) TO ELIXIIXXI'EYOI.'R NAXIE !TRODI DIS'I'RlI!I."I'IOiI IS I'S I'OR DOC!.'NIEN'I'S YOL'Oi "I' L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL
April 14, 1995 Mr. E.
E. Fitzpatrick Vice President Indiana Michigan Power Company 1 Riverside Plaza
- Columbus, OH 43216
SUBJECT:
FINAL NRC REVIEW OF THE ESSENTIAL SERVICE WATER SYSTEM INTERNAL ASSESSMENT (NRC INSPECTION REPORTS NO. 50-315/95003(DRS);
NO. 50-316/93015(DRS) )
Dear Mr. FitzpatricP:
This letter is to notify you that the final phase of the reduced scope NRC inspection of the service water system operational performance inspection (SWSOPI) is scheduled for June 20 to June 30, 1995.
We expect that H. A. Walker will be at the D. C.
Cook plant from June 20 through June 24, 1995, with three inspectors on site from June 26 through June 30.
This schedule is contingent upon the completion and issuance of your final internal assessment report prior to May 31, 1995.
If you have questions regarding this schedule or the inspection, please contact Al Walker of my staff at (708) 829-9728.
Sincerely, Docket No. 50-315 Docket No. 50-316
/s/ M. A. Ring, Mark A. Ring, Acting Deputy Director Division of Reactor Safety cc:
A. A. Blind, Plant Manager James R. Padgett, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Michigan Department of Public Health Distribution:
Docket File
, PUBLIC IE-01'C/LFDCB DRP DRS RIII PRR
- SRI, D.
C.
Cook
- LPM, NRR DOCUMENT NAME:
G:DC95003.N02 To teceive a copy of thie document, indicate in the box C' Copy w/o attach/encl F ~ Copy w/attach/enct 'N
~ No copy OFFICE RI II:DRS RIII:DRP RIII:DRS NAME Walker k'ro Rin DATE 04/4 /95 04/]tI 95 04 / /95 9504180267 9504l4 PDR ADOCK 050003l5 D'AQ OFFICIAL RECORD COPY