P R.IC3R.IWY'<ACCELERATED RIDS PROCESSING)~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION HBR:9503160051 DOC.DATE: 95/03/06 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION P
CARTEAUX,P.F.
(formerly Indiana G. Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
R,
SUBJECT:
Transmits one set of approved plant ref matls for use in developing 6 administering upcoming NRC RO
& SRO initial license exams.
0 DISTRIBUTION CODE:
M003D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Requalification Program NOTES RECIPIENT ID CODE/NAME PD3-1 PD INTERNA 'ILE CENTER~$ 1
/DRCH/HOXB EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J NRR/DRCH/HHFB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
C U
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROO!PI Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 8
ENCL 8
C
Cook Nuclear Plant Tralnlng Center One Cook Place Bridgman, Ml 49106 616 465 5901 March 6, 1995 Donald C.
Cook Nuclear Plant Units 1
6 2
Docket Nos.
50-315 and 50-316 License Nos.
SUBJECT:
RO/SRO INITIALLICENSE EXAMINATION Reference Materials U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Attention:
M. P. Phillips
Dear Mr. Phillips:
This letter transmits one set of approved (where appropriate)
Cook Plant reference materials for use in developing and administering our upcoming NRC RO and SRO Initial License Examinations.
Accompanying this letter are twelve (12) boxes containing these materials.
A complete replication of these materials have been sent to Mr. Frank Jaggar of Lockheed Idaho Technology Company.
For your convenience a brief summary of the contents of these boxes is provided.
A complete index of the material is included in box N1 of the shipment.
If you have any questions regarding this submittal or require additional material, please contact Mr. Russell Scott at (616) 466-3332.
Sincerely,
~~+i~~
P.
F. Carteaux Training Superintendent Enclosure c:
A. A. Blind J.
A. Stubblefield T..E., Murley
-J; Isom, Senior NRC Resident Inspector,.
Cook Nuclear Plant R. T. Scott F,
~'aggar, Lockheed Idaho Tech.
Co.
C:NWP51NDOCKEXAM/lf March 6, 1
hCAOfMY
'cR hlUCL~
~ TgAINIYG 9503ih005i 950306 1 Q 0]i'",;,.'PDR ADOCK 05000315 PDR pil00
ATTACHMENT
SUMMARY
OF CONTENTS D. C. Cook Plant Reference Materials in Support of June 19, 1995 USNRC Examination 1.
Training References Lesson Plans - Reactor operator and senior reactor operator lesson plans which include learning objectives.
Per telephone conversation between J. Hanson and Russ Scott, the fundamentals lesson plans will not be included.
Plant System Descriptions - These are not operating procedures
- but, rather, training references for system operation.
Comprehensive Theory Materials - per conversation between J. Hanson and Russ Scott, this materials will not be included.
These materials are available on request.
Job Performance Measures (JPMs) - These include tasks covering local operations and tasks within the control room complex.
2.
Complete index One book is provided with all indexes.
3.
Administrative Procedures Plant Manager Procedures (PMPs)
Plant Manager Instructions (PMls)
Operations Head Instructions (OHls) 4.
Integ'rated Plant Procedures Operations Head Procedures (OHPs)
Normal OHP 4021 Series Page1 of3
ATTACHMENT
~~ 5.
Emergency and Abnormal Procedures Operations Head Procedures (OHPs)
Abnormal OHP 4022 Series Emergency OHP 4023 Series, Appendix R OHP 4025 Series 6.
Standing Orders Plant Manager's Standing Orders (PMSOs)
Operations Standing Orders (OSOs) 7.
Surveillance Procedures Surveillance - OHP 4030 Series Preventative Maintenance Test Procedures (includes Operations Tours)-
OHP 5030 Series 8.
Fuel Handling and Core Loading Procedures Fuel Handling - OHP 4050 Series 9.
Annunciator/Alarm Procedures Annunciator - OHP 4024 Series 10.
Radiation Protection Manual This is incorporated within the PMP 6010.RPP Series.
11.
Emergency Plan Implementing Procedure This is incorporated within the PMP 2080.EPP Series.
12.
Technical Specifications Unit 1 and 2 Technical Specifications and Clarifications Page 2 of 3
A y
~~su,*qg ~a e re',~w
~
~x'~'~
w;~ ~ ~p~g~g.,~
a l
1
ATTACHMENT Refer to Item t4 above.
14.
Technical Data Book The enclosed Technical Data Book does not have a controlled set of precautions, limitations, and setpoints.
This information is contained in individual plant and systems operating procedures as necessary.
15.
Simulator References Listing of pre-programmed initial conditions.
Malfunction-cause.and eff ct which includp '-,an explanation of the ability to vary the severity of a particular malfunction.
Description of local operations and failure capability of instruments and components.
Differences between the simulator and Unit P2 control room.
RO/SRO program simulator training scenarios (lesson plans.)
16.
Piping and Instrument Diagrams This includes electrical one-line diagrams for 4160, 600, and 120 Volt AC and 250 Volt DC.
All flow PID Diagrams (5100/5600 Series Drawings).'lectrical One Line Diagrams (12000 including 4160, 600, and 120V AC and 250 V DC Series.)
Logic/Functional Diagrams covering all major instrument and control systems (98500 Series Drawings.)
Page 3 of 3
1 I
C