|
---|
Category:Letter
MONTHYEARML24270A0652024-09-26026 September 2024 ABWR Design Certification Annual 10 CFR 50.46 Report for 2024 ML23283A0892023-10-10010 October 2023 ESBWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML23277A1702023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ESBWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML22347A2842022-12-0808 December 2022 GE-Hitachi Nuclear Energy Americas, LLC, Accepted Version of NEDO-11209-A Revision 17, GE Hitachi Nuclear Energy Quality Assurance Program Description ML21320A1902021-11-16016 November 2021 Pre-Application Presentation Slides for Amendment to NEDO-11209-A, Rev. 16, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20197A2692020-07-15015 July 2020 Pre-application Presentation Slides for Amendment to NEDO-11209-A Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20184A1582020-07-14014 July 2020 Verification of Accepted Version of NEDO-11209 Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description ML20168A9442020-06-22022 June 2020 Request for Additional Information Regarding Global Nuclear Fuel Proposed Amendment 51 to Topical Report, NEDE-24011-P-A-29, General Electric Standard Application for Reactor Fuel ML20098E9512020-04-0909 April 2020 Proprietary Determination Letter for Global Nuclear Fuel (Gnf) April 3, 2020 Armor Physical Property Data Transmittal - Revision a ML20093B4532020-04-0202 April 2020 GE-Hitachi Nuclear Energy Americas, LLC - Revision of the GE Model No. 2000 (Docket No. 71-9228) to Clarify Irradiated Hardware Content and Update the Quality Assurance Program References ML19282C5772019-11-0505 November 2019 Global Nuclear Fuel - Americans (GNF-A), Request for Withholding Information from Public Disclosure ML19242D0982019-09-19019 September 2019 General Electric Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19242D6962019-09-19019 September 2019 Verification of NEDC-33173P Supplement 6 Revision 1, Licensing Topical Report Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty ML19199A1822019-08-0808 August 2019 Final Safety Evaluation for NEDC-33173P Supplement 6 - Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Raito (SLMCPR) Penalty ML19094A0582019-04-25025 April 2019 Verification of GE Hitachi Topical Report NEDC-33173 Supplement 5p-A, Revision 1, Applicability of General Electric Methods to Expanded Operating Domains - Supplement for GNF3 Fuel ML19094A9182019-04-25025 April 2019 General Electric Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19071A1012019-03-26026 March 2019 Draft Safety Evaluation for NEDC-33173p Supplement 6 - Applicability of General Electric Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio Penalty ML19074A0542019-03-21021 March 2019 Imltr Supplement 5 Final SE Non-Proprietary ML19065A0032019-03-15015 March 2019 Gestar Amendment 46 Final SE ML19016A4072019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19017A0432019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, Llc, Request for Withholding Information from Public Disclosure ML19002A3762019-02-0505 February 2019 Draft Safety Evaluation for NEDC-33173p Supplement 5 and Applicability of GE Methods to Expanded Operating Domains and Supplement for GNF3 Fuel ML18256A0132018-09-12012 September 2018 Proposed Amendment 47 to NEDE-24011-P-A-27, General Electric Standard Application for Reactor Fuel (Gestar Ii) Supporting Implementation of TSTF-564 ML18204A0252018-07-30030 July 2018 Final Safety Evaluation for Global Nuclear Fuel - Americas, LLC, Proposed Amendment 43 to NEDE-24011-P-A-23, General Electric Standard Application for Reactor Fuel (Gestarii) Section 3.4 ML18212A0182018-07-30030 July 2018 Global Nuclear Fuel - Submittal of Revised Information Supporting TSTF-564 Safety Limit Minimum Critical Power Ratio ML18194A5422018-07-13013 July 2018 Draft Safety Evaluation for Amendment 43 to Global Nuclear Fuel - Americas Topical Report NEDE-24011-P-A-US, General Electric Standard Application for Reactor Fuel (Gestar Ii) Section 3.4 Final Core Loading Pattern Comparison ML18155A2102018-06-22022 June 2018 Verification of GE Hitachi Topical Report NEDE-33005P-A, Revision 2 Tracg Application for Emergency Core Cooling Systems/Loss-of Coolant Accident Analysis for BWR/2-6 ML18129A0242018-05-11011 May 2018 Final Safety Evaluation for Licensing Topical Report Nede 33005P-A / NEDO-33005-A, Tracg Application for Emergency Core Cooling Systems / Loss-Of-Coolant-Accident Analysis for BWR/2-6 Satisfaction of Limitation 10.7 ML18101A0142018-04-30030 April 2018 Acceptance for Review of Global Nuclear Fuel Proposed Amendment 46 to NEDE-24011-P-A-26, General Electric Standard Application for Reactor Fuel (Gestar II) ML18117A3112018-04-27027 April 2018 Draft Safety Evaluation for Licensing Topical Report NEDE-33005P-A / NEDO-33005-A, Tracg Application for Emergency Core Cooling Systems / Loss-of-Coolant-Accident Analysis for BWR/2-6 Satisfaction of Limitation 10.7 ML18078A5872018-04-10010 April 2018 Satisfaction of TRACG-LOCA Limitation 10.7 Draft SE Cover Letter ML18046A6392018-03-0606 March 2018 Proprietary Determination Letter for TRACG-LOCA Satisfaction of Limitation 10.7 RAI Response ML18004A5772018-01-22022 January 2018 Proprietary Determination Letter for GNF3 Generic Compliance Report ML18008A1032018-01-22022 January 2018 Global Nuclear Fuel - Americas, Llc., Request for Withholding Information from Public Disclosure on Optima-2 Dryout, Dated 08/03/2017 ML18002A4322018-01-10010 January 2018 Final SE for Amendment to NEDO-11209 Revision 13 GE QAPD ML17332A6012018-01-0909 January 2018 Proprietary Determination Letter for NEDC-33840P-A, Prime Model for Transient Analysis ML17342A1012018-01-0909 January 2018 Proprietary Determination Letter for Nsf Annual Experience Summary Report ML17347B1992018-01-0909 January 2018 GNF2 Compliance Report Proprietary Determination Letter ML17332A2962018-01-0505 January 2018 Final Safety Evaluation for Global Nuclear Fuel - Americas, LLC, Proposed Amendment 44 to NEDE-24011-P-A-24 ML17341A9432018-01-0505 January 2018 Verification Letter for the Approved Version of NEDC-33840P (Prime) ML17261A8962017-09-28028 September 2017 Proprietary Determination Letter for LANCR02 ML17261A8632017-09-27027 September 2017 Verification Letter for LANCR02 Physics Model Description and Qualification (NEDC-33376P and NEDC-33377P) ML0209102082002-03-25025 March 2002 Odyn Option a & B Statistical Adders GE14 Fuel for Clinton Power Station (PANAC10/PANAC11)-Project No. 712 2024-09-26
[Table view] Category:Proprietary Information Review
MONTHYEARML20100L8692020-04-14014 April 2020 GE-Hitachi Nuclear Energy - Americas, LLC Request for Withholding Tracg Biases, Uncertainties and Statistical Adders from Public Disclosure ML20098E9512020-04-0909 April 2020 Proprietary Determination Letter for Global Nuclear Fuel (Gnf) April 3, 2020 Armor Physical Property Data Transmittal - Revision a ML19094A9182019-04-25025 April 2019 General Electric Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML19017A0432019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, Llc, Request for Withholding Information from Public Disclosure ML19016A4072019-03-0505 March 2019 GE Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML18155A3652018-06-26026 June 2018 GE-Hitachi Nuclear Energy Americas, LLC, Request for Withholding Information from Public Disclosure ML18046A6392018-03-0606 March 2018 Proprietary Determination Letter for TRACG-LOCA Satisfaction of Limitation 10.7 RAI Response ML18004A5772018-01-22022 January 2018 Proprietary Determination Letter for GNF3 Generic Compliance Report ML17347B1992018-01-0909 January 2018 GNF2 Compliance Report Proprietary Determination Letter ML17342A1012018-01-0909 January 2018 Proprietary Determination Letter for Nsf Annual Experience Summary Report ML17332A6012018-01-0909 January 2018 Proprietary Determination Letter for NEDC-33840P-A, Prime Model for Transient Analysis ML17261A8962017-09-28028 September 2017 Proprietary Determination Letter for LANCR02 2020-04-09
[Table view] |
Text
January 9, 2018 Mr. Jerald G. Head Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-18 Wilmington, NC 28401-0780
SUBJECT:
GLOBAL NUCLEAR FUEL - AMERICAS (GNF-A), LLC, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE
Dear Mr. Head:
By letter dated August 18, 2017 (Letter No. M170194, Agencywide Documents Access and Management System (ADAMS) Accession No. ML17230A010), an affidavit dated August 16, 2017, was executed and submitted by Dr. Brian R. Moore, General Manager, Core & Fuel Engineering, GNF-A, requesting that the information contained in GNF-A proprietary report, NEDC-33840P-A, The PRIME Model for Transient Analysis of Fuel Rod Thermal - Mechanical performance, Revision 1, August 2017, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and is available in ADAMS at Accession No. ML17230A012.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because it is:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-As competitors without license from GNF-A constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
J. Head Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1002.
Sincerely,
/RA/
Joseph A. Golla, Project Manager Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 99902024 cc: See next page
ML17332A601; *concurred via e-mail NRR-106 OFFICE NRR/DLP/PLPB NRR/DLP/PLPB* NRR/DSS NRR/DLP/PLPB NRR/DPR/PLPB NAME JGolla DHarrison PClifford DMorey JGolla DATE 1/3/2018 12/19/2017 1/3/2018 1/5/2018 1/9/2018 GE-Hitachi Nuclear Energy Americas Project No. 712 cc:
Dr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel - Americas, LLC P.O. Box 780, M/C A-75 Wilmington, NC 28401-0780 Brian.moore@gnf.com Mr. James F. Harrison GE-Hitachi Nuclear Energy Americas LLC Vice President - Fuel Licensing P.O. Box 780, M/C A-55 Wilmington, NC 28401-0780 james.harrison@ge.com Ms. Patricia L. Campbell Vice President, Washington Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 1299 Pennsylvania Avenue, NW 9th Floor Washington, DC 20004 patriciaL.campbell@ge.com