Text

PRIQRITY 1

ACCELERATED RIDS PROCESSING t

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9502140385 DOC.DATE: 95/01/31 NOTARIZED: NO DOCKET I FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BUBLICK,D.L.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Jan 1995 for DC Cook Nuclear Plant Unit 1.W/950207 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES 0

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL: LITCO BRYCE, J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J ILE CENTEEL 1

NRR/DOPS/OECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 D

0 C

U E'

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI THE DOCU~fENTCONTROL DESK, ROOhf P 1-37 (EXT. 504-2083 ) TO ELIkflNATEYOUR NAME F RO~f DISTRIBUTIONLISTS I:OR DOCUMENTS YOU DON"I'<LED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

I 0

I

~

V l

t,

indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgrnan, Ml 49106 416 465 5901 February 7,

1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of January 1995 is submitted.

Respectf lly,

.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S. J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo g ~gg9on 9502140385 950131 PDR ADOt:K 05000315 R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 07/Feb/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Reporting Period Jan 1995 notes
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17 'ross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24, Shutdowns Scheduled over Next Six None This Mo.

Yr.

744.0 744.0 0.0 744.0 0.0 2344805 768830 741655 100.0 100.0 99.7 97.7 0.0 Months (Type, to Date 744.0 744.0 0.0 744.0 0.0 2344805 768830 741655 100.0 100.0 99.7 97.7 0.0 Date,and Cumm.

176064.0 132654.9 463.0 130567.6 321.0 384465382 124774270 120022970 75.1 75.1 67.9 66.2

5.7 Duration)

25. If Shut Down At End of Report period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-315 UNIT ONE DATE 07/Feb/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 Jan 1995 DAY 95/01/01 95/01/02 95/01/03 95/01/04 95/01/05 95/01/06 95/01/07 95/01/08 95/01/09 95/01/10 95/01/11 95/01/12 95/01/13 95/01/14 95/01/15 95/01/16 AVERAGE DAILY POWER LEVEL 1030 1031 1030 1032 1028 1030 1030 1032 1029 1030 1037 1033 916 537 639 1008 DAY 95/01/17 95/01/18 95/01/19 95/01/20 95/01/21 95/01/22 95/01/23 95/01/24 95/01/25 95/01/26 95/01/27 95/01/28 95/01/29 95/01/30 95/01/31 AVERAGE DAILY POWER LEVEL 1029 1027 1027 1028 1030 1028 1027 1030 1031 1030 1029 1031 1028 1033 1024

DOCKET O.:

UNIT NAME'OMPLETED BY:

TELEPHONE'ATE:

PAGE:

50-315 D.C. Cook Unit 1

D. L. Bublick (616) 465-5901 Feb 2, 1995 Page 1 of 1

MONTHLY OPERATING ACTIVITIES JANUARY 1995

. HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of January was 768830 MWH.

DETAILS 1-13-95 1-14-95 1-15-95 1100 Commenced reactor power decrease in support of the West Main Feed Pump water box cleanup.

0330 Reactor power stabilized at 55K RTP.

Commenced West Main Feed Pump water box cleanup.

1030 West Main Feed Pump water box cleanup completed.

Commenced reactor power increase to 100%

RTP.

1-16-95 0830 Reactor power stabilized at 100% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JANUARY 1995 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

D. C.

COOK UNIT 1 Feb 2, 1995 D. L. Bublick (616) 465-5901 Page 1 of 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO.

CODE CODE TO PREVENT RECURRENCE 315 950114 S

31. 0 N/A N/A N/A Reactor power was decreased to 558 RTP on 950114 at 0330 in support of water box cleanup on the West Main Feed Pump.

Cleanup was completed on 950115 at 1030.

The unit was returned to 100K RTP on 950116 at 0830.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination

. F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source