Text

P RIORITY 1

ACCELERATED RIDS PROCESSING I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9501190159 DOC.DATE: 94/12/31 NOTARIZED: NO DOCKET I FACXL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Dec 1994 for Donald C Cook Plant Unit 2.W/950111 ltr.

DISTRIBUTION CODE:

XE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J LE CENTER 03.

NRR/DOPS/OECB NOAC COPXES LTTR ENCL 1

1 1

1 1

1 1

1 D

0 U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE KVASTE! CONTACTTI.IE DOCUhIENTCONTROL DESK. ROOM Pl-37 (EXT. 504-2083 ) TO ELlhIINATEYOUR 4AhIE FROhf DISTRIBUTIONLISTS I'OR DOCL'MEN'I'S YOU DONEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 January 11, 1995 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of December 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment ci

><J Q/j Q NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo

(

9501190159 941231 PDR ADOCK 050003ib R

...,,,PDR

N.R.C.

OPERAT G DATA REPORT DOCKET NO.

50-316 DATE 06/Jan/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C.

Cook Unit 2

2. Reporting Period Dec 1994
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11 'ours in Reporting Period 12.

No. of Hrs. Reactor Was Critical 13 'eactor Reserve Shutdown Hours

14. Hours Generator on Line
15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect. Energy'en.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 8760.0

-492.4 5167.5 0.0 0.0 438.1 4759.2 0.0 0.0 1006215 11984087 312580 3699090 297086 3531453 58.9 54.3 58.9 54.3 37.7 38.0 36.6 37.0 10.4 24.3 Months (Type, Date,and Cumm.

149016.0 100016.5 0.0 96535.1 0.0 294098182 95306990 91757435 65.8 65.8 58.9 S7.4 15.8 Duration):

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

V

A RAGE DAILY POWER LEVEL (MWe-Net) a DOCKET NO.

50-316 UNIT TWO

'ATE 06/Jan/95 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 DAY 94/12/01 94/12/02 94/12/03 94/12/04 94/12/05 94/12/06 94/12/07 94/12/08 94/12/09 94/12/10 94/12/11 94/12/12 94/12/13 94/12/14 94/12/15 94/12/16 MONTH AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 u

p p

0 0

9 0

28 237 278 426 Dec 1994 DAY 94/12/17 94/12/18 94/12/19 94/12/20 94/12/21 94/12/22 94/12/23 94/12/24 94/12/25 94/12/26 94/12/27 94/12/28 94/12/29

'4/12/30 94/12/31 AVERAGE DAILY POWER LEVEL 426 434 536 558 566 683 699 706 705 803 972 1058 1084 1087 1083

DOCKET UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-316 D.C.

Cook Unit 2 D. L. Bublick (616) 465-5901 Jan 5, 1995 Page 1 of 2 MONTHLY OPERATING ACTIVITIES DECEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 3.

The Unit was shutdown in support of the cycle 9 to 10 maintenance/refueling outage.

The reactor was taken critical on December 10, 1994 at 0804 for the first time in cycle 10.

The first entry into Mode 1 was made on December 11, 1994 at 1049.

The main turbine generator was paralleled to the grid on December 11, 1994 at 1514.

During the subsequent power increase a reactor trip at 194 RTP occurred which was generated from an MSR high level trip signal.

The cause of the trip signal could not be conclusively determined.

The reactor was taken critical on December 12, 1994 at 2033.

Mode 1 was entered on December 12, 1994 at 2250.

.The main turbine generator was paralleled to the grid on December 13, 1994 at 1949.

Reactor power increase was commenced per the power ascension program.

The unit exited this reporting period in Mode 1 at 100%

RTP There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of December was 312580 MWH.

DETAILS 12-4-94 12-5-94 1659 0148 Commenced RCS cooldown.

Enteied Reactor Mode 4.

12-6-94 12-7-94 1456 2335 0026 1219 Entered Reactor Mode 5.

Commenced RCS heatup.

Entered Reactor Mode 4.

Entered Reactor Mode 3.

12-10-94 0720 0804 Entered Reactor Mode 2.

The Reactor was critical; first time in Cycle 10.

DOCKET O.:

UNIT NAME COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-316 D.C.

Cook Unit 2 D. L. Bublick (616) 465-5901 Zan 5, 1995 Page 2 of 2 MONTHLY OPERATING ACTIVITIES DECEMBER 1994 1049 1131 1208 1514 1705 1451 2033 2055 2250 2323 1949 2105 1125 1910 Entered Reactor Mode 1.

Reactor power stabilized at 84 RTP.

Started Main Turbine Generator roll.

Main Turbine Generator paralleled to the grid.

Reactor trip occurred, generated by an MSR high level trip signal.

Entered Reactor Mode 3.

Entered Reactor Mode 2.

The Reactor was critical.

Reactor power stabilized at 24 RTP.

Entered Reactor Mode l.

Reactor power stabilized at 84 RTP.

Reset the Main Turbine Generator.

Paralleled the Main Turbine Generator to the grid.

Reactor power stabilized at 30% RTP.

Commenced Reactor power increase per the power ascension program.

Reactor power stabilized at 100% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH. DECEMBER 1994 UNIT NAME:

DATE!

COMPLETED BY TELEPHONE:

PAGE$

DE C, COOK UNIT 2 Jan 5, 1995 D. L. Bublick (616) 465-5901 Page 1 of 1 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE HOURS

REASON REACTOR3 REPORT NO.

CODE CODE5 TO PREVENT RECURRENCE 239 940906 S

240 941211 F

279.2 50.7 B,C H

N/A 94-008 N/A IB N/A LS The unit was removed from service on 940906 at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> EDT for the cycle 9 to 10 refueling/maintenance outage.

All refueling and maintenance activities were completed and the

-main turbine generator was paralleled to the grid at 1514 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.76077e-4 months <br /> on 941211.

Total length of the outage was 2339.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />.

During power escalation, with the reactor power at 19't RTP, an MSR high level trip signal was generated followed by a reactor trip at 1705 hours0.0197 days <br />0.474 hours <br />0.00282 weeks <br />6.487525e-4 months <br /> on 941211.

The cause of the trip signal could not be conclusively determined.

The unit was paralleled to the grid at 1949 hours0.0226 days <br />0.541 hours <br />0.00322 weeks <br />7.415945e-4 months <br /> on 941213.

1 F:

Forced S:

Scheduled 2

Reasons A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Admini.strative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G <<. Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source