Monthly Operating Rept for Nov 1994 for DC Cook Nuclear Plant Unit 2.W/941208 Ltr
ML17332A476
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/30/1994
From: Blind A, Bublick D, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412220106
Download: ML17332A476 (7)


Text

~ r ~

PRIORITY

'(ACCEI ERATED RIDS PROCESSING REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9412220106 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET g FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION JANISSE,J.D. Indiana Michigan Power Co. (formerly Xndiana & Michigan Ele BUBKICK,D.L. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPXENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1994 for DC Cook Nuclear Plant Unit 2.W/941208 ltr.

DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD 1 1 HICKMAN,J 1 1 XNTERNAL: AEOD/SPD/RRAB 1 1 ~EXLE CENTER ~0 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN3 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE! CONTACT'I'HE DOCL'ifENTCONTROL DESK, ROOM Pl-37 I EXT. 504-2083 I TO ELIhflNATEYOUR NA.'iIE PROif DIS'I'RIBU'I'IONLIS'I'S I'OR DOC!. 41EN'I'S YOU DON"I'L'L'D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

indiana Michigan Power Company

~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 ENIMdhNSl

'GliiCNIGQH POWM December 8, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1994 is submitted.

Respectfully, g.g A.A. Blind Plant Manager Attachment C~ NRC Region D.R. Hahn III R.C. Callen S. Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J. Brewer

'D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo 9412220106 941130

.PDR ADOCK 050003ih PDR

N.R.C ~ OPERATING DATA REPORT DOCKET NO. 50-316 DATE 01/Dec/94 COMPLETED BYJ 0 Janisse TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name '

D. C. Cook Unit 2

2. Reporting'Period Nov 1994 notes
3. Licensed Thermal Power (HWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100.
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings ( Items no. 3 through 7) Since

, Last Report Give Reasons

9. ower eve o ic es ric e ny e e If

~

10. Reasons For Res'trictions. Any:

is o. r. o a e Umm.

11. Hours in Reporting Period 720.0 8016.0 148272.0
12. No. of Hrs. Reactor Was Critical 0 0

~ 4675.1 99524.1

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 4321.1 96097.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 0 10977872 293091967
17. Gross Elect. Energy Gen. (MWH) 0 3386510 94994410
18. Net Elect. Energy Gen. (MWH) 0 3234367 91460349 19 'nit Service Factor
20. Unit Availability Factor 0.0 0'

53.9 53.9 65 9 F

65.9

21. Unit Capacity Factor (MOC Net) 0.0 38.1 59.0
22. Unit Capacity Factor (DER Net) 0.0 . 37 ' 57.5
23. Unit Forced Outage Rate 0.0 25 ' 15.8
24. Shutdowns Scheduled over Next Six Months (Type. Date.and Duration):

None

25. u own n o epor erio . s ima e a e o ar up:

December 11 1994

26. ni s in es a us rior o ommercia pera ion  :

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-.Net)

DOCKET NO. 50-316 UNIT TWO DATE 01/Dec/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 MONTH Nov 1994 AVERAGE DAILY AVERAGE DAILY DAY 'OWER LEVEL DAY POWER LEVEL 94/11/01 0 94/11/17 0 94/11/02 0 94/11/18 0 94/11/03 0 94/11/19 0 94/11/04 0 94/11/20 0 94/11/05 0 94/11/21. 0 94/11/06 0 94/11/22 0 94/11/07 0 94/11/23 , 0 91/11/08 0 94/11/24 0 94/11/09 0 94/11/25 "0 94/11/10 0 94/11/26 0 94/11/11 0 94/11/27 0 94/11/12 0 94/11/28 0 94/11/13 0 94/11/29 0 94/11/14 0 94/11/30 0 94/11/15 0 94/11/16 0

~ ~ '

DOCKET 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 DATE: Dec 6, 1994 PAGE Page 1 of 1 MONTHLY OPERATING ACTIVITIES NOVEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 5. The unit remained shutdown during this reporting period in support of the cycle 9 to 10 maintenance/refueling outage.

The unit exited this reporting period in Mode 3.

There were no challenges to the pressurizer safety valves or power operated relief valves.

j)

Gross electrical generation for the month of November was 0 MWH.

DETAILS 11-20-94 , 1141 Entered Reactor Mode 4.

11-21-94 1700 Commenced cooldown of RCS due to leakage identified on g2 and g3 Steam Generator Primary Side Manways.

11-22-94 0427 Entered Reactor Mode 5.

11-28-94 1159 Commenced RCS heatup for entry into Mode 4.

1330 Entered Reactor Mode 4.

11-29-94 0845 Commenced RCS heatup for entry into Mode 3.

0852 Entered Reactor Mode 3.

C ~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D- C. COOK UNIT 2 DATE Dec 6, 1994 REPORT MONTHs NOVEMBER 1994 COMPLETED BY: D. L. Bublick TELEPHONE: (616) 465-5901 PAGE: Page 1 of 1 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM CODE'OMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE TO PREVENT RECURRENCE 239 940906 S 720 B,C N/A N/A N/A The unit remained shutdown for the cycle 9 to 10 maintenance/refueling cutage throughout thi.s reporting period.

~

1 2 3 4 5 F: Forced Reason: Method: Exhibit G - Instructions Exhibit, I: Same S: Scheduled A: Equipment Failure (Explai.n) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Trai.ning and License Examination F: Admini.strative G: Operational Error (Explain)

H: Other (Explai.n)