Monthly Operating Rept for Nov 1994 for DC Cook Nuclear Plant Unit 1
ML17332A475
Person / Time
Site: Cook 
Issue date: 11/30/1994
From: Blind A, Bublick D, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9412220099
Download: ML17332A475 (8)


Text

PRIQRITY (ACCE LERATED R IDS P ROC ESSIVE G

.REGULATORY INFORMATION DXSTRXBUTXON SYSTEM (RIDS)

ACCESSION NBR:9412220099 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET g

FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BUBLICK,D.L.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLXND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1994 for DC Cook Nuclear Plant Unit 1.W/941208 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCLI SIZE: -5 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J FILE CENTER 0~1 NRR/DOPS/OECB NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 i%OTE TO ALL"RIDS" R ECI PI EYTS:

PLEASE HELP US TO REDUCE iVASTE!COYTACT'II IE DOC! 'i!ENTCONTROL DESK. ROO!il P 1-37 (E7i'T. 504-TOS3 ) TO ELI lALII NATE YOUR NAifE F ROTI DISTRIBUTIONLIS'I'S I'OR DOC!. 2iIEi'I'S YOI'Oi'"I'ITI'.D!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 10 ENCL 10

g

~

~

~

S r

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 I

I8MSlHsl SNCNIIIMM POWM December 8,

1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c,

NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo 9412220099

'F41130 PDR

".ADOCK'05000315 R

PDR

c

~

~

C

'I

~ I

~

~

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01/Dec/94 COMPLETED BYJ D Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period Nov 1994 notes
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

ower eve o

ic es nc e y

e e

10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None 1S o.

I 720.0 720 '

0.0 720.0 0.0 2335421 762950 736409 100.0 100.0 102.3 100.3 0.0 Months (Type.

o ae 8016.0 5512.5 0.0 5471.0 0.0 16180679 5192390 4996455 68.3

,68.3

'62. 3 61.1 0.0 Date.and ulllll.

174576:0 131166.9 463.0 129079.6 321.0 379706454 123215050 118518253 74.8 74.8 67.6 65.9

5.8 Duration)

25.

u own n

o epor ergo s

ima e a e o ar up:

26.

ns s

>n es a us r>or o

ommercia pera son Forecast Achieved INITIALCRITICAI ITY INITIAL ELECTRICITY COMMERCIAL OPERATION

~

V AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-315 UNIT ONE DATE 01/Dec/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 Nov 1994 DAY 94/11/01 94/11/02 94/11/03 94/11/04

.94/11/05 94/11/06 94/11/07 94/11/08 94/ll/09 94/11/10 94/11/11 94/11/12 94/11/13 94/ll/14 94/11/15 94/11/16 AVERAGE DAILY POWER LEVEL 1022 1022 1022 1024 1024 1025 1021 1023 1023 1026 1027 1026 1026 1027 1024 1029 DAY 94/11/17 94/ll/18 94/11/19 94/11/20 94/11/21 94/11/22 94/11/23 94/11/24 94/ll/25 94/11/26 94/11/27 94/11/28 94/11/29 94/ll/30 AVERAGE DAILY POWER LEVEL 1027 1013 1014 1023 1024 1019 1021 1020 1022 1022 1023 1019 1022 1025

DOCKET O.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE 50-315 D.C. Cook Unit 1 D. L. Bublick (616) 465-5901 Dec 6, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES NOVEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 1004 RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of November was 762950 MWH.

DETAILS 11-18-94 1900 Commenced Reactor power reduction to 924 RTP for Main Turbine and Feed Pump Valve testing.

2207 Reactor power stabilized at 924 RTP.

2250 Commenced Main Turbine and Feed Pump Valve testing.

11-19-94 0014 Main Turbine and Feed Pump Valve testing completed.

0020 Commenced Reactor power increase to 1004 RTP.

0440 Reactor power stabilized at 100% RTP.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 1994 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

D. C.

COOK UNIT 1, Dec 6, 1994 D. L. Bublick (616) 465-5901 Page 1 pf 1 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON~

REACTOR~

LICENSEE EVENT REPORT NO.

SYSTEM CODE COMPONENT CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions from 100%

RTP this month.

1 F

S Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:. Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

0

~ + W 4

0