Monthly Operating Rept for Oct 1994 for DC Cook Nuclear Plant Unit 2
ML17332A428
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/31/1994
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9411230217
Download: ML17332A428 (7)


Text

P R.XC3R.IWY ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSICH NBR:9411230217 DOC.DATE: 94/10/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1994 for DC Cook Nuclear Plant Unit 2.W/941116 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating

Report, (per Tech Specs)

NOTES RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DORS/OEAB RGN3 EXTERNAL: LITCO BRYCE,J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J CENTER 0

NOAC E

NRR/PMAS/IRCB-E COPIES LTTR ENCL 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI THE DOC! 'CLIENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIihIIVATEYOUR NA!i!EPRO~I DISTRIBUTIONLISTS I'OR DOCI 'MEN'I'S YOU DON"I' v'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

Indiana Michigan ~

Power Company Cook Nuclear Plant One Cook Place Bridgman, MI 49106 616 465 5901

à November 16, 1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of October 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c

NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger M.E. Russo I

9411230217 941031 PDR 'DOCK 'i 0500031b

.R,,... PDR,.

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 02/Nov/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period October 1994 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable -Capacity (Net MWe) 1060 8.

Zf Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted.

Zf Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date 744 '

7296.0 0.0 4675.1 0.0 0.0 0.0 4321.1 0.0 0.0 0

10977872 0

3386510 0

3234367 0.0 59.2 0.0 59.2 0.0 41.8 0.0 40.7 25.4 Months (Type, Date,and 11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical,

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH) 17 'ross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six Cumm.

147552.0 99524.1 0;0 96097.0 0.0 293091967 94994410 91460349 66.2 66.2 59.3 57.8 15.8 Duration):

25. If Shut Down At End of Report period, Estimated Date of Startup:

November 25 1994

26. Units in Test Status (prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

)

'VERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 03/Nov/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 MONTH October 1994 DAY 94/10/01 94/10/02 94/10/03 94/10/04 94/10/05 94/10/06 94/10/07 94/10/08 94/10/09 94/10/10 94/10/11 94/10/12 94/10/13 94/10/14 94/10/15 94/10/16 AVERAGE DAILY.

POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 DAY 94/10/17 94/10/18 94/10/19 94/10/20 94/10/21 94/10/22 94/10/23 94/10/24 94/10/25 94/10/26 94/10/27 94/10/28 94/10/29 94/10/30 94/10/31 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH OCTOBER 1994 UNIT NAME:

DATEs COMPLETED BY:

TELEPHONE:

PAGE$

D.

C COOK UNIT Nov 8, 1994 D. L. Bublick (616) 465-5901 Page 1 of 1 2'ETHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE HOURS REASONS REACTOR~

REPORT NO CODE CODEi TO PREVENT RECURRENCE 239 940906 S

744 B,C N/A N/A N/A The unit remained shutdown for the cycle 9 to 10 maintenance/refueling outage throughout this reporting period.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

l DOCKET NO--

UNIT NAME-COMPLETED BY:

TELEPHONE-DATE PAGE 50-316 D.C.

Cook Unit 2 D. L. Bublick (616) 465-5901 Nov 8, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES OCTOBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 6 with the core off loaded.

The unit remained shutdown during this reporting period in support of the cycle 9 to 10 maintenance/refueling outage.

Reactor core reload commenced on October 18 and was completed on October 21.

The reactor head was set on October -24.

The unit exited this reporting period in Mode 5.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of October was 0 MWH.

DETAILS 10-18-94 1427 Commenced fuel movement and Reactor core fuel reload.

10-21-94 10-24-94 10-25-94 0335 0010 1300 Reactor core fuel reload completed.

Reactor vessel head was set.

Entered Reactor Mode 5.