PR.IC3R.I EY'CELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9410260090 DOC.DATE: 94/09/30 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit. 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele BIBLICK,D.L.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele P
BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
Monthly operating rept for Sept 1994 for DC Cook Nuclear Plant, Unit 2.W/941017 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE-TITLE: Monthly Operating Report (per Tech Specs NOTES 0
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DORS/OEAB RGN3 EXTERNAL EG &G BRYCE iJ
~ H NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J C
E~R R~MAS7IRCB-E NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
0 U
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVKSTE!CONTACT'I'IIEDOC!'ifENTCONTROL DESK, ROOKf P I -37 (EXT. 504-2083 ) TO E Lfhfl.'CATE YOUR NAifL F RO! I DISTRIBUTION LISTS FOR DOC!.'MEi'I'SYOI.'ON"I' L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~
'0
~
s t'.'(
4
'I Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 October 17, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of September 1994 is submitted.
Respectfully, z.e ~
A.A. Blind Plant: Manager Attachment c
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department.
E.E. Fitzpatrick W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo PCflAAa
'P410260090 940930 FDR ADaCK OS0003ie R
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 04/Oct/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Per iod September notes
- 3. Licensed Thermal Power (HWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Haximum Dependable Capacity (GROSS HWe) 1100 7.
Haximum Dependable Capacity (Net HWe) 1060
- 8. If Changes Occur in Capacity Ratings
( Items no.
3 through 7) Since Last Report Give Reasons 9.
10.
ower evel o
ic estricte Reasons For Restrictions. If Any:
ny et e
ll. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen
~
(HWH) 17.
Gross Elect.
Energy Gen.
(MWH) 18.
Net Elect.
Energy Gen.
(HWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (HDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six ls o.
I.
720.0 122.8 0.0 122.3 0.0 185766 53990 49925 17.0 17.0 6.5 6.4 0.0 Months (Type, to ate 6552.0 4675.1 0.0 4321.1 0.0 10977872 3386510 3234367 66.0 66.0 46.6 45.3 25.4 Date.and Umm.
146808.0 99524.1 0.0 96097.0 0.0 293091967 94994410
.91460349 66.5 66.5 59.6 58.1 15.8 Duration):
25 u
own n
o epor erio s imate a e o ar up:
November 15, 1994 26:
ni s in es a us rior to ommercia peration Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
MONTH DOCKET NO.
50-316 UNIT TWO DATE 04/Oct/94 COMPLETED SY J D Janisse TELEPHONE 616-465-5901 September DAY 94/09/01 94/09/02 94/09/03 94/09/04 94/09/05 94/09/06 94/09/07 94/09/08 94/09/09 94/09/19 94/09/11 94/09/12 94/09/13 94/09/14 94/09/15 94/09/16 AVERAGE DAILY POWER LEVEL 437 426 410 412
'385 9
0 0
0 0
0 0
0 0
0 0
DAY 94/09/17 94/09/18 94/09/19 94/09/20 94/09/21 94/09/22 94/09/23 94/09/24 94/09/25 94/09/26 94/09/27 94/09/28 94/09/29 94/09/30 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0
DOCKET'N UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE 50-316 D.C.
Cook Unit 2 D. L. Bublick (616) 465-5901 Oct 7, 1994 Page 1 of 2
MONTHLY OPERATING ACTIVITIES SEPTEMBER 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 484 RTP.
End of core life power coastdown program continued in preparation for the cycle 9 to 10 refueling outage.
Coastdown was completed on 940906 at 0317.
The unit was removed from service on 940906 at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> EDT for the cycle 9 to 10 refueling/maintenance outage.
The unit exited this reporting period in Mode 6 at 0> RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of September was 53990 MWH.
DETAILS 9-6-94 0317 0318 Tripped Main Turbine at 7.5% RTP.
Output breakers opened manually due to limit switch failure.
0348 Tripped Reactor at 1.2% RTP; entered Reactor Mode 3.
9-7-94 0535 1708 2358 0718 Commenced RCS Degas.
Began RCS cooldown and depressurization.
Entered Reactor Mode 4.
Commenced RCS cooldown to Reactor Mode 5.
1240 Entered Reactor Mode 5.
9-9-94 1535 Made a four hour report to the NRC due to as found leakage for 2-NS-357 exceeding T.S. 3.6.1.2 Local Leak Rate Test.
9-10-94 9-13-94 0111 2348 Commenced RCS Cooldown and Depressurization.
Entered Reactor Mode 6.
~ ~
DOCKET N UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.C.
Cook Unit, 2 D. L. Bublick (616) 465-5901 Oct 7, 1994 Page 2 of 2 MONTHLY OPERATING ACTIVITIES SEPTEMBER 1994 9-18-94 9-20-94 1155 1421 Started latching first fuel assembly; commenced fuel movement.
All fuel removed from reactor core; last fuel assembly placed in the SFP
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: SEPTEMBER 1994 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGEI D.
Co COOK UNIT 2 Oct 7, 1994 D. L. Bublick (616) 465-5901 Page 1 of 1 DURATION NOi DATE TYPE!
HOURS METHOD OF SHUTTING DOWN REASONS REACTOR~
LICENSEE EVENT REPORT NO.
SYSTEM CODE COMPONENT CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 237 940708 S
239 940906 S
N/A 596.7 H
B,C N/A N/A N/A N/A N/A N/A End of core life power coastdown program continued in preparation for the cycle 9 to 10 refueling outage.
Coastdown program completed on 940906 at 0317.
The unit was removed from service on 940906 at 0318 hours0.00368 days <br />0.0883 hours <br />5.257936e-4 weeks <br />1.20999e-4 months <br /> EDT for the cycle 9 to 10 refueling outage.
1 F:
S:
Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I: